Foundation
Footing No = FC2
Column No = C2,C4,C5,C7
Design Code = NSCP C101 - 2015
Depth of founding layer = 0.3 m
Density of Soil = 17.23 kN/cum
Soil Bearing Capacity = 264 kN/sqm
Gross Bearing Capacity = 269.17 kN/sqm
Permissible SBC Increase for EQ = 25 %
Permissible SBC Increase for Wind = 0 %
Live Load Reduction = 0 %
Design cross section by = Average pressure
Footing Type : Pad
Footing Size (L X B X D) : 2100mm X 2100mm X 300mm
Area of Footing (Af) = LXB
= 4.41 sqm
Section Modulus, Zxx = B x L^2 / 6
= 1.54 cum
Section Modulus, Zyy = L x B^2 / 6
= 1.54 cum
Without considering Effect of Water Table
Footing Self Wt., F1 = 33.08 kN
Soil Weight, S1 = 0 kN
Total Weight, W1 = F1 + S1
= 33.08 kN
Note:
P1 (for Max Pressure) = P + W1
P2 (for Min Pressure) = P + W2
Max Soil Pressure = P1/A + Abs(Mx/Zxx) + Abs(My/Zyy)
Min Soil Pressure = P2/A - Abs(Mx/Zxx) - Abs(My/Zyy)
Note1: For Eccentric Footings, Mx will be replaced by Mx + Mex & My + Mey.
Note2 : For Footings of Irregular Shaped Columns, Mx will be replaced by Mx + P x Exo & Mx + P
x Eyo.
Definitions:
1. A = Plan area of footing base in 'sqmm'
2. Ast (min) = Area of longitudinal reinforcement as per code in
'sqmm'
3. Ast Prv = Area of tensile reinforcement provided in 'sqmm'
4. Ast Rqd = Area of longitudinal reinforcement from bearing
moment and minimum % steel provided by user and as
per code in 'sqmm'
5. Av = Area of shear reinforcement required in 'sqmm/m'
6. AvPrv = Area of shear reinforcement provided in 'sqmm/m'
7. A1 = Bearing area of footing at slope of 1:2 in 'sqmm'
8. A2 = C/s Area of column in 'sqmm'
9. B = Width of footing base in 'mm'
10. Beff = Effective width of footing in 'mm'
11/10/2022
Footing Design: Design Calculation Page 11 of 25
Code References:
NSCP C101 - 2015
Sr.No. Item Clause / Table
1. Ptmax : 407.3.3.1, 408.3.3.1, 409.3.3.1
2. Ptmin : 407.6.1.1 & 408.6.1.1/407.7.2.3
3. Vc : 422.6.5
4. Av : 422.5.10.5 & 422.6.7
5. Max Stirrup Spacing : 409.7.6.2 & 410.7.6.5
6. Vs : 422.5.1.2
7. fs,perm : 424.3.2.1
8. fc,perm : 422.2.2.4.1
9. Wcr : Eq 1-2 ( ACI 224R-01)
11/10/2022
Footing Design: Design Calculation Page 13 of 25
Clear Cover : 75 mm
Dfd : 0.3 m
Dw : 2m
11/10/2022
Footing Design: Design Calculation Page 14 of 25
11/10/2022
Footing Design: Design Calculation Page 15 of 25
Pcomb = 158.42 kN
Coefficient Of Friction = 0.4
Factor of safety = 1.2
Shear Vx = 3.19 kN
shear Vy = 18.73 kN
Resultant sliding force = 19 kN
Downward force = Pcomb + (F1 + S1) x 0.6
= 173.82 kN
Upward water pressure = 0 kN
Net downward force = 173.82 kN
Friction Coeff X Net
Force resisting sliding =
Downward Force
= 69.53 kN
Resisting Force / Sliding
Factor of safety available =
Force
= 3.66
> 1.2
Along Length:
Critical Analysis Load Combination = 16
Critical Load Combination = 0.6 (LOAD 3: DL) +0.6 (LOAD 6: -WX)
Factor of safety = 1.50
Pcomb = 178.99 kN
Moment My = 29.22 kNm
P = Pcomb + (F1 + S1) x 0.6
= 194.4 kN
Stabilizing Moment for P = 179.82 kNm
DeStabilizing Moment = 29.22 kNm
Overturning Factor of safety = 6.15
Safe in Overturning > 1.50
11/10/2022
Footing Design: Design Calculation Page 16 of 25
Critical Column No = C8
Critical Analysis Load Combination = 26
Critical Load Combination = [45] : 1.2 (LOAD 3: DL) +0.5 (LOAD 4: LL)
+(LOAD 8: -WZ)
Pu = 741.67 kN
Mux = -80.99 kNm
Muy = -17.56 kNm
P/A = 216.7 kN/sqm
Mx/Zx = -76.75 kN/sqm
My/Zy = -16.64 kN/sqm
Deff = 217 mm
Beff = 1850 mm
SPu = 293.45 kN/sqm
Mu = SPu X B X Loff X Loff / 2
= 123.68 kNm
Ast Rqd = 1437.25 sqmm
Ast (min) = 1110 sqmm
Ast Prv (Distributed Across Total = 8 - #16 @ 275
Width)
= 1608.48 sqmm
Deff = 201 mm
Leff = 1850 mm
SPu = 248.34 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 104.66 kNm
Ast Rqd = 1465.53 sqmm
Ast (min) = 1110 sqmm
Ast Prv (Distributed Across Total
= 8 - #16 @ 275
Length)
= 1608.48 sqmm
Design For Shear:
One Way Shear Along L:
Critical Section @ d from Column Face
11/10/2022
Footing Design: Design Calculation Page 17 of 25
= 217 mm
Critical Column No = C8
Critical Analysis Load Combination = 26
Critical Load Combination = [45] : 1.2 (LOAD 3: DL) +0.5 (LOAD 4: LL)
+(LOAD 8: -WZ)
Pu = 741.67 kN
Mux = -80.99 kNm
Muy = -17.56 kNm
P/A = 216.7 kN/sqm
Mx/Zx = -76.75 kN/sqm
My/Zy = -16.64 kN/sqm
Deff = 217 mm
Beff = 1850 mm
SPu = 293.45 kN/sqm
Vu = SPu X (Loff - d) X B
= 248.64 kN
φVc = 237.4 kN
Provide Shear
Vu > φVc
Reinforcement
Vs = 14.99 kN
Vs, Permissible = 1204.9 kN
Av = 166.9 sqmm/m
Avprv = %%c-- @ 0
Vs Capacity = 0 kN
Vu < φ x (Vc + Vs) Hence Ok
= 201 mm
Critical Column No = C8
Critical Analysis Load Combination = 23
Critical Load Combination = [42] : 1.2 (LOAD 3: DL)
+0.5 (LOAD 4: LL) +
(LOAD 5: +WX)
Pu = 678.53 kN
Mux = -12.68 kNm
Muy = -52.85 kNm
P/A = 198.26 kN/sqm
Mx/Zx = -12.02 kN/sqm
My/Zy = -50.08 kN/sqm
Deff = 201 mm
Leff = 1850 mm
SPu = 248.34 kN/sqm
Vu = SPu X (Boff - d) X L
11/10/2022
Footing Design: Design Calculation Page 18 of 25
= 217.77 kN
φVc = 221.61 kN
Vu < φVc
Critical Column No = C8
Critical Analysis Load Combination = 22
Critical Load Combination = [41] : 1.42 (LOAD 3: DL) +0.5 (LOAD 4: LL)
Pu = 777.46 kN
Mux = 0.84 kNm
Muy = -0.46 kNm
P/A = 227.16 kN/sqm
Mx/Zx = 0.8 kN/sqm
My/Zy = -0.43 kN/sqm
Deff = 209 mm
Leff = 709 mm
Beff = 709 mm
Punching Perimeter = 2836 mm
Punching Area = 592724 sqmm
SPu = Average Pressure
= 227.16 kN/sqm
Vu = { SPu [ (L x B)- (Leff x
Beff)]}
= 663.27 kN
φVn = 1010.79 kN
φVc = 667.12 kN
No Shear
Vu < φVc Reinforcement
Required
11/10/2022
Footing Design: Design Calculation Page 19 of 25
11/10/2022
Footing Design: Design Calculation Page 20 of 25
11/10/2022
Footing Design: Design Calculation Page 21 of 25
Along Length:
Critical Analysis Load Combination = 16
Critical Load Combination = 0.6 (LOAD 3: DL) +0.6 (LOAD 6: -WX)
Factor of safety = 1.50
Pcomb = 354.17 kN
Moment My = 48.26 kNm
P = Pcomb + (F1 + S1) x 0.6
= 374.01 kN
Stabilizing Moment for P = 392.71 kNm
DeStabilizing Moment = 48.26 kNm
Overturning Factor of safety = 8.14
Safe in Overturning > 1.50
Deff = 217 mm
Beff = 2100 mm
SPu = 293.58 kN/sqm
11/10/2022
Footing Design: Design Calculation Page 22 of 25
Deff = 201 mm
Leff = 2100 mm
SPu = 264.28 kN/sqm
Mu = SPu X L X Boff X Boff / 2
= 166.67 kNm
Ast Rqd = 2384.05 sqmm
Ast (min) = 1260 sqmm
Ast Prv (Distributed Across Total
= 12 - #16 @ 200
Length)
= 2412.72 sqmm
Design For Shear:
One Way Shear Along L:
Critical Section @ d from Column Face
= 217 mm
Critical Column No = C7
Critical Analysis Load Combination = 26
Critical Load Combination = [45] : 1.2 (LOAD 3: DL) +0.5 (LOAD 4: LL)
+(LOAD 8: -WZ)
Pu = 927.47 kN
Mux = -128.52 kNm
Muy = -16.51 kNm
P/A = 210.31 kN/sqm
Mx/Zx = -83.27 kN/sqm
My/Zy = -10.7 kN/sqm
Deff = 217 mm
Beff = 2100 mm
11/10/2022
Footing Design: Design Calculation Page 23 of 25
= 201 mm
Critical Column No = C7
Critical Analysis Load Combination = 23
Critical Load Combination = [42] : 1.2 (LOAD 3: DL)
+0.5 (LOAD 4: LL) +
(LOAD 5: +WX)
Pu = 951.65 kN
Mux = -21.25 kNm
Muy = -74.85 kNm
P/A = 215.79 kN/sqm
Mx/Zx = -13.76 kN/sqm
My/Zy = -48.49 kN/sqm
Deff = 201 mm
Leff = 2100 mm
SPu = 264.28 kN/sqm
Vu = SPu X (Boff - d) X L
= 318.57 kN
φVc = 260.74 kN
Provide Shear
Vu > φVc
Reinforcement
Vs = 77.11 kN
Vs, Permissible = 1266.88 kN
Av = 926.6 sqmm/m
Avprv = 4L-#10 @ 100
Vs Capacity = 261.42 kN
Vu < φ x (Vc + Vs) Hence Ok
11/10/2022
Footing Design: Design Calculation Page 24 of 25
Critical Column No = C7
Critical Analysis Load Combination = 21
Critical Load Combination = [40] : 1.2 (LOAD 3: DL) +1.6 (LOAD 4: LL)
Pu = 1081.91 kN
Mux = -2.18 kNm
Muy = -4.52 kNm
P/A = 245.33 kN/sqm
Mx/Zx = -1.41 kN/sqm
My/Zy = -2.93 kN/sqm
Deff = 209 mm
Leff = 759 mm
Beff = 759 mm
Punching Perimeter = 3036 mm
Punching Area = 634524 sqmm
SPu = Average Pressure
= 245.33 kN/sqm
Vu = { SPu [ (L x B)- (Leff x
Beff)]}
= 940.58 kN
φVn = 1082.07 kN
φVc = 714.16 kN
Provide Shear
Vu > φVc
Reinforcement
Vs = 763.57 kN
Asv Req = [1000 X (Vs X 1000)] / (fy X Deff)
= 2206.19 sqmm/m
Shear Reinforcement Provided along L = 4L-#12 @ 125
= 3619 sqmm/m
Shear Reinforcement Provided along B = 4L-#10 @ 100
= 3142 sqmm/m
Total Shear Reinforcement Provided,
= 13522 sqmm/m
Asv Prv
Vs Capacity = 1170 kN
Vu < φ x (Vc + Vs) Hence Ok
11/10/2022
Footing Design: Design Calculation Page 25 of 25
11/10/2022