Download as pdf or txt
Download as pdf or txt
You are on page 1of 87

NDPd

Solution for E2E deployment process:


 NDPd is a Process + Workflow driven tool with Milestone forecasting/tracking
 Has automatic notification of tasks based on completion of dependencies that
provide real time status
 Use modular concept with standard processes
 Allows remotization for Field Operations with NDP NOW mobility application
 Dashboard and reporting
It addresses many areas such as:
 process, project, workflow, documentation, mobility, robotics, dashboard, reporting
and inventory.
<Document ID: change ID in footer or remove> <Change information classification in footer>
NDPd User Registration
Steps for NDPd • Come to link https://online.networks.nokia.com/
user creation
Steps for NDPd • Click New user
user creation
Steps for NDPd user • Fill the form with correct and complete information
creation • Click Send OTP
Steps for NDPd • Check email to get One Time Password
• Input OTP into Portal Nokia, click Verify and
user creation Continue
• Choose Supplier Access in Access Selection and Nokia Deploy
in Service Selection
Steps for NDPd user • Click No for Training Access
creation • Fill the form with correct and complete information like
sample below
Steps for NDPd • User will get email from support portal Nokia and waiting
user creation for 5 business days for registration in Support Portal
• Login with email registered and one time password from
Steps for NDPd Support portal Nokia

user creation • Change password according you want


• Click continue
Steps for NDPd • login to https://nokia-central.siteforge.com/ with your email
and password
user creation
• After your login into Nokia Central try to login to
https://nokiaapac.siteforge.com/ with your email address
Steps for NDPd and permanent password that you have been created before
user creation
Mobile Application – NDPd Now
Field Service Technician can usually report their activity through NDPd Deploy Mobile Application “NDPd now”
Mobile App NDP Deploy NOW:
• Open web browser and Goto: https://nokiaapac.siteforge.com/mobile/download.html
• Then choose either Android or IOS version. You may need to change some parameters before being able to download the
APP
• You can login using NOLS credentials, and the list of tasks assigned to you will became visible
TSS Workflow and Task Owner
Technical Site Survey Work Flow

S
S
S

S
S
S
S

S
S

N
S

N N

Change to latest work flow


Technical Site Survey
NOKIA TASK

Task Role
Request TSS Roll Out Manager

Assign TSS Subcon Roll Out Manager

Acknowledge HS By Nokia Roll Out Manager

TSSR Review by Nokia Roll Out Manager

TSSR Review by RNP Network Planning


Technical Site Survey
SUBCONTRACTOR TASK (Coordinator/Engineer)

Task Role
Assign SHM (Subcon HSE Manager) Subcon Manager (SCM)

Assign Team (FST) Subcon Manager (SCM)

Accept or Reject Task by FST Field Service Technician (FST)

Arrange Site Access and align Field Service Technician (FST)

Perform HS Field Service Technician (FST)

Review HS by SHM Subcon HSE Manager (SHM)

Fill out TSS Checklist Part 1 Field Service Technician (FST)

Fill out TSS Checklist Part 2 Field Service Technician (FST)

TSSR review by SCM Subcon Manager (SCM)


NDPd Checklist Template
Site Information Detail
1. General Existing Site Sharing information
2. Site on Google Earth
1.1 General Existing Site Sharing information

Auto populate in
Auto populate in Auto populate in Free text Auto populate in report, no need to fill
report, no need to fill report, no need to fill report, no need to fill
Free text

Auto populate in
report, no need to fill

Free text

Free text

Free text

Free text

Free text
Drop down list
Free text

Free text

Auto populate in
report, no need to fill
Auto populate in
report, no need to fill

Free text

Free text

Free text
Drop down list

Free text, available if


choose “Others”
Drop down list

Free text, available if


choose “Other”

Free text, no need to


put UoM, just put the
number
Radio Button

Free text, available if


choose “Not good”
Drop down list

Free text, available if choose “Building” or “Others”


If choose “Building” put “Building Height” in remarks
Free text, no need to
put UoM, just put the
number

Radio Button
Radio Button

Radio Button

Free text, no need to put UoM, just put the number


Radio Button

Free text
Drop down list
Drop down list

Free text, available if


choose “Others”

Drop down list

Free text, available if


choose “Others”

Free text, no need to put UoM, just put the number

Free text
Upload picture
Radio Network Planning

1. Existing Radio Equipment


Drop down list, choose
the sector

Free text

Free text

Free text
Free text

Free text

Free text

Free text

Free text
Free text

Free text

Free text

Free text

Free text

Free text

Radio Button, choose “Yes” if Sector more than 1


Existing Antenna

1. Information All Existing Antenna Sectoral


2. Existing Antenna Microwave
Free text

Free text

Free text

Free text

Free text

Radio Button, choose “Yes” if operator more than 1


Free text

Free text

Free text

Free text

Free text

Radio Button, choose “Yes” if operator more than 1


Civil Mechanical and Electrical

1. Tower Space for Nokia Equipment


2. Ground Space for Nokia Equipment
Free text, sample
format 1x1x1

Free text, sample


format 1x1

Free text, no need to


put UoM, just put the
number

Free text, no need to


put UoM, just put the
number
Free text, no need to
put UoM, just put the
number

Free text, no need to


put UoM, just put the
number

Free text, no need to


put UoM, just put the
number

Free text, no need to


put UoM, just put the
number
Free text, no need to
put UoM, just put the
number

Free text
Free text, sample
format 1mx1m

Radio Button

Free text, sample


format 1mx1m

Radio Button

Radio Button

Radio Button

Free text
Radio Button

Free text

Free text

Free text
Radio Button

Free text

Free text

Free text
Existing Equipment

1. Existing Equipment RAN


2. Existing Equipment Transmission
Drop down list

Drop down list

Free text

Free text

Drop down list

Free text
Free text

Free text

Free text

Radio Button, choose “Yes” if Brand more than 1


Drop down list

Free text

Free text

Free text

Free text

Free text

Free text
Free text

Free text

Radio Button, choose “Yes” if Brand more than 1


Radio Button

Radio Button
Existing Rectifier and Battery

1. Existing Rectifier
2. Existing Battery
Drop down list

Drop down list

Free text

Free text

Free text
Free text

Free text

Free text

Free text

Free text

Radio Button, choose “Yes” if Rack more than 1


Drop down list

Drop down list

Drop down list

Free text

Free text

Free text

Free text

Radio Button, choose “Yes” if Rack more than 1


Existing Power

1. Voltage PLN
2. PLN Current Input (Ampere)
Free text

Free text

Free text

Free text

Free text

Free text

Free text

Free text
Free text

Free text

Free text
SUMMARY

1. Tower
2. Rooftop Site
3. Jumper Cable Requirement ARDA
4. Jumper Cable Requirement AHEGC
5. Ground Space
6. Power
Drop down list

Radio Button

Radio Button

Radio Button

Radio Button

Radio Button

Drop down list


Free text

Drop down list

Radio Button

Drop down list

Free text, quantity of


Connector
Radio Button

Free text

Free text

Free text

Free text
Drop down list

Free text

Free text

Radio Button, choose “Yes” if Jumper more than 1


Drop down list

Free text

Free text

Radio Button, choose “Yes” if Jumper more than 1


Drop down list

Drop down list

Drop down list

Drop down list

Radio Button

Radio Button

Free text
Drop down list

Radio Button
Radio Button

Radio Button

Drop down list

Free text

Free text

Free text

Radio Button

Radio Button
Free text

Free text

Free text

Free text

Free text

Free text
Panoramic Photo
1. 0°
2. 30°
3. 60°
4. 90°
5. 120°
6. 150°
7. 180°
8. 210°
9. 240°
10. 270°
11. 300°
12. 330°
Antenna
1. Antenna sec 1 placement include measurement information (meter)
2. Antenna Sector 1 name plate
3. Antenna sec 1 Bracket View
4. Antenna Sector 1 Tilting
5. Antenna sec 2 placement include measurement information (meter)
6. Antenna Sector 2 name plate
7. Antenna sec 2 Bracket View
8. Antenna Sector 2 Tilting
9. Antenna sec 3 placement include measurement information (meter)
10. Antenna Sector 3 name plate
11. Antenna sec 3 Bracket View
12. Antenna Sector 3 Tilting
Cable Tray
1. Cable inlet
2. Horizontal Tray
Site Location
1. Site Condition (Front View)
2. Location BTS (Proposed)
3. Access to Site1
4. Access to Site2
5. Coordinate view GPS
Tower
1. Tower Name Plate
2. Tower and All Existing Antenna (View A)
3. Tower and All Existing Antenna (View B)
4. Tower and All Existing Antenna (View C)
5. Tower and All Existing Antenna (View D)
Drawings and sketches
1. Site Layout
2. Tower Layout
Site Photo
1. View to Existing Baseframe
2. View to Propose Equipment placement on Baseframe
3. View to HorizontalTray
4. View to Vertical tray
5. View to HorizontalTray – Pole 1
6. View to Vertical tray -Pole 1
7. View to HorizontalTray – Pole 2
8. View to Vertical tray – Pole 2
9. View to HorizontalTray – Pole 3
10. View to Vertical tray – Pole 3
11. View to Upper Bus Bar
12. View to Baseframe Bus Bar
13. View to tower anchor leg A
14. View to tower anchor leg B
15. View to tower anchor leg C
16. View to tower anchor leg D
17. View to Control Box
Existing Equipment RAN
1. Existing RF Module 1
2. Existing RF Module 2
3. Existing RF Module 3
4. Existing RF Module 4
5. Existing RF Module 5
6. Existing RF Module 6
Existing Equipment Transmission
1. Existing System Module 1
2. Existing System Module 2
3. Existing IDU Transmission
4. Existing Port Transmission Connection
5. Existing IDU Transmission 2
6. Existing Port Transmission Connection 2
Existing Rectifier
1. Existing Rectifier Cabinet Open
2. Existing Subrack Rectifier
3. Existing Rectifier Module
4. Existing Current Load
5. Existing MCB DC Distribution
6. Existing NMS Connection
7. Existing Rectifier DDF External Alarm
8. Existing Rectifier Inlet Gland Bottom (Inside)
9. Existing Rectifier Inlet Gland Bottom (Outside)
Existing Battery
1. Existing Battery 1
2. Existing Battery 2
3. Existing Battery 3
Existing Power
1. MCB PLN
2. Measurement (phase R) Voltage
3. Measurement (phase S) Voltage
4. Measurement (phase T) Voltage
5. Measurement (N-G) Voltage
6. Measurement (phase R) Ampere
7. Measurement (phase S) Ampere
8. Measurement (phase T) Ampere

You might also like