Hydrological observation Circle, CWC, Gandhinagar

Important Activities for the Period 21/10/2022 to 20/11/2022


1. Consultancy Nil
2 Project Appraisal/Examination/Preparation Not applicable
3 River Management
Hydrological & Hydro meteorological Data Collection in Progress (including telemetry sites) as
given below.
1. Existing regular sites till XI Plan. 7 Gauge sites upgraded as GD sites under Tapi Division, Surat
during XII plan is updated in the table:
DIV. Regular site Seasonal site Total
G GD GDS GDQ GDQS RF Link Stn.
Mahi 16 11 0 4 7 6 1 45
Tapi 14 10 1 2 8 10 -- 45
Total 90
2. New sites opened during XII plan:
DIV. Type of site Total
G GD
Mahi 2 7 9
Tapi 8 12 20
Total 29

4 Project monitoring
The Storage Position of Important Reservoirs as on 20/11/2022 are as follows
Sl. Name of Reservoir Total live F.R.L. Present Water Present Live % Of Total Live
No. storage Capacity in m Level in m Storage Storage
(MCM) (08:00 hrs) Capacity
(MCM)
1 Ukai Dam 6719.90 105.156 104.717 6473.5 96.33
2 Hathnur dam 255.00 214.000 214.08 255 100
3 Madhuban dam 478.090 79.860 79.55 463.39 96.92
4 Girna dam 523.55 398.000 398.068 523.735 100
5 Sardar Sarovar
5834.40 138.68 135.81 4862.10 83.35
Dam
6 Karjan Dam 514.647 115.25 114.44 490.98 95.40
7 Dharoi Dam 745.63 189.59 188.80 663.77 89.02
8 Kadana Dam 1191.70 127.71 127.26 1144.98 96.08
9 Panam Dam 552.96 127.41 122.95 298.425 53.97
10 Dantiwada Dam 387.41 184.10 182.21 324.292 83.71
11 Shetrunji Dam 341.45 55.54 55.15 315.815 92.49
12 Bhadar Dam 187.91 107.90 107.59 174.611 92.92
13 Jakham Dam 132.28 359.60 358.8 125.12 94.59
14 Mahi Dam 1833.50 281.50 280.35 1674.10 91.31
5 Training /Workshops. -
6 Other Technical Activities:
i) Monitoring water Quality. WQ Monitoring:
A. 33 nos water samples belonging to Mahi division analyzed at
Divisional Lab, Gandhinagar.
B. 24 nos water samples belonging to Tapi division analyzed at
Divisional Lab, Surat.
Basin LF/IF Stations Overall, No % Of Forecast
of Forecast within
Issued prescribed
During limit of
Monsoon Accuracy
year 2022-
23
UKAI DAM 134 99.25
TAPI BASIN HATHNUR DAM 117 98.29
SURAT 0 Nil
ii) Flood forecasting activities.
MADHUBAN DAM 26 100
iii) Advisory Forecasting:
DAMANGANGA VAPI 0 Nil
Panam Dam-NIL DAMAN 0 Nil
Som Kamala Amba Dam-NIL GARUDESHWAR 0 Nil
ABU ROAD - 02
NARMADA BHARUCH 23 100
SARDAR SAROVAR 145 98.62
Total=02
DAM
KADANA DAM 05 100
MAHI
WANAKBORIWEIR Nil Nil
Mahi Bajaj Sagar Dam 04 100
DHAROI DAM 30 90
SABARMATI
SUBHASH BRIDGE Nil Nil
DANTIWADA DAM 12 83.33
BANAS
ABU ROAD Nil Nil
Total
(iii) Status of WIMS/ e-SWIS data entry Reported by Divisions are follows:

1. MAHI DIVISION, CWC, GANDHINAGAR. Status of WIMS data entry reported by Division as on
20/11/2022 is attached as Annexure – II.
2. TAPI DIVISION, CWC, SURAT. Status of WIMS data entry reported by Division as on 20/11/2022
is attached as Annexure – I.

iv)ABSTRACT OF PROGRESS ON TELEMETRY WORK (XI PLAN)


Status Types of telemetry Stations. Total. Modelling center.
A B C D
MAHI DIVISION – Total no of Telemetry stations =38
Total no of Telemetry 6 17 13 2 38 1
station (Mahi Division)
Data status: - Mahi Division Modeling center Gandhinagar: Total No of Sites – 38
Water Level + Rain Fall + FCS Sites: -32 Only Rain Fall Sites: -06
1. Number of sites functional-04 1. Number of sites functional–06
2. Number of sites not functional –24 2. Number of Sites not functional- 00
TAPI DIVISION – Total no of Telemetry stations =38
Total no of Telemetry 10 21 6 1 38 2
stations
Water Level + Rail Fall + FCS Sites: -28 Only Rain Fall Sites: -10
1. Number of sites functional -12 2. Number of sites functional –00
2. Number sites nonfunctional –16 3. Number of Sites nonfunctional -10
Telemetry sites A B C D TOTAL
Modeling Center
Total. 16 38 19 3 76 3
v)ABSTRACT OF PROGRESS ON TELEMETRY WORK (XII PLAN)
Status Types of telemetry Total. Modeling center.
Stations.
A B C D
MAHI DIVISION – Total no of Telemetry stations =21
(A)Total no of Telemetry 05 05 03 00 13
station (Mahi Division) 1
(B) Telemetry station 0 08 0 0 08
for reservoirs water
level
Data status: - Mahi Division Modeling center Gandhinagar: Total No of Sites – 21
Water Level + Rail Fall Sites: -16 Only Rain Fall Sites: -05
1. Number of sites functional-13 1. Number of sites functional– 05
2. Number of sites not functional –03 2. Number of Sites not functional- 00
TAPI DIVISION – Total no of Telemetry stations =13
(A) Total no of 01 01 09 0 11
Telemetry stations
2
(B) Telemetry station 0 02 0 0 02
reservoirs water
level
Water Level + Rail Fall + FCS Sites: -12 Only Rain Fall Sites: -01
1. Number of sites functional -09 1. Number of sites functional – 00
2. Number of sites nonfunctional –03 2. Number of Sites nonfunctional - 01

Telemetry sites A B C D TOTAL


Modeling Center
Total. 06 16 12 0 34 3
7 International cooperation /external assistance Not applicable

8 Inter State Issues

9 1. Visit Of VIPs / Dignitaries / Foreign Delegates /


CWC officers --

Visit/ site inspection by CWC Officers:

i.Visit/ site inspection by SE, HOC, CWC, nil


Gandhinagar
ii.Visit/ site inspection by EE, MD, CWC 1. EE MD inspected site Lowara on 04/11/2022.
Gandhinagar
iii.Visit/ site inspection by EE, TD, CWC, Surat Nil

10 Review Meeting / Meetings / Representation. 1) EE (Mahi Division) & EE Tapi Division


attended Bid Evaluation Committee meeting
headed by SE, HOC for financial evaluation of
work for establishment of target pole &
boards at the sites Gadat, Mahuva,Gala and
Gavachi under LTSD,CWC on 21/10/2022
2) Expenditure review meeting by SE, HOC
on dated 22/10/2022
3) Review meeting by EE Tapi Division with
all subdivisions under Tapi Division on
dated 28/10/2022
4) EE (Mahi Division) & EE Tapi Division
attended Bid Evaluation Committee meeting
headed by SE, HOC for technical evaluation
of work for Procurement of Plastic ware etc.
for Water Quality Laboratory, Tapi Division,
CWC, Surat on 09/11/2022
5) EE (Mahi Division) & EE Tapi Division
attended Bid Evaluation Committee meeting
headed by SE, HOC for technical evaluation
of work for Procurement of Plastic ware etc.
for Water Quality Laboratory, Tapi Division,
CWC, Surat on 10/11/2022
6) EE (Mahi Division) & EE Tapi Division
attended Bid Evaluation Committee meeting
headed by SE, HOC for technical evaluation
of work for Fabrication and Installation of
Reinforced cement Concrete gauge posts at
Sites under Daman Ganga Sub Division,
Silvassa, CWC on 16/11/22.
7) EE (Mahi Division) & EE Tapi Division
attended Bid Evaluation Committee meeting
headed by SE, HOC for technical evaluation
of work for Fabrication and Installation of
Reinforced cement Concrete gauge posts at
Sites under Upper Tapi Sub Division,
Bhusawal, CWC on 16/11/22.
8) EE (Mahi Division) & EE Tapi Division
attended Bid Evaluation Committee meeting
headed by SE, HOC for technical evaluation
of work for Fabrication and Installation of
Reinforced cement Concrete gauge posts at
Sites under Lower Narmada Sub Division,
Bharuch, CWC on 16/11/22.
9) EE (Mahi Division) attended Bid Evaluation
Committee meeting headed by SE, HOC for
technical evaluation of work for Fabrication
and Installation of Reinforced cement
Concrete gauge posts at Sites under Mahi
Division, CWC on 17/11/2022.

Plan Schemes.
-
11
12 Other activities.

13 Environment management Not applicable