Download as pdf
Download as pdf
You are on page 1of 3
Minutes of Meeting dated 23.10.19 ' Sub: - Integration of FRTUs under SCRIPS Scheme with existing SCADA System of CESU Members Present: CESU: L&T: ye 1, Mr. Bibidha Samal, AGM(SCADA) AB 1.Mr. Anand MR 2. Mr. Pabitra Mohan Sahu, Manager (SCADA) 2. Mr. Arya Dutta Roy ae Z 3. Mr, Beeru Singh & all 4. Mr. Sidhartha Sankar Pate PRDC: SIEMENS: (gore 1, Mr, Surendra Kumar Rout oO 01. Mr. Deepak Maki a As decided in the review meeting chaired by CEO, CESU held on dated 18.09.2019, representatives from M/S SIEMENS and L&T (design and site team) visited Bhubaneswar site along with PRDC and CESU for finalizing the way forward for commissioning of FRTUs. In their visit the following points were discussed and finalized. 1, Siemens has confirmed that supplied FRTUs are compatible with SCADA on IEC104 protocol. 2. Siemens Confirmed that supplied FRTUs can be configured over WEB via Internet Explorer from Local or Remote. 3. Local demonstration for integration between RMU and FRTU shall be done through laptop via protocol tester during commissioning by Siemens in presence of CESU/PRDC representative. 4. Siemens shall provide the details of IEC104 address in line with submitted 1/0 List. (Refer Annexure-1). 5. CESU requested Siemens/L&qT to support for integration of FRTUs with control center via DFE RTUs. However Siemens/L&T confirmed that for one sample ring integration, necessary support required at FRTU end shall be provided and Siemens/L&T keep the other FRTUs ready with configuration for IEC104. Later CESU to integrate the remaining FRTUs with their control center. Minutes of Meeting dated 23.10.19 Sub: - Integration of FRTUs under SCRIPS Scheme with existing SCADA System of CESU 6. Allnecessary configuration at DFE RTUs and Control center to be done by CESU. 7. Siemens confirmed that the supplied FRTUs can report to two masters simultaneously, and the FRTUs shall also be configured to report Two Masters ie. DFE RTU of both end. 8 — Siemens/L&T requested CESU to provide IP addresses for the FRTUs and CESU has agreed to provide the same. & For Integration of SCRIPS FRTUs to CESU existing SCADA system, the required FO switch and its accessories was already intimated to PRDC and the same tobe complied wherein the final quantity of the said items is to be as per the field requirement. 10. The decision which is taken shall be submitted to OPTCL for subsequent course action. Ce [LBS OFF Status (LBS-1) Feeder-1 [LBS ON Status (LBS-1) Feeder-1 IES OFF Status (LBS-1) Feeder-1 IES ON Status (LBS-1) Feeder-1 IFPI Status (LBS - 1) Feeder-1_(R,Y,B) LBS-1 - Local/ Remote |LBS-1_ compartment Door Status = |LBS-1 ON Command - Feeder - 1 [LBS-1 OFF Command - Feeder - 1 Annexure 1 LIST OF I/O SIGNALS FOR FRTU'S ICB-1 OFF Status Feeder-3 [CB-1 ON Status Feeder-3 IES OFF Status ( CB-1 ) Feeder-3 Disconnector OFF Status ( CB-1 ) Feeder-3 Protection Relay operated (CB-1 ) Feeder-3 |CB-1 Local/ Remote [CB-1 compartment Door Status |CB OFF/Open Command - Feeder - 3 ICB ON/Close Command - Feeder - 3 IFPI Remote Reset Command - Feeder-1 |Tetemater (Modbus signals from TM to FRTU) oat spe \pec (A vie mea ee IRMU SF6 Gas Low Indication

You might also like