PROPOSED 2 BEDROOM STOREY APARTMENT

GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
with the relevant or specified international codes
2 where applicable in the Architectural
A106 specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such

A B C D E F documents to be considered a minimum standard


for the works.
18650 3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
1280 5156 5144 4500 1195 and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
2500 150 900 1550 900 3450 900 1550 900 1950 1200 1500 1200 Act of 1941.
150 3078 150 3028 150 3099 150 3066 150 3066 150 4. The contractor shall set up, document and
maintain a quality assurance and quality control
1 system, in accordance with SANS 9001/ISO 9001,
able to be checked to the satisfaction of the

1116
Architect, that all materials and workmanship,
1 W1 W1 W3 W3 W1 W1 W4
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
accordingly.

1400
5. This drawing must be read in conjunction with all

2000
the relevant drawings, schedules and
specifications from Architect and all other
1 1 consultants related to the project. The Contractor
Bedroom 1 D2 D2 Kitchen 1
Bedroom 2 shall coordinate all portions of the work as

W4
4000

3700

1200
4000

A106 15 m² 16 m² A106 described in the contract documents. Notify the


2 2
15 m²
Architect for resolution of all discrepancies prior to
3350 1650 1650 3350
construction.
6. All portions of the works related to any service
1700

2500 5000 5000 4350 1200


8554

1550 or consultant’s information is to be done in

1400
accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in
3 D1 D1 D1
3 millimeters unless otherwise stated.
2500 W2 14950 W2 1200 8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
1788

9. All work to be executed by competent persons


1788

1788

1788
qualified for the specific trade.
150 3068 150 3068 150 3068 150 3068 150 3068 150 1032

4 4

1000
1000

1000
UP
1037 5400 1188

1650
350 300
650

650

4981
2500 150 1800 533 900 3650 900 567 1800 3525 1125 1200

A B C D E F
2
A106

Ground Floor Plan


Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A103
Drawn by Author
Owner Checked by Checker Scale 1 : 75
GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
with the relevant or specified international codes
where applicable in the Architectural
2
specifications. Where relevant British Standards,
A106 BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such
documents to be considered a minimum standard
A B C 17430 D E F for the works.
3. The contractor shall in all aspects of the works
1280 5156 5144 4500 1195 comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
1280 150 900 1550 900 450 1200 150 1200 450 900 1550 900 1950 1200 1500 1200 Act of 1941.
4. The contractor shall set up, document and
150 3078 150 3028 150 3099 150 3066 150 3066 150 1043 150
maintain a quality assurance and quality control
system, in accordance with SANS 9001/ISO 9001,
1

150
able to be checked to the satisfaction of the
Architect, that all materials and workmanship,

1116
whatever their sources, meet the requirements of
1 the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
150

accordingly.

1400
5. This drawing must be read in conjunction with all
the relevant drawings, schedules and

2000
specifications from Architect and all other
consultants related to the project. The Contractor
1 Bedroom 3 D2 D2 1 shall coordinate all portions of the work as
Bedroom 4 Kitchen 2
described in the contract documents. Notify the

1200
4000

3700

3700
A106 15 m² 15 m² 16 m² A106
2 2 Architect for resolution of all discrepancies prior to

6604
construction.
3350 1650 1650 3350
7904

6. All portions of the works related to any service


1700

5000 5000 4350 or consultant’s information is to be done in


5158

1550

accordance with the National Building Regulations.

1400
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in

3 D1 D1 D1
3 millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
1788

9. All work to be executed by competent persons


qualified for the specific trade.
1788

1788

2788
150 3068 150 3068 150 3068 150 3068 150 3068 150 1038 150

4 4
150

150
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

925
1025
1000

1037 5400 DN 1188

100
9805 7625
1280 150 1800 600 900 3550 900 600 1800 3600 1050 1200

A B C D E F
2
A106

First Floor Plan


Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A104
Drawn by Author
Owner Checked by Checker Scale 1 : 75
GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
2 with the relevant or specified international codes
where applicable in the Architectural
A106 specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such
A B C D E F documents to be considered a minimum standard
for the works.
17430 3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
1280 5156 5144 4500 1195 and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
Act of 1941.
4. The contractor shall set up, document and

1 maintain a quality assurance and quality control


system, in accordance with SANS 9001/ISO 9001,
able to be checked to the satisfaction of the
Architect, that all materials and workmanship,
1 whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
100mm diameter PVC Pipe accordingly.
5. This drawing must be read in conjunction with all
the relevant drawings, schedules and
150mm R.C Conc Slab specifications from Architect and all other
1 1 consultants related to the project. The Contractor
A106 A106 shall coordinate all portions of the work as
2 2 described in the contract documents. Notify the

6598
Architect for resolution of all discrepancies prior to
7904

construction.
1700

6. All portions of the works related to any service


5226

17130 or consultant’s information is to be done in


accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
3 3 dimensions to be used. All dimensions are in
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
1788

site by the contractor before putting work in hand.


9. All work to be executed by competent persons
9805 7325 qualified for the specific trade.

4 4

1000
A B C D E F
2
A106

Roof Plan
Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A105
Drawn by Author
Owner Checked by Checker Scale 1 : 75
A B C D E F GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)

600
roof 2. All materials and workmanship are to comply
with the relevant or specified international codes
6150 where applicable in the Architectural
specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
Bedroom 3 Bedroom 4 Kitchen 2 applicable to the design exists, the

2850
15 m² 15 m² 16 m² recommendations and requirements of such

2700
documents to be considered a minimum standard
for the works.
3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
6300
first floor Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
3300 Act of 1941.
4. The contractor shall set up, document and
maintain a quality assurance and quality control
Bedroom 1 Bedroom 2 Kitchen 1
2850

system, in accordance with SANS 9001/ISO 9001,


15 m² 15 m² 16 m²
able to be checked to the satisfaction of the

2700
Architect, that all materials and workmanship,
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
Ground floor family of standards then monitor these works
accordingly.
1000 450

ground level
450

450 5. This drawing must be read in conjunction with all


the relevant drawings, schedules and
0
1300

specifications from Architect and all other


consultants related to the project. The Contractor
foundation shall coordinate all portions of the work as
described in the contract documents. Notify the
150

-1000 450 Architect for resolution of all discrepancies prior to


construction.
6. All portions of the works related to any service
Section 1 2 3 4
or consultant’s information is to be done in

1
accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
1 : 75 dimensions to be used. All dimensions are in
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on

600
roof site by the contractor before putting work in hand.
9. All work to be executed by competent persons
6150 qualified for the specific trade.

Bedroom 4
2850

15 m²
2700

first floor
6750

3300

Bedroom 2
2850

15 m²
2700

Ground floor
1000 450

150

ground level
450
300

0
1000

foundation
Section 2
150

-1000
2 1 : 75
450
Sections
Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A106
Drawn by Author
Owner Checked by Checker Scale 1 : 75
4 3 2 GENERAL NOTES
East 1. All work is to be done in accordance with the

1 1 : 75 roof
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
6150 with the relevant or specified international codes
where applicable in the Architectural
specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such
documents to be considered a minimum standard
for the works.
3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
first floor Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
3300 Act or the Factories Machinery and Building Works
Act of 1941.
4. The contractor shall set up, document and
maintain a quality assurance and quality control
system, in accordance with SANS 9001/ISO 9001,
able to be checked to the satisfaction of the
Architect, that all materials and workmanship,
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
Ground floor his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
ground level
450 accordingly.
5. This drawing must be read in conjunction with all
0 the relevant drawings, schedules and

North
specifications from Architect and all other
consultants related to the project. The Contractor

2
shall coordinate all portions of the work as
described in the contract documents. Notify the
1 : 75 Architect for resolution of all discrepancies prior to
F E D C B A construction.
6. All portions of the works related to any service
or consultant’s information is to be done in
accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
9. All work to be executed by competent persons
roof qualified for the specific trade.

6150

first floor
3300

Ground floor
ground level
450
0

Elevations
Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A107
Drawn by Author
Owner Checked by Checker Scale 1 : 75
GENERAL NOTES

South A B C D E F 1. All work is to be done in accordance with the


Land Use and Spatial Planning Act 2016 as well

1 1 : 75
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
with the relevant or specified international codes
where applicable in the Architectural
specifications. Where relevant British Standards,
roof BS codes of practice, or Agrément Certificates
applicable to the design exists, the
6150 recommendations and requirements of such
documents to be considered a minimum standard
for the works.
3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
Act of 1941.
4. The contractor shall set up, document and
first floor maintain a quality assurance and quality control
system, in accordance with SANS 9001/ISO 9001,
3300 able to be checked to the satisfaction of the
Architect, that all materials and workmanship,
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
accordingly.
5. This drawing must be read in conjunction with all
the relevant drawings, schedules and
Ground floor specifications from Architect and all other
consultants related to the project. The Contractor
ground level
450 shall coordinate all portions of the work as
described in the contract documents. Notify the
0 Architect for resolution of all discrepancies prior to
construction.
6. All portions of the works related to any service
or consultant’s information is to be done in
accordance with the National Building Regulations.

West 7. This drawing is not to be scaled. Figured


dimensions to be used. All dimensions are in

2 1 : 75 2 3 4
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
9. All work to be executed by competent persons
qualified for the specific trade.

roof
6150

first floor
3300

Ground floor
ground level
450
0
Elevations
Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A108
Drawn by Author
Owner Checked by Checker Scale 1 : 75
GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
with the relevant or specified international codes
where applicable in the Architectural
specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such
documents to be considered a minimum standard
for the works.
3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
Act of 1941.
4. The contractor shall set up, document and
maintain a quality assurance and quality control
system, in accordance with SANS 9001/ISO 9001,
able to be checked to the satisfaction of the
Architect, that all materials and workmanship,
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
accordingly.
5. This drawing must be read in conjunction with all
the relevant drawings, schedules and
Bedroom 1 Bedroom 2 Kitchen 1 specifications from Architect and all other
15 m²
15 m²
16 m² consultants related to the project. The Contractor
shall coordinate all portions of the work as
described in the contract documents. Notify the
Architect for resolution of all discrepancies prior to
construction.
6. All portions of the works related to any service
or consultant’s information is to be done in
accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
9. All work to be executed by competent persons
qualified for the specific trade.

UP

Ground Floor Furniture Layout


Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A109
Drawn by Author
Owner Checked by Checker Scale 1 : 75
GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
with the relevant or specified international codes
where applicable in the Architectural
specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such
documents to be considered a minimum standard
for the works.
3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
Act of 1941.
4. The contractor shall set up, document and
maintain a quality assurance and quality control
system, in accordance with SANS 9001/ISO 9001,
able to be checked to the satisfaction of the
Architect, that all materials and workmanship,
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
accordingly.
Bedroom 3 D2 D2 Bedroom 4 Kitchen 2 5. This drawing must be read in conjunction with all
15 m² 15 m² 16 m² the relevant drawings, schedules and
specifications from Architect and all other
consultants related to the project. The Contractor
shall coordinate all portions of the work as
described in the contract documents. Notify the
Architect for resolution of all discrepancies prior to
construction.
6. All portions of the works related to any service
D1 D1 D1 or consultant’s information is to be done in
accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
9. All work to be executed by competent persons
qualified for the specific trade.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

DN

First Floor Furniture Layout


Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A110
Drawn by Author
Owner Checked by Checker Scale 1 : 75
GENERAL NOTES
LOCATION NO. LOCATION NO. LOCATION NO. 1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
GROUND FLOOR GROUND FLOOR GROUND FLOOR SOFFIT OF
FLOOR SLAB 2. All materials and workmanship are to comply
BEDROOM 1 2 BATHROOM 1 1

600
SOFFIT OF
BEDROOM 1 1 FLOOR SLAB with the relevant or specified international codes
BEDROOM 2 2 BATHROOM 2 1

600
BEDROOM 2 1 SOFFIT OF
where applicable in the Architectural
KITCHEN 1 1 FLOOR SLAB specifications. Where relevant British Standards,
FIRST FLOOR GROUND FLOOR BS codes of practice, or Agrément Certificates

600
900
1 applicable to the design exists, the
GROUND FLOOR BEDROOM 3 2 BATHROOM 3 recommendations and requirements of such
BEDROOM 3 1 BEDROOM 4 2 BATHROOM 4 1 documents to be considered a minimum standard

3000
BEDROOM 4 1 1200 for the works.

1800

3000
1 3. The contractor shall in all aspects of the works
KITCHEN 2
comply with the provisions of the Occupational

3000
Health and Safety Act, 1993 (Act No 85 of 1993)

1800
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works

2100
Act of 1941.
4. The contractor shall set up, document and
900 TOP OF maintain a quality assurance and quality control

600
FLOOR SLAB system, in accordance with SANS 9001/ISO 9001,
TOP OF
FLOOR SLAB able to be checked to the satisfaction of the
TOP OF Architect, that all materials and workmanship,
FLOOR SLAB whatever their sources, meet the requirements of
900 the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
QUANTITY 6 DOOR TYPE: D1 QUANTITY 8 WINDOW TYPE: W1 QUANTITY 4 WINDOW TYPE: W3 family of standards then monitor these works
accordingly.
5. This drawing must be read in conjunction with all
DESCRIPTION: DESCRIPTION: DESCRIPTION: CLEAR GLASS LOUVRES INFILL the relevant drawings, schedules and
FRAME/MATERIAL WALNUT FLUSH DOOR FRAME/MATERIAL
CLEAR GLASS INFILL WITH ALUMINIUM FRAME/MATERIAL WITH WOODEN WINDOW FRAMES specifications from Architect and all other
LEAF/S LEAF/S WINDOW FRAMES AND IRON MONGERY LEAF/S consultants related to the project. The Contractor
shall coordinate all portions of the work as
described in the contract documents. Notify the
Architect for resolution of all discrepancies prior to
construction.
6. All portions of the works related to any service
or consultant’s information is to be done in
LOCATION NO. LOCATION NO. LOCATION NO. accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in
GROUND FLOOR millimeters unless otherwise stated.
GROUND FLOOR GROUND FLOOR SOFFIT OF
BATHROOM 1 1 2
FLOOR SLAB 8. All dimensions and levels must be checked on
BEDROOM 1 1 KITCHEN 1

600
SOFFIT OF
BATHROOM 2 1 FLOOR SLAB site by the contractor before putting work in hand.
BEDROOM 2 1

600
SOFFIT OF 9. All work to be executed by competent persons
FLOOR SLAB FIRST FLOOR qualified for the specific trade.
FIRST FLOOR 2
FIRST FLOOR KITCHEN 2
900

BATHROOM 3 1
BEDROOM 3 1

1200
BATHROOM 4 1
BEDROOM 4 1

3000
1800

3000
3000

1200

1200
2100

1800

TOP OF

600
FLOOR SLAB
TOP OF
FLOOR SLAB
TOP OF
FLOOR SLAB
750

QUANTITY 4 DOOR TYPE: D3 QUANTITY 4 WINDOW TYPE: W3 QUANTITY 4 WINDOW TYPE: W4


DESCRIPTION: DESCRIPTION: DESCRIPTION: CLEAR GLASS LOUVRES INFILL
FRAME/MATERIAL WALNUT FLUSH DOOR FRAME/MATERIAL CLEAR GLASS INFILL WITH ALUMINIUM FRAME/MATERIAL WITH WOODEN WINDOW FRAMES
LEAF/S LEAF/S WINDOW FRAMES AND IRON MONGERY LEAF/S

Door & Window Schedule


Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A111
Drawn by Author
Owner Checked by Checker Scale 1 : 50
GENERAL NOTES
1. All work is to be done in accordance with the
Land Use and Spatial Planning Act 2016 as well
applicable sections of the National Building
Regulations (LI 1996)
2. All materials and workmanship are to comply
with the relevant or specified international codes
where applicable in the Architectural
specifications. Where relevant British Standards,
BS codes of practice, or Agrément Certificates
applicable to the design exists, the
recommendations and requirements of such
documents to be considered a minimum standard
for the works.
3. The contractor shall in all aspects of the works
comply with the provisions of the Occupational
Health and Safety Act, 1993 (Act No 85 of 1993)
and any regulations promulgated in terms of that
Act or the Factories Machinery and Building Works
Act of 1941.
4. The contractor shall set up, document and
maintain a quality assurance and quality control
system, in accordance with SANS 9001/ISO 9001,
able to be checked to the satisfaction of the
Architect, that all materials and workmanship,
whatever their sources, meet the requirements of
the Specification. Should the Contractor or any of
his sub-contractors be certified to the SANS 9000
family of standards then monitor these works
accordingly.
5. This drawing must be read in conjunction with all
the relevant drawings, schedules and
specifications from Architect and all other
consultants related to the project. The Contractor
shall coordinate all portions of the work as
described in the contract documents. Notify the
Architect for resolution of all discrepancies prior to
construction.
6. All portions of the works related to any service
or consultant’s information is to be done in
accordance with the National Building Regulations.
7. This drawing is not to be scaled. Figured
dimensions to be used. All dimensions are in
millimeters unless otherwise stated.
8. All dimensions and levels must be checked on
site by the contractor before putting work in hand.
9. All work to be executed by competent persons
qualified for the specific trade.

Detailing
Project number 0001
PROPOSED 2 BEDROOM STOREY APARTMENT Date Issue Date A112
Drawn by Author
Owner Checked by Checker Scale