Career Objective: Senior Project Engineer Dinesh Kumar Yadav
Career Objective: Senior Project Engineer Dinesh Kumar Yadav
Phone: +919935337264
DINESH KUMAR Yadav WhatsApp Number : +25769831975
B. Tech (Civil Engineering) Email: dineshkumary109@gmail.com
UPTU LUCKNOW Address: Allahabad, Utter Pradesh, India 212303
Career Objective
To be a part of a dynamic and Multinational Corporation organization offer an opportunity to utilize my skills, add value to
its talent pool while paving way for my professional success and to contribute myself qualitatively towards achieving the
organizational objectives by being an integral part of the organization.
Professional Summary
Project Management professional, with overall 7 + years of experience in project execution monitoring, planning, controls
& co-ordination, Under-ground Construction Works Metro Tunnel, Railway Tunnel, and Hydro Power Project. Client &
contractor billing and overall inter-discipline & client co-ordination & management, and other activities in various sectors
of Construction, Infrastructure and Project.
Angelique Kabu 16, Hydro power Senior Project 16/07/2018 Present 04+ years
International project, East Africa, Engineer
Limited Country -Burundi
M/s Pragati TSR Doubling of track B/w Tunnel 01/01/2017 10/07/2018 01 years 7
JV MANJ-PMNB section – Engineer months
Proposed construction
of BG single
Underground Railways
Tunnel by NATM,
Mangalore Karnataka.
1|Page
Angelique International Limited
PROJECT ENGINEERING,PROCUREMENT AND CONSTRUCTION COMPANY July 2018 –Present
HRT (Head Race tunnel) total length 4.70 Km, finished diameter 3.00meter, modified horseshoe shape, by NATM
methodology and also completed the Powerhouse (Service Bay, Machine Hall, Control room and Tail Race channel),
switchyard & Penstock work carried out as Site in- charge.
☞ Prepare, schedule, coordinate and monitor the assigned Site In-Charge of Power House including Service Bay, Tail Race
channel, Machine Hall and control room building, Switchyard and Penstock construction.
☞ Interact daily with the clients to interpret their needs and requirements and represent them in the field.
☞ Assign responsibilities and mentor project team.
☞ Cooperate and communicate effectively with project manager and other project participants to provide assistance and
technical support.
☞ Direct engineering activities ensuring compliance with environmental, safety, or other government regulations.
☞ Manage and direct the construction, operations, or maintenance activities at project site.
☞ Develop or implement engineering solutions to clean up industrial accidents or other contaminated sites.
Project: Doubling of track B/w MANJ- PMNB section – Proposed construction of BG single underground
Railways Tunnel by NATM, Mangalore Karnataka
Key Result Areas: Good Knowledge of NATM: All Execution work done by tunneling method, New Austrian Tunneling
method (NATM) Execution works, Drilling & Blasting, Excavation with complete support works, Wire Mesh, Shotcrete, and
Lattice Girder. Rock-bolt (SD, SN, ) done as per drawing and Technical specification and (S.O.B) Instructed by Engineer in
charge.
Also work done in very poor strata and Adverse Geological condition with Water discharge 100 Liter per second. Work
carried out with Pipe Roofing and Grouting.
2|Page
Construction of Tunnel drainage system, Final Lining and Ventilation slab casting.
❖ Execute and to supervise the day-to-day entrusted works as per the approved plans, technical specification
and drawings complying with all quality requirements.
❖ Execute work at site as per the project plan, ensure compliance with the safety norms and minimize wastage.
M/s Pratibha Industries Ltd (FEMC- PRATIBHA JV).July 2015- December 2016
Post: Graduate Engineer Trainee
☞ Excavation of tunnel by NATM (Breaking, Excavation, Shotcreting ,Lattice Girder, Gantry Erection And Concrete Lining
In Tunnel)
☞ Also providing Pipe Roofing And Fore Polling On Loose And Cavity Area.
☞ Planning, scheduling and controlling the project work as per target date.
☞ Controlling and monitoring the quality at site.
☞ Daily coordination with surveyor on alignment control
☞ Monitoring of execution quantities
☞ Maintaining contemporary shift reports.
☞ Nozzle Grouting for seepage protection inside tunnel (by Master Flex 801).
☞ Identification of delay time and causes etc.
☞ Coordination of operational requirements within the shift of electrical and mechanical department regarding routine
maintenance and delays for repair.
☞ Coordinating with management regarding planning.
☞ Ensuring total safety measures in work premises.
☞ Preparing detailed drawing of project for successful completion
3|Page
Academic Qualification
BSc. (Physics and Math) KANPUR UNIVERSITY , UTTAR 2009 - 2012 54.14 %
PRADESH
Computer Skill
Personal Information
Father’s Name: Late Mr. Phool Chandra Yadav
Date of Birth: 7th December 1991
Marital status: Un-Married
Nationality: Indian
Permanent Address: Village- Kodhniya , Post – Bharari, Dist.- Allahabad
Uttar Pradesh PIN- 212303, India
Passport No. P1285331
Notice period: 01 Months
Present CTC: 12.00 Lakh per annum.
Expected Salary: Negotiable
4|Page
Declaration
I undersigned hereby declare that the information furnished above is true, complete and correct to the best of my
knowledge.