A. Ground Floor
1. Paintable Sealant at Basedboard, Stairs & Vinyl Termination,
Convenience Outlests(4)/DONE

2. Paintable Sealant – GF CR SINK/DONE


3. GC CR Sink – Pop Up Drain Replaced/DONE

4. Production & Counter Area – Tiles (1 pc Installed, 4 pcs Left


onsite as stocks)/DONE

5. Production Area/Dispatch – Additional 1 pc Corner


guard/DONE
6. Stairs Concrete Area – Hole where CCTV was removed/Placed
a painted Cover

B. Second Floor
1. Paintable Sealant at Convenience Outlets (14) and Swtiches
(3)/DONE
C. Back of the Building
1. Roof Framing – Paint Retouch/DONE

2. Gutter – Realignment/DONE

3. Insulation Lapping – Installed Duct Tape/DONE


OTHERS:
1. Production Area – 6 units Stainless Strainer for Trench Drain/DONE

2. Second Floor Tile Trim/Done


*Applied Sealant on Gaps/Done
SCANNED COPY OF SIGNED DOCS:
Prepared by: Acknowledged by:

Greig Stephen A. Mabituin Ar. Jason Alcanse


Project Engineer/MAGSI BUILDERS INC. Project Engineer/Max’s Group Inc.