Comprehensive Development for Namibe Bay

( Pakage -2) Namibe

EARTHING SYSTEM
Description: Inspection Checklist for Installation of Earthing Date:

Test Voltage : Temperature: Type of Rating: Cal Due Date:

III. INSPECTION CHECK ITEMS

TOA Employers
Representative
ITEMS COMMENTS
Not Not
Passed Passed Passed Passed

1 Ensure Earth pit/electrode confirms to Material submittal. □ □ □ □


2 Check the Installation, location of down conductor and Test point as per the approved shop
drawing. □ □ □ □
3 No visible damage to the material installed. □ □ □ □
4 Correct type and of earth pit is selected. □ □ □ □
5 Check the Installation of Bus bar at correct location and ensure the material is as per
approval. □ □ □ □
6 Suitable sizes of earth rod is selected. □ □ □ □
7 All earth connection are acceptable. □ □ □ □
8 All earth cable lugs are crimped and connected. Clamps are tightend properly. □ □ □ □
9 Check the Continuity and Installation of Ground cable. □ □ □ □
10 Correct size of earth pit closing block is selected. □ □ □ □
11 Check the number of installed Earth Electrodes. □ □ □ □
12 Exothermic welding or Cclamp connection in good condition. □ □ □ □
13 Earth resistance test □ □ □ □
14 □ □ □ □

Contractor Employers Representative


TOA CORPORATION Logistica
Name Name

Signature Signature
Remark: Passed ,Not Passed