ILOILO 1 ELECTRIC COOPERATIVE, INC.

( ILECO-1 )
Tigbauan, Iloilo

December 3, 2022

PROJECT COST ESTIMATE


CONSUMER NAME: OLUMIDE OLUSEYI KUMAPAYI
Address: B-5 L-9 SAVANNAH GLADES B. SUBD., BRGY. ABILAY NORTE, OTON, ILOILO
Business Type: Residential
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: 1936301

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00
b. Application Fee payable to ERC

SUB-TOTAL 10,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)
GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. OLUMIDE OLUSEYI KUMAPAYI
TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Tigbauan, Iloilo

December 3, 2022

PROJECT COST ESTIMATE


CONSUMER NAME: OCHON, THERESA
Address: C. M. RECTO STREET, CORNER MABINI ST., OTON, ILOILO
Business Type: Commercial
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: 424049/08-YOVV-10

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00
b. Application Fee payable to ERC

SUB-TOTAL 10,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)
GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. OCHON, THERESA


TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Tigbauan, Iloilo

December 3, 2022

PROJECT COST ESTIMATE


CONSUMER NAME: LIFEBANK FOUNDATION INC. (JOSEPH PERLAS)
Address: Brgy. Duyan Duyan Sta. Barbara, Iloilo
Business Type: Commercial
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: 1217186/13-LFID-20

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00
b. Application Fee payable to ERC

SUB-TOTAL 10,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)
GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. LIFEBANK FOUNDATION INC. (JOSEPH PERLAS)
TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Tigbauan, Iloilo

December 3, 2022

PROJECT COST ESTIMATE


CONSUMER NAME: KRIS WYROL JEZ FERNANDEZ ASTROLOGO
Address: BLK 25 Lt 3, Phase 2 Deca Homes Subd.
Business Type: Residential
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: 12-4653-01/1864653

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00

SUB-TOTAL 10,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)
GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. KRIS WYROL JEZ FERNANDEZ ASTROLOGO
TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Tigbauan, Iloilo

December 3, 2022

PROJECT COST ESTIMATE


CONSUMER NAME: VIC BRYAN OCHON
Address: C.M. Recto Street
Business Type: Residential
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: 08-YOVV-10

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00

SUB-TOTAL 10,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)
GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. VIC BRYAN OCHON
TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Tigbauan, Iloilo

December 3, 2022

PROJECT COST ESTIMATE


CONSUMER NAME: FANDAGANI, RAMON
Address: Maninila Miag-ao
Business Type: Residential
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: 175781

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00

SUB-TOTAL 10,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)
GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. FANDAGANI, RAMON


TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Namocon, Tigbauan, Iloilo

PROJECT COST ESTIMATE


CONSUMER NAME:
ADDRESS:
BUSINESS TYPE:
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.:

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 11,000.00


a. Cost of KWH Meter (Bi-directional) 8,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00

TOTAL COST ---------------------------------------------------------------------------------------------------- Php 12,000.00

V. Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MRS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR.


TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
ILOILO 1 ELECTRIC COOPERATIVE, INC.
( ILECO-1 )
Namocon, Tigbauan, Iloilo

PROJECT COST ESTIMATE


CONSUMER NAME:
ADDRESS:
BUSINESS TYPE: RESIDENTIAL
PROJECT NAME: NET METERING

ACCOUNT NO.:

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 1,000.00


a. Cost of KWH Meter (Bi-directional)
b. KWH Meter box
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 1,000.00


a. COOP Admin Fee 1,000.00

TOTAL COST ---------------------------------------------------------------------------------------------------- Php 2,000.00

OTHERS

1 Application Fee Payable to Energy Regulatory Commission (ERC) Php 1,500.00


(In a form of Manager's Check)

2 Mailing Fee (through LBC) Php 310.00

Prepared by: Checked by:

ENGR. ARNEL MAÑAS MRS. ARLENE SESE


Cons. & Maint. Sec. Head OIC-Internal Auditor

Noted by: Approved: Conformed by:

ENGR. GC JUNE GARANCHON ENGR. MIGUEL A. PAGUNTALAN JR. 0


TSD Manager General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
consumer / accounting / billing / ISD
December 3, 2022

PROJECT COST ESTIMATE

CONSUMER NAME: MR. VIRGILO DULALIA


Address: Sta. Barbara Heights Subd., Inangayan, Sta. Barbara
Business Type: Residential
PROJECT NAME: NET METERING APPLICATION

ACCOUNT NO.: __________________________

BILLING PARTICULARS AMOUNT

I. Primary/Secondary Line Materials


a. Cost of Line Materials
b. Cost of Labor

II. KWH Meter & Accessories Php 9,000.00


a. Cost of KWH Meter (Bi-directional) 6,500.00
b. KWH Meter box 1,500.00
c. Meter Installation (1 unit @ P1000 unit) 1,000.00

III. Transformer & Accessories


a. Cost of Transformer
b. Transformer Installation
c. Transformer Banking

IV. Miscellaneous Charges Php 2,500.00


a. COOP Admin Fee 1,000.00
b. Application Fee payable to ERC 1,500.00

GRAND TOTAL COST Php 11,500.00

Prepared by: Checked by:

ARNEL MAÑAS JECTOFER ARLOS


Cons. & Maint. Sec. Head Internal Auditor

Noted by: Approved: Conformed by:

GC JUNE GARANCHON RHEA T. PALACIOS MR. VIRGILO DULALIA


OIC-TSD OIC-General Manager Signature Over Printed Name of Applicant

Notes:
1 Installation jobs near LIVE circuit should be conducted during NGCP scheduled BLACK-OUT
2 The Cost of Hauling is applicable only from ILECO-1 main office up to the last accesable road by the
ILECO-1 service vehicle.
3 The consumer is responsible for the Right-of-Way acquisition and line clearing.
4 Only materials and accessories from ILECO-1 such as pole, transformer, and kWhr meter if
applicable) are included in this estimate.
5 Service drop conductor insulated copper wire from transformer bushing to kWhr meter to service entrance
is not included in this cost estimate.
6 The applicant must install a circuit breaker accessible to ILECO-1 line crew.
Cc: consumer / accounting / billing / ISD

You might also like