Professional Documents
Culture Documents
H780M Serials Quick Guide V2.2
H780M Serials Quick Guide V2.2
2015-06-05 Ver2.1
Beijing Zhong Rui Zhi Cheng Technology Co., Ltd www.BJZRZC.com
ZhongRuiZhiCheng Technology, Your Trusted Partner!
Catalog:
1. Assemble
2. Testing System
3. Configuration
4. User Trim
5. Temperature Sensors
6. Advanced Settings
7. Variable Monitoring
Step 1: Assemble
H780M Interface:
Power Supply: DC8~24V
RS485:Standard 2 wire RS485 interface A and B
Figure 1:316 probe, PTFE tube, the signal processing board, magnetostrictive wire,
high temperature wire, screw, rubber, heat shrinkable tube.
北京中锐智诚科技有限公司 www.BJZRZC.com
中锐智诚,您值得信赖的合作伙伴!
Figure 2:PTFE pipe’s length should be the same with the depth of 316 probe rod.
Magnetostrictive wire and high temperature wire length should be more than 316 probe
20CM.
Note: Magnetostrictive wire should be neat and tidy, no bending, even bending small
will also affect the transmission of signal.
北京中锐智诚科技有限公司 www.BJZRZC.com
中锐智诚,您值得信赖的合作伙伴!
Figure 3a:High temperature wire stripping 2CM, flexible bend magnetostrictive wire;
Figure 3b:The high temperature wire and magnetostrictive wire twisted and welded together;
Figure 3c:The bottom end use heat shrinkable tube processing. Bottom diameter should be
small enough, to ensure that can move freely in PTFE tube.
北京中锐智诚科技有限公司 www.BJZRZC.com
中锐智诚,您值得信赖的合作伙伴!
•Figure 4a:The high temperature wire and magnetostrictive wire insert into the signal processing
board plastic frame;
•Figure 4b:Mount rubber, from the center through, can use pliers. Magnetostrictive wire should cut
off the upper part..
北京中锐智诚科技有限公司 www.BJZRZC.com
中锐智诚,您值得信赖的合作伙伴!
•Figure 5a:Insertion of PTFE tube, heat shrinkable tube at the bottom of the PTEE tube to ensure the
distance of about 1CM(Look carefully at the central black shadow). The white rubber at bottom to
play a sealing role.
•Figure 5b:After the end position is determined, the upper end of the rubber processing to the proper
position, and insert the pillars.
北京中锐智诚科技有限公司 www.BJZRZC.com
中锐智诚,您值得信赖的合作伙伴!
•Figure 6a:First tighten bottom screws, then weld the return high temperature wire to VIA hole B.
•Figure 6b:Tighten the top screw (This step must be carried out after tighten bottom screws);
北京中锐智诚科技有限公司 www.BJZRZC.com
中锐智诚,您值得信赖的合作伙伴!
•Figure 7:The overall inserted into the 316 rod, and tighten the 2 screws.
北京中锐智诚科技有限公司 www.BJZRZC.com
ZhongRuiZhiCheng Technology, Your Trusted Partner!
Modbus CONFIG
Tool — H780M
USB
Software Magnetostrictive Level
or RS232 RS232 / RS485
Converter
Note: You can use Modbus-Config Tool software, or use the third party
software, to access the corresponding register accordance with the
MODBUS protocol.
Dead zone,>100 mm
Sensor value h
H=h + S
H
0 0
Bottom Offset S
Note:
Only experienced manufacturers are allowed to change these parameters.
If the parameter is set incorrectly, may lead to level meter not working!
2. Read Level
Registers start address is 16387, assume the first float value is 1000, the second float value is 100, then the differ is 900.
The host sends (Assume the slave address is 2):
Address Function Register Register CRC
code Address Numbers Checksum
0x02 0x04 0x40, 0x03 0x00, 0x06 CRCH, CRCL
Slave response data:
Address Function Data Data CRC Checksum
code Length
0x02 0x04 0x0C 0x44, 0x7A, 0x00, 0x00, 0x42, 0xC8,0x00, 0x00, CRCH, CRCL
0x44, 0x61, 0x00, 0x00
Operation Code:
DEFAULT_VALUE 0x0000;
{ 0, "Selecting Operation" },
{ 1, "Start Serach DS18B20" },
{ 3, "Save DS18B20 Address" },
Addr: Room 9B, No.1 International Science & Technology Park No.2
ShangDi Info Road, HaiDian District, Beijing, 10085, China
Tel: 010-82894308, 010-82894290
Http: www.BJZRZC.com