The document provides a method statement for constructing and preparing the Kinta District Mosque in Ipoh, Perak. It outlines 9 tasks for installing solid UCO wall panels including preparing the surface, installing bottom tracks, attaching panels with Sika Ceram adhesive and dowels, cutting openings, and applying fiberglass mesh and bitumen between panels. The tasks will utilize tools like string, levels, saws, hammers, and involve a crew of skilled and semi-skilled laborers over a total duration of around 3 weeks.
How to Make Electrical Machines: Containing Full Directions for Making Electrical Machines, Induction Coils, Dynamos, and Many Novel Toys to Be Worked by Electricity
The document provides a method statement for constructing and preparing the Kinta District Mosque in Ipoh, Perak. It outlines 9 tasks for installing solid UCO wall panels including preparing the surface, installing bottom tracks, attaching panels with Sika Ceram adhesive and dowels, cutting openings, and applying fiberglass mesh and bitumen between panels. The tasks will utilize tools like string, levels, saws, hammers, and involve a crew of skilled and semi-skilled laborers over a total duration of around 3 weeks.
The document provides a method statement for constructing and preparing the Kinta District Mosque in Ipoh, Perak. It outlines 9 tasks for installing solid UCO wall panels including preparing the surface, installing bottom tracks, attaching panels with Sika Ceram adhesive and dowels, cutting openings, and applying fiberglass mesh and bitumen between panels. The tasks will utilize tools like string, levels, saws, hammers, and involve a crew of skilled and semi-skilled laborers over a total duration of around 3 weeks.
The document provides a method statement for constructing and preparing the Kinta District Mosque in Ipoh, Perak. It outlines 9 tasks for installing solid UCO wall panels including preparing the surface, installing bottom tracks, attaching panels with Sika Ceram adhesive and dowels, cutting openings, and applying fiberglass mesh and bitumen between panels. The tasks will utilize tools like string, levels, saws, hammers, and involve a crew of skilled and semi-skilled laborers over a total duration of around 3 weeks.
NO DIAGRAM TOOLS LABOUR 1. Make sure the surface is clean as 196.58m² String 2 Skilled 1 day site preparation mark the areas Measuring Labour with string or oil string and Tape measuring tape to measure the position.
2. With the guide of the mark 196.58m² String 2 Semi- 1 day
earlier, install the bottom track Measuring Skilled align with and hold it in place Tape Labour with small nails or clamps. Then Screws screw through the pre-drilled holes with 1 ½ “screws. 3. Plaster the Sika Ceram 228 at 196.58m² Trowel 2 Semi- 2 days only one edge of the panels. Sika Skilled Ceram 288 was mixed with water Labour using whisk blender to achieve a perfect combination. Then, fully patch the Sika Ceram 288 at one of the panel’s edges. A moist sponge was used to flatten excess Sika Ceram 288.
NO TASK QUANTITY SEQUENTIAL MACHINERY MANPOWER/
DIAGRAM TOOLS LABOUR 4. Next, the panel the panel on 196.58m² UCO Wall 3 Semi- 3 days which Sika Ceram 288 has been Panel Skilled placed is lifted and placed 1" x 2" wood Labour vertically on the bottom track. The 1" x 2" wood is used to support the panels that have been placed on the bottom track. 5. Then, water levels are used No Water Level 1 Semi- 1 day vertically and horizontally to Skilled check and ensure each panel Labour placed on the bottom track is in the proper position. 6. Connecting devices are mounted NO Drilling 3 Semi- 2 days on each bottom of the panel for Hammer Skilled the purpose of panel rigidity. In Labour this step, the bottom track is drilled and fitted with a Y10 grade “7-shape” dowel bar. A hammer is used to install the Y10 “7-shape” dowel bar on each side of the bottom corner of the panel.
NO TASK QUANTITY SEQUENTIAL MACHINERY MANPOWER/ DURATION
DIAGRAM TOOLS LABOUR 7. The panels are marked and cut NO Drilling 2 Skilled 2 days according to the approved Hammer Labour drawing measurements for the Saw purpose of door and window Machine openings. The surface of the panel to be cut is moistened with water to facilitate the cutting process using a circular saw machine. 8. Install of ‘locks’ on each side of NO Hammer 2 Semi- 2 days the panel surface and on the top R6 Skilled of the panel. a “stapler-shape” Labour steel reinforcement link of grade R6 is installed as a ‘lock’ at the connection between the two surfaces of the panel that is at the bottom, middle and top of the wall. 9. Applying the fiberglass mesh 196.58m² Fibre Mesh 2 Semi- 1 day with bitumen between the gap on Bitumen Skilled the wall. his step is like gluing Labour the wall to make it stronger and tougher for a long time. Bitumen will provide a water-resistant wall, so that the rain from outside can’t go through between the wall.