MANAGE CONSTRUCTION
Eff Dt.: 10-Jul-20
Page No: 1 &2
1.0. OBJECTIVES : To complete the project on time, within cost and with defined specifications
9.0.
RECORDS :
Name of the Record
(Forms, File - Soft/H Retention
Document No. Location Disposal Authority
Formats & Work ard Period
instructions)
Compliance report from
9.1 EG-PR-21-EX-MC-COR-01 BIM -360 Doc Soft
online portal
9.2 Drawing Tracker EG-PR-21-EX-MC-DRT-01 BIM -360 Doc Soft
9.3 RFI Form: EG-PR-21-EX-MC-RFI-01 BIM -360 Doc Soft
9.4 Updated drawing register EG-PR-21-EX-MC-UDR-01 BIM -360 Doc Soft
9.5 BG tracker Form EG-PR-21-EX-MC-BGT-01 BIM -360 Doc Soft
9.6 Manpower histogram EG-PR-21-EX-MC-MPH-01 BIM -360 Doc Soft
9.7 Delay Log EG-PR-21-EX-MC-DLG-01 BIM -360 Doc Soft
9.8 Hindrance Register EG-PR-21-EX-MC-HNR-01 BIM -360 Doc Soft
9.9 Weekly look ahead plan EG-PR-21-EX-MC-WLP-01 BIM -360 Doc Soft
10.0 Daily progress report. EG-PR-21-EX-MC-DPR-01 BIM -360 Doc Soft
10.1 MOM of PRM EG-PR-21-EX-MC-PRM-MOM BIM -360 Doc Soft
Updated Progress Report
10.2 EG-PR-21-EX-MC-UPR-01 BIM -360 Doc Soft
(MSP)
10.3 Quality NC tracker EG-PR-21-EX-MC-QNCT-01 BIM -360 Doc Soft
10.8 All NOC's from Authorities Approval register BIM -360 Doc Soft
Harleen Oberoi
Tapas Adhikary All RHE Head Of PMG
Doc No: EG-PR-34-EX-MC-01
Rev No: R0
MANAGE CONSTRUCTION
Eff Date: 10-Jul-20
Page No: 1 to 5
S.
PROCESS FLOW R A S I RECORD
No.
1 Manage Construction
A) Preconstruction compliances (statutory approvals)
B) Manage drawings before start of construction
C) Service request for awarding of contracts
D) Contract administration
E) Manage Progress
F) Scrap Management
1. Statutory
approvals received
Go for "Manage
Is any Approval No drawings before
needs to be start of
extended? construction
process"
Yes
Request extension of Approval Head PMG, Updated Compliance
process RDC CR RHE
CO-PPMC report
1. Pre‐construction
process (timelines
for design
deliverables and
approvals)
Drawing Tracker
Prepare and validate GFC drawing Head- Respective PH, RHE,
tracker CO-Design EG-PR-21-EX-MC-DRT-
Design consultants RDC
01
Review and comment on GFC
drawings PH RDC RHE CO-Design
15 days
Issue GFC
Is there any
No drawings to
discrepancies / Transmittal records
contractor RDC PH RHE
errors / (drawing log)
through BIM
missing data?
360 or
transmittal
form
Yes RFI log Form
Raise request for information (RFI) to RFI Form:
RDH for onward action with PH RDC RHE CO-Design
respective consultants EG-PR-21-EX-MC-RFI-01
1. RFI approval
Review and Close RFIs RFI approval RDC CO-Design PH RHE, B&C
notification
notification
Page 1 of 5
Doc No: EG-PR-34-EX-MC-01
Rev No: R0
MANAGE CONSTRUCTION
Eff Date: 10-Jul-20
Page No: 1 to 5
S.
PROCESS FLOW R A S I RECORD
No.
C Service request for awarding of contract
Project-
Raise service request for award of PH PCR, RHE CO-MHC Service request
PPMC
contract
1. Tender Drawing
2. Validated BOQ
4. Technical Compile tender documents Tender document
Head- CO-Design,
Specifications CO-MHC Head PMG package No.
Contracts B&C
4. Approved R1
budget
5. MSP Schedule
Validate tender documents by site Signoff sheet of tender
PH RHE PCR CO-Contract
management document package No.
Head PMG,
Float tender document, evaluate and
award of contract as per contract Head- Tender B&C,
warding process CO-MHC Contract Agreement
Contracts committee Finance, PH,
RHE
D) Contract Administration
1. Contract
Transmittal Tracker
Manage all contractual
correspondence. PH RHE CO-Contract Head PMG Form:
EG-EX-MC-TMT-01
F) Manage Progress
1. Annual
Engineering plan
Weekly look
Prepare weekly look ahead plan from Project Weekly look ahead plan.
MSP PH Regional PPMC RHE
PPMC EG-EX-MC-WLP-01
Page 2 of 5
Doc No: EG-PR-34-EX-MC-01
Rev No: R0
MANAGE CONSTRUCTION
Eff Date: 10-Jul-20
Page No: 1 to 5
S.
PROCESS FLOW R A S I RECORD
No.
MOM of PRM to be
Monthly Progress Review Meeting MOM PH, RHE,
(PRM) with Head PMG CO-PPMC Head PMG MD prepared by Regional
Project PPMC
PPMC
1. Tata Realty
Execution of work as per the Tata
Safety and Realty Safety and Quality assurance PH RHE PQE, PSE Progress Report
Quality plan.
assurance plan
1. Architect certificate
Get milestone completion certificate 1. Architect HE, Head
as per RERA PH RHE Project PMC 2. Engineers Certificate
certificate MAG
3. CA certificate
2. Engineers
Certificate
3. CA
Is virtual
No completion Virtual completion check
achieved list. Form:
Yes
Acknowledgement for
Apply for all NOCs and OC PH RHE CR Head PMG application of NOCs and
OC
Virtual completion
Virtual PH PQE CO-QAQC RHE certificate to contractor.
Desnagging
completion EG-EX-MC-VCC-01
Regional
Receipt of NOCs and OC / POC 1. NOC from Authorities
CR PH Design Head, Head PMG
2. OC from Authority
CR
Page 3 of 5
Doc No: EG-PR-34-EX-MC-01
Rev No: R0
MANAGE CONSTRUCTION
Eff Date: 10-Jul-20
Page No: 1 to 5
S.
PROCESS FLOW R A S I RECORD
No.
Facility
Take customer Feedback Customer feedback form.
Manageme PH PQE
EG-EX-HO-CFF-01
nt
F) Scrap Management
1. Contractors
agreement copy
2. Ra Bills
3. Material
reconciliation Check the quantity of scrap at site PH RHE
statement to check
the quantity of
scrap with respect
to the conditions
Is adequate
mentioned in the Wait for
quantum of scrap
specifications No sufficient
generated at site
scrap
(for Example a quantity
vehicle load or a
truck load)
Yes
Request for quotations from the
shortlisted agencies/ scrap dealers for Project - CO-
sale of scrap. (Regional players or PH RHE
scrap dealers who are region specific) Contract Procurement
Make the comparative statement of
rate received from various vendor Project - CO-
PH RHE
and share with CO‐Procurement Team Contract Procurement
Check rates of scrap vendors with CO-
recent transaction towards the sale of RHE, Project -
Procuremen PH
scrap at the projects within the same Contract
t
region.
CO-
Negotiate with the scrap dealer and RHE, Project -
select H1 dealer Procuremen PH Head PMG
Contract
t
Head PMG,
Prepare NFR for approvals as per DOA PH RHE Project Contract CO-
Procurement
Incorporate the
comments and Is the NFR
send for No
approved
approval again
Yes
Weighing of scrap by representative
of contractor, scrap dealer and
company to ensure accurate weight. Sign off Billing Co-
Weigh slip to be signed by companies’ PH Project Contract Sign off Weigh slip
Weigh slip Engineer Procurement
representative as well as contractors’
representative.
Page 4 of 5
Doc No: EG-PR-34-EX-MC-01
Rev No: R0
MANAGE CONSTRUCTION
Eff Date: 10-Jul-20
Page No: 1 to 5
S.
PROCESS FLOW R A S I RECORD
No.
Receipt of payment in the form of DD
/ RTGS according to the invoice Site CO-
PH RHE, RHF Receipt of Payment
before physical dispatch of the scrap Accountant Procurement
outside the project area
Harleen Oberoi
Tapas Adhikary All RHE Head of PMG
Page 5 of 5