Performance Monitoring
and Improvement
6. Relationship Management
2. Risk Management
4. Supplier
Performance A Supplier Performance
Monitoring
Monitoring and
Improvement
B Assess Nonconforming
Product/Process/Service
4A.
Supplier
Performance
01 Supplier Metrics
3
Supplier Performance
Typical Performance Parameters:
Cost
Under/over budget, cost savings
Quality
Defect rate, returns, failures, damages
Schedule
On time delivery, shortages
Responsiveness
Willingness to change the order details (quantity,
design etc.)
4A.
Supplier
Performance
01 Supplier Metrics
Supplier Performance
Typical Performance Parameters:
Cost
Under/over budget, cost savings
Quality
Defect rate, returns, failures, damages
Schedule
On time delivery, shortages
Responsiveness
Willingness to change the order details (quantity,
design etc.)
6
Supplier Performance
The level of monitoring will depend upon the
risk level.
High value, high risk good and services will require
higher level of monitoring
Establish criteria for evaluating and monitoring
supplier performance against the contractual
obligations
Decision Analysis
4A.
Supplier
Performance 01 Supplier Metrics
03
Apply lean principles and applications
such as 5S, Kaizen, value stream
mapping, single minute exchange of dies Supplier Process Performance
(SMED), kanban, muda, standardized
work, takt time and error proofing to
reduce waste and increase performance.
(Evaluate)
9
Lean Principles for Supplier Performance
5S Kanban
Kaizen Muda (Waste Reduction)
Value Stream Mapping(VSM) Standardized work
Single minute exchange of dies Takt time
(SMED) Error proofing
10
5S
The 5S’s are simple but effective
methods to organise the workplace.
It however, goes beyond this simple
concept, and is concerned with
making orderly and standardized
operations the norm, rather than the
exception.
5S
11
5S
The 5S’s are simple but effective
methods to organise the workplace.
It however, goes beyond this simple
concept, and is concerned with
making orderly and standardized
operations the norm, rather than the
exception.
5S
Seiri Seiton Seison Seiketsu Shitsuke
12
Seiri Seiton Seison Seiketsu Shitsuke
5S Summary Slide 13
13
5S
1. Seiri (Sort)
Remove all of the clutter from the work
place
This requires the classifying of items into
two categories, necessary and
unnecessary, and storing or removing
the latter.
5S
Seiri Seiton Seison Seiketsu Shitsuke
14
5S
2. Seiton (Straighten)
Organize in an efficient and ergonomic
manner.
• Arrange items to minimise search time and
effort.
• Each item should have a designated place
A place for everything and everything in its
place.
5S
Seiri Seiton Seison Seiketsu Shitsuke
15
5S
3. Seison (Shine)
Clean up the entire area removing all
dirt
Seison means cleaning the working
environment.
It can help in the spotting of
potential problems as well as
reducing the risk of fire/injury by
cleaning away the potential causes of
accidents.
5S
Seiri Seiton Seison Seiketsu Shitsuke
16
5S
4. Seiketsu (Standardize)
Ensure standard ways of working for the
first three stages.
It can also be viewed as the
continuation of the work carried out
in Seiri, Seiton, and Seison.
5S
Seiri Seiton Seison Seiketsu Shitsuke
17
5S
5. Shitsuke (Sustain)
Ensure that 5S principles are part of the
culture
Shitsuke means self-discipline.
The 5 S’s may be viewed as a philosophy,
with employees following established and
agreed upon rules at each step.
By the time they arrive at Shitsuke they will
have developed the discipline to follow the
5 S’s in their daily work.
5S
Seiri Seiton Seison Seiketsu Shitsuke
18
Seiri Seiton Seison Seiketsu Shitsuke
5S Summary Slide 19
19
20
Kaizen
Kai + Zen
kai, which means 'change,' and
zen, which means 'good.'
Kaizen
21
Daily Management
Improvement from daily
management and operations.
Small Improvement
Starts with small improvement
Kaizen
Participation
Participation of the employees
Humanized Approach
Eliminates hard work,
Motivates employees,
creating sense of belonging and
sense of fulfillment
Kaizen Slide 22
22
Repeat
The Process
Kaizen Slide 23
23
Kaizen Blitz
Kaizen Blitz
24
Lean Principles for Supplier Performance
5S Kanban
Kaizen Muda (Waste Reduction)
Value Stream Mapping(VSM) Standardized work
Single minute exchange of dies Takt time
(SMED) Error proofing
25
Specify what creates value Identify all the steps along Make the value process flow Make only what is needed by Strive for perfection by
from the customer’s the process chain the customer continually attempting to
perspective. produce exactly what the
customer wants
26
Value Stream
maps
27
Created using SigmaXL® software
28
29
30
Setup Reduction
or
Single-Minute Exchange of Die - SMED
Setup Reduction
31
Setup Reduction
or
Single-Minute Exchange of Die - SMED
Setup Reduction
32
Setup Reduction
or
Single-Minute Exchange of Die - SMED
Benefits:
Reduced inventory
Even with higher number of turnovers,
the machine utilization increases
Elimination of setup errors
Reduces defect rates
Lower setup expenses Setup Reduction
33
Setup Reduction
or
Single-Minute Exchange of Die - SMED
Techniques in implementing SMED.
Separate internal from external setup
operations
Convert internal to external setup
Use functional clamps or eliminate
fasteners altogether
Adopt parallel operations
Eliminate adjustments
Setup Reduction
34
35
Pull Systems
Pull:
Produce based on demand
Providing product or service when
required by customer or the next
process.
Push:
Produce to stock
Based on demand forecast
Pull System
36
Pull Systems
Pull:
Limits the Work In Progress and
Inventory. (JIT)
Kanban cards
Pull System
37
Just in Time
JIT is a methodology with an aim to:
Reducing times within the production
system
As well as reducing response times from
suppliers and to customers.
Just in Time
38
Kanban
Kanban means Signboard (or billboard)
in Japanese.
Kanban is an inventory-control system
Taiichi Ohno developed it as a part of JIT
Kanban
39
Kanban
• Three bin system for supplied parts
• One bin is on the factory floor (the initial
demand point),
• One bin is in the factory store (the inventory
control point), and
• One bin is at the supplier.
• The bins usually have a Kanban card.
Kanban
40
41
Waste - Philosophy
Waste exist in all processes at all levels
in the organization.
Waste elimination is the key to
successful implementation of lean.
Waste reduction is an effective way to
increase profitability.
Waste
elimination
42
Muda
An activity that is wasteful and
doesn't add value or is
unproductive
Mura
Any variation leading to
unbalanced situations.
Muri
Any activity asking
unreasonable stress or effort 3 Categories of
from personnel, material or Waste
equipment.
43
Muda
Muda is a traditional Japanese term for
an activity that is wasteful and doesn't
add value or is unproductive
Type I Muda: (Incidental Work)
Non-value-added tasks which seam to be
essential. Business conditions need to be
changed to eliminate this type of waste.
Type II Muda: (Non-Value-Added Work)
Non-value-added tasks which can be
eliminated immediately. 3 Categories of
Waste
44
Mura
MURA: Any variation leading to
unbalanced situations.
Mura exists when
workflow is out of balance
workload is inconsistent
3 Categories of
Waste
45
Muri
MURI: Any activity asking unreasonable
stress or effort from personnel, material
or equipment.
For people, Muri means too heavy a mental
or physical burden.
For machinery Muri means expecting a
machine to do more than it is capable of or
has been designed to do.
3 Categories of
Waste
46
8 Types
of Wastes
Motion Defects
Unnecessary movement of Sorting, repetition or making
people or parts within a process. scrap
47
Transportation
Unnecessary movement of
people or parts between
8 Types
processes. of Wastes
48
Inventory
Materials parked and not
having value added to
8 Types
them. of Wastes
49
Motion
Unnecessary movement of
people or parts within a
8 Types
process. of Wastes
50
Wait Time
People or parts waiting for a
work cycle to finish.
8 Types
of Wastes
51
Over Processing
Processing beyond the
demand from the
8 Types
customers. of Wastes
52
Over Production
Producing too much, too
early and/or too fast.
8 Types
of Wastes
53
Defects
Sorting, repetition or
making scrap
8 Types
of Wastes
54
Under Utilized Staff
Failure when it comes
to exploiting the knowledge
8 Types
and talent of the employees. of Wastes
55
56
Standard Work
Doing work in a standard way
All people do one work in one way only
Improvement made in the process leads
to revised standard work
Standard Work
57
Lean Principles for Supplier Performance
5S Kanban
Kaizen Muda (Waste Reduction)
Value Stream Mapping(VSM) Standardized work
Single minute exchange of dies Takt time
(SMED) Error proofing
58
Takt Time
Takt time is the time in which a product needs to be
produced in order to satisfy customer demand.
Takt time =
Net Operating time per period
Customer demand per period
59
Takt Time
For example
60
Takt Time
For example
Customer wants 10 units per week,
Plant operates 40 hour per week
Two breaks of 10 minutes and 40 minutes lunch break daily.
(5 days week)
Net operating time = 40 hrs – 5x(1 hr)= 35 hrs
Takt Time = 35/10 = 3.5 hrs.
Takt time is not related to how much time it takes to make
the unit.
61
62
Poke-yoke
Poke-yoke (pronounced "POH-kah YOH-
kay") was invented by Shigeo Shingo in
the 1960s.
Poke-yoke
63
Types of Poke-yoke
Prevention.
engineers the process so that it is impossible
to make a mistake.
remove the need of correction.
Detection.
signals the user when a mistake has been
made.
they do not enforce the correction.
Poke-Yoke
64
4. Supplier
Performance
Monitoring and A Supplier Performance
Monitoring
Improvement
Assess and evaluate nonconforming
B Assess Nonconforming
Product/Process/Service
C
materials to determine whether a
material review board (MRB) requires
Supplier Corrective and
disposition. Conduct risk assessments to Preventive Action
prevent future discrepancies. (Evaluate)
65
66
Classification of Nonconformity
67
68
Disposition
69
Repair vs Rework
Rework: action on a nonconforming product or service to
make it conform to the requirements.
Repair: action on a nonconforming product or service to make
it acceptable for the intended use
70
MRB
The Material Review Board (MRB) consisting of quality and
engineering is responsible for the disposition of
nonconforming material.
71
Risk Management
72
Analyzing Risk
Very Low Low Medium High Very High
Probability
Impact
73
Risk Responses
74
4. Supplier
Performance A Supplier Performance
Monitoring
Monitoring and
Improvement
B Assess Nonconforming
Product/Process/Service
75
4C.
Supplier
Corrective and
Preventive Action 01Root Cause Analysis Tools
and Methods
76
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
77
78
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
79
Five Whys
Leakage from
Oil spill on floor
Ask “why” multiple times pump
to reach to the root cause
of the problem.
Gasket Sub standard
damaged gasket
Policy of
ordering to
lowest bidder
80
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
81
Brainstorming
82
Brainstorming
Four Rules:
Focus on quantity
Withhold criticism
Welcome unusual ideas
Combine and improve ideas
83
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
84
Production Records
Examples:
Drawings, Sketches and procedures
Shop travelers / Job ticket
Calibration stickers
Electronic records
85
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
86
What?
Shows the processes as boxes connected by arrows and decision
boxes.
Why?
Helps in understanding the process flow and interrelationships
between processes.
87
Review of Process Flow (Flow Chart)
Start / Decision
Start
End
Process
Process 1
End
Delay Preparation
Process 2 Process 3
Inspect
Data Document Connector
Accepted
Rejected
88
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
89
Check Sheet
What?
A manual data-collection form
Used to record the number of observations or occurrences of
certain events.
Why?
To collect and display the data.
To detect patterns.
Solving a problem.
90
Check Sheet
Defect
Defect Scratch Loose Cap Label Volume Leakage Frequency
Capacity
91
Check Sheet
92
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
93
Cause and effect diagrams (CE)
94
95
What?
A tool to display the relationship between an effect (e.g., a problem
statement) and the its causes.
Why?
To identify the various causes affecting a problem, as a part of Root
Cause Analysis or Corrective Action plan.
Helps a group reach a common understanding of a problem.
96
Cause and effect diagrams (CE)
97
98
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
99
Pareto Chart
100
Pareto Chart
What?
Similar to a bar chart, where the bars are arranged in descending
order of magnitude.
Why?
To prioritize actions needed to solve complex problems.
To sort out the “vital few” from the “trivial many.”
To separate important from unimportant causes contributing to a
problem.
101
Pareto Chart
Defect
Defect Scratch Loose Cap Label Volume Leakage Frequency
Capacity
102
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
103
104
R series = R1 x R2 x R3 …. Rn
105
Fault Tree Analysis
OR gate
Output occurs if any inputs occur.
If all of the inputs fail, the system fail. OR gate AND gate
R2=0.80
106
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
107
108
Topics Covered
The list of tools have been rearranged.
5 Why’s
Brainstorming
Production records
Root Cause Analysis –
Review of process flow
Introduction
Check sheets
RCA Tools Cause and effect diagrams (CE)
Pareto analysis
Fault tree analysis
Measurement system analysis (MSA)
Design of experiments (DOE)
109
Introduction
We conduct experiments in our daily life.
Car:
Does AC affect the car mileage?
Does number of passengers affect the car
mileage?
What about tire pressure, speed …..
Course selling:
Does intro video affects the sale?
What about course length, quizzes, closed Design of
captions …..
Experiments
110
Design of Experiments
Design of Experiments (DOE) is a method
to find out the relation between factors
affecting a process and the output of the
process.
A/C – ON Tire
or OFF Pressure
Number of
Passengers
Car
Speed
Design of
Mileage
Experiments
111
Design of Experiments
Conventional approach to deal with this
type of question is OVAT (One Variable at
a time) / OFAT (One Factor at a Time)
A/C – ON Tire
or OFF Pressure
Number of
Passengers
Car
Speed
Design of
Mileage
Experiments
112
Design of Experiments
Using the Design of Experiments we seek
the answer to such questions with
minimum effort and expenditure.
A/C – ON Tire
or OFF Pressure
Number of
Passengers
Car
Speed
Design of
Mileage
Experiments
113
A/C – ON Tire
or OFF Pressure
Number of
Speed
Passengers
Car
Mileage
Y X
Y = f (X)
Output Input
Output (Y) is the
Dependent Variable Independent Variable function of inputs (X)
Response (or Outcome) Factor
114
Response: The output(s) of a
process. Sometimes called
dependent variable(s).
Factor: A factor of an
experiment is a controlled
independent variable; a variable
whose levels are set by the
experimenter. These can be
numeric or categorical.
Response and
Factors
115
116
117
For first two factors only you will
need to conduct 10 experiments 25 psi
Treatment # passengers A/C
ON 30 psi
1 1 ON
OFF 35 psi
2 1 OFF
3 2 ON A/C – ON Tire
4 2 OFF or OFF Pressure
5 3 ON
1
6 3 OFF 2 Number of
60 Km/hr
Speed
7 4 ON 3 Passengers
Car 80 Km/hr
8 4 OFF
4 Mileage 100 Km/hr
9 5 ON
10 5 OFF 5 120 Km/hr
118
119
1 Number of
60 Km/hr
Speed
Passengers
5 Car 100 Km/hr
Mileage
120
Response: The output(s) of a
process. Sometimes called
dependent variable(s).
Treatment # A/C L/100 km
passengers
1 1 ON 13.8
2 1 OFF 13.6
3 2 ON
4 2 OFF
5 3 ON
6 3 OFF
7 4 ON
8
9
4
5
OFF
ON
Response
10 5 OFF
121
A/C L/100 km
ON 13.8
Errors
OFF 13.6
122
Errors
123
How to deal with nuisance factors?
Controllable
Blocking (e.g. city vs Highway
drive, male/female)
Uncontrollable
Randomization (e.g. order of
treatment)
Errors
124
16 males Experimental
Treatment A
Group
Compare Results
Males
Control
Placebo
Group
Patients
Experimental
Treatment A
Group
16 males Females
Compare Results
14 females Control
Placebo
14 females Group
125
126
Replication / Repetition
Performing the same treatment
combination more than once.
127
128
Milk : 40 cc vs 80 cc
129
Coffee making process – 150cc
130
# Sugar Milk
1 - -
2 - +
3 + - DoE Graphs and
4 + + Plots
131
132
Coffee making process – 150cc
133
6 9
# Sugar Milk Rating Sequence +
1 - - 3 2
Milk
2 - + 6 4
3 + - 6 1 -
4 + + 9 3 3 - Sugar + 6
134
6 9
# Sugar Milk Rating Sequence +
1 - - 3 2
Milk
2 - + 6 4
3 + - 6 1 -
4 + + 9 3 3 - Sugar + 6
135
6 9
# Sugar Milk Rating Sequence +
1 - - 3 2
Milk
2 - + 6 4
3 + - 6 1 -
4 + + 9 3 3 - Sugar + 6
Y = B0 + B1X1 + B2X2
Y = B0 + BsXs + BmXm
Y = 6 + 1.5 Xs + 1.5 Xm
136
2 - + 7.2 4
3 + - 7.9 1
-
4 + + 8.8 3 3.7 - + 7.9
Sugar
137
2 - + 7.2 4
3 + - 7.9 1
-
4 + + 8.8 3 3.7 - + 7.9
Sugar
138
7.2 8.8
+
Y = B0 + B1X1 + B2X2
Milk
Y = B0 + BsXs + BmXm
Y = 6.9 + 1.45 Xs + 1.1 Xm -
3.7 - Sugar + 7.9
139
7.2 8.8
Y = 6.9 + 1.45 Xs + 1.1 Xm +
For low milk, low sugar
Milk
called interaction or Xs . Xm
Interaction Xs . Xm = (8.8-7.2)-(7.9-3.7)/2 Zero Interaction
6 9
+
Milk
-
3 - Sugar + 6
140
Y = B0 + B1X1 + B2X2
7.2 8.8
Y = B0 + BsXs + BmXm +
Y = 6.9 + 1.45 Xs + 1.1 Xm
Milk
141
Y = 6.9 + 1.45 Xs + 1.1 Xm – 0.65 Xs . Xm
7.2 8.8
For high (+) sugar high (+) milk +
Y = 6.9 + 1.45 (+1) + 1.1 (+1) – 0.65 (+1).(+1)
Milk
Y = 6.9 + 1.45 + 1.1 – 0.65 = 8.8
-
3.7 - Sugar + 7.9
For high (+) sugar low (-) milk
Y = 6.9 + 1.45 (+1) + 1.1 (-1) – 0.65 (+1).(-1)
Y = 6.9 + 1.45 - 1.1 + 0.65 = 7.9
142
4C.
Supplier
Corrective and
Preventive Action 01 Root Cause Analysis Tools
and Methods
143
Topics Covered
144
Topics Covered
145
Corrective Action
146
147
Corrective Action – Key Steps
Identify the problem
Contain the problem,
Determine the causes of the problem,
Propose solutions to eliminate them or
prevent their recurrence
Verify that the solutions are
implemented
Confirm their effectiveness.
Corrective Action
148
Topics Covered
149
Preventive Action
Action to eliminate the cause of a
potential nonconformity or other
potential undesirable situation
There can be more than one cause for a
potential nonconformity.
Preventive action is taken to prevent
occurrence whereas corrective action is
taken to prevent recurrence.
Preventive Action
150
Identifying Preventive Action
Track data trends and patterns
Use Failure Mode and Effects Analysis
(FMEA)
Review product and process monitoring
reports
Study the process to identify potential
failures, defects, or deficiencies
Preventive Action
151
Preventive Action
152
Topics Covered
153
Process / Failure Mode Failure Severity Cause(s) of Occurrence Current Detection R Recommende
Requirement Effect (1-10) failure mode (1-10) Controls (1-10) P d actions
(KPIVs) N
Perfume (1-10) • Unclear (1-10) • Review and 4 96
Making • Inconsistent specificatio 3 approve
quality 8 n specification
• Receiving • Wrong by design
ingredients
• Substandard 6 • Third party 4 192
material certification
supplied by • In house test
supplier lab
• Mixing
(FMEA)
154
CM
155
Topics Covered
156
Design Change
157
Design Change
158
Topics Covered
159
10. Capability Studies
LSL LCL UCL USL
Voice of Customer:
LSL – Lower Specification Limit
USL - Upper Specification Limit Distribution Plot
Normal, Mean=150, StDev=1
1.000
0.4
Voice of Process:
0.3
Density
LCL – Lower Control Limit 0.2
0.0
145 150 155
X
160
Control Limits vs
Specification Limits
Control
Charts
161
Control Chart
107.44
108.00
107.00
106.00 UCL
X-Bar: Shot 11 - Shot 13
105.00 8
104.00
103.00
101.71
102.00
101.00
100.00
99.00
98.00
97.00
96.00
LCL 95.98
95.00
162
Data Type
# Pieces # Occurrences
# Defectives # Defects
n is subgroup size
163
Data Type
# Pieces # Occurrences
# Defectives # Defects
n is subgroup size
164
# Pieces
# Defectives
Charts for #
Constant Variable
np chart p chart
Defectives Slide 165
165
np Chart
10.931
12
10
NP - Defectives
8
6 4.680
4
2
0.000
0
166
p Chart
Unequal Subgroup size Control Limits
Control limits change with the number of items
in the subgroup (subgroup size)
Larger Subgroup – narrow control limits
Smaller Subgroup – wider control limits
0.100
P - Unplanned Return
0.080
0.053
0.060
0.040
0.021
0.020
0.000
0.000
167
Data Type
# Pieces # Occurrences
# Defectives # Defects
n is subgroup size
168
Charts for # of Defects
# Occurrences
# Defects
Charts for #
Constant Variable
c chart u chart
Defects Slide 169
169
c Chart
Equal Subgroup size Control Limits
Average Defects
20.192
20
C - Defects
15
10.480
10
5
0.768
170
u Chart
Defects per Unit Control Limits
0.200
0.150
U - Defects
0.105
0.100
0.050
0.004
0.000
171
Data Type
# Pieces # Occurrences
# Defectives # Defects
n is subgroup size
172
Variable - Measurements
n>9 n =2 to 9 n=1
Control Charts
for Variable
Data
Xbar - s Xbar - R I-MR/X-MR Slide 173
173
I-MR/X-MR Chart
Individual Control Limits Moving Range Control Limits
174
Xbar – R Chart
Xbar Control Limits Range Control Limits
175
Xbar – s Chart
Xbar Control Limits Std Dev. Control Limits
176
Economically
Un-economical viable to
to eliminate eliminate
177
Rule 1:
One point is more than 3 standard
deviations from the mean.
178
• Nelson Rules
Rule Pattern Probable Cause
1 1 point more than 3 Stdev from CL New person, wrong setup
2 9 (or more) points in a row on same side of CL Setup change, process change, prolonged bias
3 6 (or more) points in a row all increasing or all decreasing Trend, Tool wear
4 14 (or more) points in a row alternating up and down Over control, tempering
5 2 (or 3) out of 3 points more than 2 Stdev from CL (same side) New person, wrong setup
6 4 (or 5) out of 5 points more than 1 Stdev from CL (same side) New person, wrong setup
7 14 points in a row within 1 Stdev from CL (either side) Process change
8 8 points in a row more than 1 Stdev from CL (either side) Process change
179
Rule 2:
Nine (or more) points in a row are on the
same side of the mean.
RUN - When several plotted points line up consecutively on one side of a
Central Line (CL).
180
Rule 3:
Six (or more) points in a row are
continually increasing (or decreasing).
TREND - If there is a continued rise or fall in a series of points
181
Rule 4:
Fourteen (or more) points in a row
alternate in direction, increasing then
decreasing.
182
Rule 5:
Two (or three) out of three points in a row
are more than 2 standard deviations from
the mean in the same direction.
183
Rule 6:
Four (or five) out of five points in a row are
more than 1 standard deviation from the
mean in the same direction.
184
Rule 7:
Fifteen points in a row are all within 1
standard deviation of the mean on either
side of the mean.
HUGGING - When the points on the control chart seem to stick close to
the center line or to a control limit line.
185
Rule 8:
Eight points in a row exist, but none within
1 standard deviation of the mean, and the
points are in both directions from the
mean.
186
Topics Covered
187
Process
Capability
Measures Slide 188
188
Voice of Process:
LCL – Lower Control Limit
UCL - Upper Control Limit
Process
Capability
Measures Slide 189
189
Process Capability
Conditions to be met:
Sample to represent the
population
Normal distribution of data
The process must be in statistical
control
Sample size must be sufficient
Process
Capability
Measures Slide 190
190
σ within σ overall
Short term standard deviation Long term standard deviation
It should not be influenced by
changes to process inputs, such as
tool wear or different lots of
material.
𝑅 ∑ 𝑥 − 𝑥̅
𝜎 = 𝜎𝒐𝒗𝒆𝒓𝒂𝒍𝒍 =
𝑑 𝑛−1
For Cp, Cpk use Short-term sd For Pp, Ppk use Long-term sd
191
Calculating Cp
An engineer wants to assess the capability of a
process that coats large rolls of paper with a thin
film. The engineer collects three measurements of
coating thickness from 25 consecutive rolls. The film
thickness must be 50 ± 3 microns to meet
engineering specifications.
192
Calculating Cp
𝑈𝑆𝐿 − 𝐿𝑆𝐿
𝐶 =
6×𝜎
53 − 47
𝐶 =
6 × 0.40608
𝐶 = 2.46
193
𝐶 =
Process Mean − 𝐿𝑆𝐿 Calculating Cpk
3×𝜎
𝑈𝑆𝐿 − Process Mea𝑛
𝐶 =
3×𝜎
49.8829 − 47 53 − 49.8829
𝐶 = 𝐶 =
3 × 0.40608 3 × 0.40608
𝐶 = 2.366 𝐶 = 2.558
Cpk = 2.366
194
Cpk = 0.92
195
σ within σ overall
Short term standard deviation Long term standard deviation
It should not be influenced by
changes to process inputs, such as
tool wear or different lots of
material.
𝑅 ∑ 𝑥 − 𝑥̅
𝜎 = 𝜎𝒐𝒗𝒆𝒓𝒂𝒍𝒍 =
𝑑 𝑛−1
For Cp, Cpk use Short-term sd For Pp, Ppk use Long-term sd
196
47 48 49 50 51 52 53
Cpk = Min (CpU, CpL ) Ppk = Min (PpU, PpL )
Performance
Observed Expected Overall Expected Within
PPM < LSL 0.00 292.72 0.00
PPM > USL 0.00 100.61 0.00
Process Capability PPM Total 0.00 393.34 0.00 Process Performance
Potential capability Overall capability
197