Vishweshwarayya Abhiyantriki Padvika Mahavidhyalay Almala

Shri Vishweshwar Shikshan Prasarak Mandal’s


Vishweshwarayya Abhiyantriki Padvika Mahavidyalaya
Dilip Nagar, AlmalaTq. Ausa Dist. Latur - 413556 (M.S.)
Approved by AICTE, New Delhi and DTE Mumbai, Affiliated to MSBTE Mumbai.

Assignment No.1
WORK STUDY (METHOD STUDY AND WORK
MEASUREMENT) (12 MARKS)
Q.1 Define Method Study. State Its Objectives.
Q.2 Write Down Basic Steps In Method Study
Q.3 Explain In Brief Different "Recording Techniques" Used In Method Study
Q.4 Define Process Chart .Draw The Symbols Used In Process Chart
Q.5 List Time Study Equipment .Explain Any Two Of Them.
Q.6 Explain In Detail The Procedure For Calculation Of Standard Time.
Q.7 Explain In Brief Allowance To Be Considered While Estimating The Standard
Time.
Q.8 Outline An Appropriate Process Chart For The Activity "Replace Old Battery
Of Car
Q.9 Define the following terms:-
a) Standard Time b) Basic Time c) Rating d) Allowance e) Work Measurement.
Q.10 Explain Multiple Activity Chart with proper example.
Q.11 Explain string diagram with neat sketch.
Q.12 State the techniques of micro motion study.
Q.13 Draw Any six Therbligs and state their meaning.
Q.14 State and explain principles of motion economy.
Q.15 The worker in a company are expected to work for 410 minutes in a shift and
8 hrs. The remaining time is allowed for personal needs etc. determine the standard
time per piece of a job whose normal time is 3 minutes.
Q.16 A particular activity on the shop floor consists of three elements. Calculate
the standard time for the activity. The various allowances are given as percentage
of normal time.
Course and course code :- Theory of Machine ( 22438) Program:- Mechanical EngineeringPage 1
Vishweshwarayya Abhiyantriki Padvika Mahavidhyalay Almala

Elements I II III
Observed time (min) 1.10 0.20 0.50
Rating Factor (%) 80 90 85
Allowances (%)
Relaxation 10 11 12
Delay 4 3 2
Personal 5 8 6

Q.17 A worker takes 15 minutes as a standard time for a job in which total
allowance is 20 % of normal time . if the rating of worker is 105% find the actual
time required by the worker

Note: Solve More similar example .

Course and course code :- Theory of Machine ( 22438) Program:- Mechanical EngineeringPage 2
Vishweshwarayya Abhiyantriki Padvika Mahavidhyalay Almala

Shri Vishweshwar Shikshan Prasarak Mandal’s


Vishweshwarayya Abhiyantriki Padvika Mahavidyalaya
Dilip Nagar, AlmalaTq. Ausa Dist. Latur - 413556 (M.S.)
Approved by AICTE, New Delhi and DTE Mumbai, Affiliated to MSBTE Mumbai.

Assignment No.2
Process Engineering (12 MARKS)
Q.1 Define process planning ? state its significance.
Q.2 Explain steps for planning process for a product from raw material to finished
product in an industry.
Q.3 State and explain various factors affecting process planning.
Q.4 Explain production system with block diagram . also give two examples.
Q.5 State and explain how the different operation can be combined.
Q.6 Explain the concept of line balancing . state its importance and objectives.
Q.7 State the information required to do process planning.
Q.8) Explain the objectives and function of Supply Chain Management
Q.9) State the factors of production? Explain any two factors of production.
Q.10 Explain the process operation sheet and is contents?
Q.11 Explain Preliminary Part Print Analysis.
Q.12 Define the following terms:-
a) Working Drawing b) Combined Operation c) Event d) Acivity d) Supply
Chain Management e) Critical Path f) Float g) Earliest start time (EST) h) Latest
finish time (LFT)
Q.13 From the activities given below:
i) Construct the network
ii) Find out the critical path. Calculate project duration.

Course and course code :- Theory of Machine ( 22438) Program:- Mechanical EngineeringPage 3
Vishweshwarayya Abhiyantriki Padvika Mahavidhyalay Almala

Operation Pre-operation Dutration (Days)


A __ 2
B A 3
C A 3
D B 4
E C 3
F E,D 4

Q.14 Draw the network diagram for the project in which pre-operation and post
operation are shown below.

Operation Pre-operation Post Operation


A __ C
B __ D
C A E
D B E
E C,D __