RESULTS
ENGINE: GOOD CONDITION FAIR CONDITION POOR CONDITION
COMMENTS:
COMMENTS:
COMMENTS:
COMMENTS:
630989025.xlsx
CAT 320D2 TECHNICAL ANALYSIS INSPECTION LEVEL 2
Attention!
This TA2 inspection is for testing purposes ONLY! Testing
sheets must be completed in full before any additional task is
carried out. Faults or defects found during testing and
inspection are not to be repaired, technician will record on
the TA2 inspection sheets with comments. Completed TA2
inspections that have machine defects will be given to the
customers workshop supervisor for approval and creation of
new W/O's. No adjustment or repair is to be done by
PT. Karunia Tunggal Lestari without customer approval
and new customer W/O. Valve adjustments are not part of the
TA2 inspection, they are to be carried out on a separate
customer W/O
`
ENGINE PERFORMANCE
Note* Engine Coolant Temp must be above 85 Degrees Celsius while testing
630989025.xlsx
ENGINE PERFORMANCE
Note* Engine Coolant Temp must be above 85 Degrees Celsius while testing
OPERATOINAL CHECK
Note : Travel Time for 25 m (82.0 ft) (Time in Seconds) First 5 m (16.4ft) is preliminary. Measure Travel for Remaining 20 m (65.6 ft)
630989025.xlsx
Swing Speed and Over Swing On Level Ground - Check
630989025.xlsx
Cylinder Speed Check
Swing Relief Valve (Left) 26000 ± 1000 kPa ( 3370 ± 145 psi)
Swing Relief Valve (Right) 26000 ± 1000 kPa ( 3370 ± 145 psi)
630989025.xlsx
630989025.xlsx
Relief Valve ( Cross Over ) -Test
Specification Comments /
DESCRIPTION Actual Adjusted To
Repairs
S.O.S
DESCRIPTION Obtain comments
3406C
VALVE SETTING
No 1 Piston Inlet Exhaust
Specifiation
inlet
exhaust
Cylinder 1
Cylinder 2
Cylinder 3
Cylinder 4
Cylinder 5
Cylinder 6
Intake CYL 1 C C CYL 4 CYL 5 CYL 6
Valves YL Y
2 L
3