SWIFT - Reservoir Souring Control Action Item - Aug13-21 R2
SWIFT - Reservoir Souring Control Action Item - Aug13-21 R2
Section SWIFT
(Asset Name) Reservoir Souring Control Action Item Reviewed by KPT/LBH/MAS/IIM
Date Aug13-21
Subsection No. Task Description Assigned To: Support From: Estimated Start Estimated Finish % Completion
1 Background: Produced Water from Op's with high WC% and H2S
• Root cause (Increased H2S in the production system due to produced water being mixed with treated seawater into reservoir)
SAM KUEH Aug-21 Sep-21
• Impact (Serious operational problem - such as reservoir souring, increase corrosion at production facilities, HSE etc.,)
2 Produced Water
Subsurface
• Wells list with (Severe/Mild/No H2S) categorization with total well count (Active/Idle); Producing Zones (Commingle/Not Commingle); Well Test and BS&W Validation
• Issue - Produced water contains H2S without a proper removal facilities (H2S Scavenger & Scrubber) prior to flowing into the Test Separator (H2S Measurement)
SAM KUEH Aug-21 Sep-21
• Impact - Production decline, reservoir permeability degradation,etc.,
• Threat - Cost, Mechanical/Reservoir Chance of Success (RCOS/MCOS) - Low/Medium/high, Well Shut-off (Mechanical/Chemical/Others)
• Remedial Action Plan - Inspection on seal, choke, cost efficient chemical inhibitor?
• Issue - Signs of surface defect, corrosion and multiple leaks, unsuitable material in place to cater H2S
• Remedial Action Plan - Perform pipeline integrity test (UT, Xray, PT), replace gasket if joint leak and do pressure leak test
• Issue - Handling of H2S issue, equipment reliability, preventive maintenance inplace (frequency), process and rotating equipment
• Remedial Action Plan - Hydrogen Sulfide Removal (H2S Scavenger and Scrubber)/Laboratory Analysis Report/ Improve Process P&ID/ Improve SOP to BOL H2S producing well with Bean-up procedure etc.,)