Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

GEW-STR-F03 | 00 Page No- 1

Galadari Engineering Works Ltd. Co. (L.L.C)


Fabrication Division.
P.O. Box : 355, Dubai, U.A.E. Tel.: 3472855, 2660936, 2663880, Fax : 3472692
E-Mail:gew@galadarieng.com
DELIVERY NOTE
No. 1660047 Date 30.11.2022

Project No: 15416 PO NO : ………….


Project Address :
Name JSW CEMENT- CLINKER PLANT Fujairah Works, JSW Cement FZE
P.O. Box 50492, Plot No-10 Block A,
Customer's
AL AWAEL BUILDING CONTG. LLC AL Banah , AL Tawain,
Name:
Fujairah (U.A.E.)
Delivered
DIC Delivered To :- Fujairah Vehicle No : 31742
from:
Assembly No. (ErectionMark Quantity Unit Total
S.No Description Profile Length Remark
No.) (Nos) Weight(Kgs.) Weight(Kgs.)

1 DPC(17)-GF3 1 GALLERY FRAME HEA240 13789 8192.92 8192.92


VERTICAL
2 DPC(17)-VF13 1 HEB340 5584 2387.42 2387.42
FRAME
3 DCP(17)-1GF3 1 GALLERY UPN200 36618 4676.02 4676.02

4 DCP(17)-2GF2 1 GALLERY UPN200 3651 452.62 452.62

5 DCP(17)-PF1 1 PLATFORM HEA240 5012 2445.10 2445.10

6 DCP(17)-PF2 1 PLATFORM HEA240 5058 2451.05 2451.05

7 CUS(2a)-B16 1 BEAM HEA300 14300 1219.53 1219.53

8 CUS(2a)-B17 1 BEAM HEA300 13506 1162.19 1162.19

9 CUS(2a)-B13 1 BEAM HEB300 6000 677.84 677.84

10 CUS(2a)-B27 1 BEAM HEB300 6000 679.25 679.25

11 CUS(2a)-B40 1 BEAM HEB300 6000 666.59 666.59

11 25010.5
Delivery authorized by Received above items in good condition

Name & Signature Customer's Signature & Stamp

Note : In the event of any complaint/ discrepancy ,written information must be given within 48 hours of receipt material
GEW-STR-F03 | 00 Page No- 1

Galadari Engineering Works Ltd. Co. (L.L.C)


Fabrication Division.
P.O. Box : 355, Dubai, U.A.E. Tel.: 3472855, 2660936, 2663880, Fax : 3472692
E-Mail:gew@galadarieng.com
DELIVERY NOTE
No. 1660048 Date 30.11.2022

Project No: 15416 PO NO : ………….


Project Address :
Name JSW CEMENT- CLINKER PLANT Fujairah Works, JSW Cement FZE
P.O. Box 50492, Plot No-10 Block A,
Customer's
AL AWAEL BUILDING CONTG. LLC AL Banah , AL Tawain,
Name:
Fujairah (U.A.E.)
Delivered
DIC Delivered To :- Fujairah Vehicle No : 95187
from:
Assembly No. (ErectionMark Quantity Unit Total
S.No Description Profile Length Remark
No.) (Nos) Weight(Kgs.) Weight(Kgs.)

1 DCP(17)-1PU4 1 PURLIN UNP120 1723 21.76 21.76

2 DCP(17)-1PU10 1 PURLIN UNP120 1890 23.56 23.56

3 DCP(17)-1PU20 1 PURLIN UNP120 1722 21.76 21.76

4 DCP(17)-1PU27 1 PURLIN UNP120 2796 36.44 36.44

5 DCP(17)-1PU28 1 PURLIN UNP120 2610 33.97 33.97

6 DCP(17)-2PU2 1 PURLIN UNP120 1800 22.75 22.75

7 DCP(17)-2PU3 1 PURLIN UNP120 2696 35.11 35.11

8 DCP(17)-2PU8 1 PURLIN UNP120 2696 35.12 35.12

9 DCP(17)-2SR6 1 SIDE UNP120 2698 35.52 35.52

10 DCP(17)-2SR13 2 SIDE UNP120 927 12.10 24.20


MONORAIL
11 TT5(2b)-MR1 1 BEAM UB356*171*57 4900 275.66 275.66
MONORAIL
12 TT5(2b)-MR3 1 BEAM UB356*171*57 1900 106.89 106.89

13 RKP(12)-B107 1 BEAM UB406*178*54 2975 169.02 169.02

14 RKP(12)-B108 1 BEAM UB406*178*54 2975 169.20 169.20

15 RKP(12)-B116 1 BEAM UB305*165*46 2992 153.81 153.81

16 1164.8
Delivery authorized by Received above items in good condition

Name & Signature Customer's Signature & Stamp

Note : In the event of any complaint/ discrepancy ,written information must be given within 48 hours of receipt material
GEW-STR-F03 | 00 Page No- 2

Galadari Engineering Works Ltd. Co. (L.L.C)


Fabrication Division.
P.O. Box : 355, Dubai, U.A.E. Tel.: 3472855, 2660936, 2663880, Fax : 3472692
E-Mail:gew@galadarieng.com
DELIVERY NOTE
No. 1660048 Date 30.11.2022

Project No: 15416 PO NO : ………….


Project Address :
Name JSW CEMENT- CLINKER PLANT Fujairah Works, JSW Cement FZE
P.O. Box 50492, Plot No-10 Block A,
Customer's
AL AWAEL BUILDING CONTG. LLC AL Banah , AL Tawain,
Name:
Fujairah (U.A.E.)
Delivered
DIC Delivered To :- Fujairah Vehicle No : 95187
from:
Assembly No. (ErectionMark Quantity Unit Total
S.No Description Profile Length Remark
No.) (Nos) Weight(Kgs.) Weight(Kgs.)

16 RKP(12)-C111 1 COLUMN UPN200 6916 526.52 526.52


MONORAIL
17 RKP(12)-MR101 1 UB457*152*67 4300 288.88 288.88
BEAM
MONORAIL
18 RKP(12)-MR102 1 UB457*152*67 2850 190.95 190.95
BEAM
19 CCL(13a)-STR1 1 STRINGER UNP200 4268 118.79 118.79

20 CCL(13a)-STR3 1 STRINGER UNP200 5111 147.49 147.49

21 CCL(13a)-STR4 1 STRINGER UNP200 5111 147.49 147.49

22 CCL(13a)-STR5 1 STRINGER UNP200 5113 147.12 147.12

23 CCL(13a)-STR8 1 STRINGER UNP200 4907 141.84 141.84

24 CCL(13a)-STR9 1 STRINGER UNP200 5005 145.78 145.78

25 L11BC1(2c))-B4 1 BEAM UB203*133*25 4090 114.82 114.82

26 L11BC1(2c))-B25 1 BEAM UPN180 2122 48.23 48.23

27 L11BC1(2c))-B26 1 BEAM UPN180 2122 48.23 48.23

28 L11BC1(2c))-B29 1 BEAM UB305*165*46 4987 250.14 250.14

29 L11BC1(2c))-B31 1 BEAM UB305*165*46 4987 250.20 250.20

30 L11BC1(2c))-B55 1 BEAM UB203*133*25 4089 112.57 112.57

15 2679.1
Delivery authorized by Received above items in good condition

Name & Signature Customer's Signature & Stamp

Note : In the event of any complaint/ discrepancy ,written information must be given within 48 hours of receipt material
GEW-STR-F03 | 00 Page No- 3

Galadari Engineering Works Ltd. Co. (L.L.C)


Fabrication Division.
P.O. Box : 355, Dubai, U.A.E. Tel.: 3472855, 2660936, 2663880, Fax : 3472692
E-Mail:gew@galadarieng.com
DELIVERY NOTE
No. 1660048 Date 30.11.2022

Project No: 15416 PO NO : ………….


Project Address :
Name JSW CEMENT- CLINKER PLANT Fujairah Works, JSW Cement FZE
P.O. Box 50492, Plot No-10 Block A,
Customer's
AL AWAEL BUILDING CONTG. LLC AL Banah , AL Tawain,
Name:
Fujairah (U.A.E.)
Delivered
DIC Delivered To :- Fujairah Vehicle No : 95187
from:
Assembly No. (ErectionMark Quantity Unit Total
S.No Description Profile Length Remark
No.) (Nos) Weight(Kgs.) Weight(Kgs.)

31 L11BC1(2c))-B58 1 BEAM UB203*133*25 4086 114.26 114.26

32 L11BC1(2c))-B65 1 BEAM UB203*133*25 4086 121.33 121.33

33 L11BC1(2c))-B71 1 BEAM UPN180 2617 58.97 58.97

34 L11BC1(2c))-B73 1 BEAM UPN180 963 23.44 23.44

35 L11BC1(2c))-B75 9 BEAM UPN180 1161 27.54 247.85

36 L11BC1(2c))-B76 2 BEAM UPN180 961 23.20 46.40

37 L11BC1(2c)-C3 1 COLUMN UC254*254*73 6707 528.43 528.43

38 L11BC1(2c)-C4 1 COLUMN UC254*254*73 6707 528.43 528.43

39 L11BC1(2c)-C5 1 COLUMN UC254*254*73 6707 529.24 529.24

40 L11BC1(2c)-C6 1 COLUMN UC254*254*73 6707 529.24 529.24

41 L21BC1(2c)-B4 1 BEAM UB203*133*25 3588 102.40 102.40

42 L21BC1(2c)-B8 1 BEAM UB203*133*25 3588 101.89 101.89

43 L21BC1(2c)-B23 1 BEAM UB203*133*25 3590 91.68 91.68

44 CUS(2a)-C12 1 COLUMN HEB300 8695 1052.00 1052.00

45 CUS(2a)-C17 1 COLUMN HEB300 6795 815.00 815.00

24 4890.6
Delivery authorized by Received above items in good condition

Name & Signature Customer's Signature & Stamp

Note : In the event of any complaint/ discrepancy ,written information must be given within 48 hours of receipt material
GEW-STR-F03 | 00 Page No- 4

Galadari Engineering Works Ltd. Co. (L.L.C)


Fabrication Division.
P.O. Box : 355, Dubai, U.A.E. Tel.: 3472855, 2660936, 2663880, Fax : 3472692
E-Mail:gew@galadarieng.com
DELIVERY NOTE
No. 1660048 Date 30.11.2022

Project No: 15416 PO NO : ………….


Project Address :
Name JSW CEMENT- CLINKER PLANT Fujairah Works, JSW Cement FZE
P.O. Box 50492, Plot No-10 Block A,
Customer's
AL AWAEL BUILDING CONTG. LLC AL Banah , AL Tawain,
Name:
Fujairah (U.A.E.)
Delivered
DIC Delivered To :- Fujairah Vehicle No : 95187
from:
Assembly No. (ErectionMark Quantity Unit Total
S.No Description Profile Length Remark
No.) (Nos) Weight(Kgs.) Weight(Kgs.)

46 CUS(2a)-C22 1 COLUMN HEB300 6795 827.03 827.03

47 CUS(2a)-C29 1 COLUMN HEB300 6795 819.88 819.88

48 CUS(2a)-MRB1 1 BEAM HEB300 11980 1343.12 1343.12

49 CUS(2a)-MRB2 1 BEAM HEB300 8920 1000.05 1000.05

4 3990.1
Delivery authorized by Received above items in good condition

Name & Signature Customer's Signature & Stamp

Note : In the event of any complaint/ discrepancy ,written information must be given within 48 hours of receipt material

You might also like