Item No. Equipment Rate per Hour
Cost Range
21 Vibratory Pile Driver 926 – 1121
22 Bagger Mixer (1 – 2 bags) 480 – 696
23 Concrete Vibrator 402 – 471
24 Air Compressor – Small 347 – 419
25 Air Compressor – Big 677 – 818
26 Bar Cutter 292 – 321
27 Bar Bender 384 – 422
28 Jack Hammer 309 – 340
29 Tamping Rammer 297 – 331
30 Welding Machine, Portable, 300A 662 – 702
31 Welding Machine, 600A 831 – 1038
32 Generator Set 15-25kVA 452 – 581
33 Generator Set 50kVA 809 – 977
34 Sump Pump (Dewatering), 0.75 – 2HP 199 – 228
35 Sump Pump (Dewatering), 5HP 397 – 456
36 Road Paint Stripper 181 – 192
37 Road Paint Applicator 470 – 603
SCAFFOLDING PRICE
FRAMES
DESCRIPTION MATERIAL DIMENSIONS
CROSS BRACE
DESCRIPTION MATERIAL DIMENSIONS
SCAFFOLDING PIPE
DESCRIPTION MATERIAL DIMENSIONS
PIPE CLAMP
DESCRIPTION MATERIAL DIMENSIONS
STAIR/LADDER
DESCRIPTION MATERIAL DIMENSIONS
ADJUSTABLE U-HEAD
DESCRIPTION MATERIAL DIMENSIONS
TELESCOPIC U-HEAD
DESCRIPTION MATERIAL DIMENSIONS
SHORING JACK
DESCRIPTION MATERIAL DIMENSIONS
ACCESSORIES
DESCRIPTION MATERIAL DIMENSIONS
IONS PRICE
IF PURCHASED MONTHLY RENTAL
1.20 x 1.70 m 425.75 47.3
1.20 x 1.20 m 425.75 47.3
1.20 x 0.90 m 425.75 47.3
1.50 x 1.70 m 467.56 51.95
1.50 x 1.20 m 467.56 51.95
1.50 x 0.90 m 467.56 51.95
1.80 x 1.70 m 549.61 61.06
1.80 x 1.20 m 549.61 61.06
1.80 x 0.90 m 549.61 61.06
IONS PRICE
IF PURCHASED MONTHLY RENTAL
6.0 Meters 2012.64 223.62
5.0 Meters 1677.2 186.35
4.5 Meters 1509.48 167.72
4.0 Meters 1341.76 149.08
3.5 Meters 1174.04 130.44
3.0 Meters 1006.32 111.81
2.5 Meters 838.6 93.17
2.0 Meters 670.88 74.54
1.5 Meter 503.16 55.9
1.2 Meter 402.53 44.72
1.0 Meter 335.44 37.27
IONS PRICE
IF PURCHASED MONTHLY RENTAL
75.27 8.36
190.01 21.11
225.19 25.02
IONS PRICE
IF PURCHASED MONTHLY RENTAL
250 kg Capacity 2822.34 313.59
0.50 x 1.80 m 4752.61 528.06
0.50 x 1.2 m 3529.9 392.21
0.50 x 0.90 m 3135.89 348.43
IONS PRICE
IF PURCHASED MONTHLY RENTAL
400mm 514 57.11
600mm 611.54 67.94
IONS PRICE
IF PURCHASED MONTHLY RENTAL
1.00 m 425.75 47.3
1.20 m 452.07 50.23
1.50 m 483.04 53.67
IONS PRICE
IF PURCHASED MONTHLY RENTAL
400mm 479.94 53.32
600mm 580.57 64.5
IONS PRICE
IF PURCHASED MONTHLY RENTAL
5.5 Tons Capacity 1870.2 207.8
6.8 Tons Capacity 2195.33 243.92
6.2 Tons Capacity 2492.58 276.95
3.7 Tons Capacity 2823.88 313.76
IONS PRICE
IF PURCHASED MONTHLY RENTAL
17.04 1.89
94.44 10.49
53.65 5.96
1393.36 154.81
2167.46 240.82
562.98 62.55
1970.42 218.93
408.17 45.35
422.23 46.91
49.26 5.47
577.05 64.11
56.31 6.25
XCAVATION MAN HOUR - USING AN EXCAVATOR
Note: Operation hours/Manhours includes excavation and loading onto truck/hauler.
Soil Type Excavator Bucket Operation Hours per 100m3 of excavation
Size
Excavator Operator Mechanic
Light 0.75 m3 Bucket 1.84 1.84 1.84
0.5 m3 Bucket 1.97 1.97 1.97
0.3 m3 Bucket 2.62 2.62 2.62
Medium 0.75 m3 Bucket 3.41 3.41 3.41
0.5 m3 Bucket 4.98 4.98 4.98
0.3 m3 Bucket 5.76 5.76 5.76
Heavy 0.75 m3 Bucket 4.58 4.58 4.58
0.5 m3 Bucket 5.24 5.24 5.24
0.3 m3 Bucket 6.41 6.41 6.41
Hard Pan 0.75 m3 Bucket 5.76 5.76 5.76
0.5 m3 Bucket 6.02 6.02 6.02
0.3 m3 Bucket 7.98 7.98 7.98
Rock 0.75 m3 Bucket 5.76 5.76 5.76
0.5 m3 Bucket 6.02 6.02 6.02
0.3 m3 Bucket 7.98 7.98 7.98
REINFORCEMENT
ITEM ACTIVITY / DESCRIPTION SIZE / DIMENSION REMAR UNIT
NO. KS
0.08 0 Hr /
Piece
0.09 0 Hr /
Piece
0.1 0 Hr /
Piece
0.05 0 Hr /
Linear
Meters
0.06 0 Hr /
Linear
Meters
0.07 0 Hr /
Linear
Meters
0.1 0 Hr /
Linear
Meters
1.00 2.00 Mason Laborer 0.05 0 Hr /
Kilogra
ms
0.03 0 Hr /
Kilogra
ms
0.07 0 Hr /
Kilogra
ms
0.04 0 Hr /
Kilogra
ms
0.01 0 Hr /
Linear
Meters
0.02 0 Hr /
Linear
Meters
0.01 0 Hr /
Linear
Meters
0.02 0 Hr /
Linear
Meters
TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT
0.7 0.53 Hr /
Opening
CONCRETE WORK PRODUCTIVITY RATE
BASE
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
BEAMS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
4
0.25
1
0.375
0.125
0.5
0.125
2 Beams, 745 kg/m 7.5 m span Incld. forms & Cubic 4
rebar Meters
COLUMNS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
4
0.25
0.375
0.125
2 Square Columns, @ 600mm x 600mm (max) Incld. forms & Cubic 0.5
4.2 m high rebar Meters
3 Square Columns, @ 900mm x 900mm (max) Incld. forms & Cubic 0.125
4.2 m high rebar Meters
4 Rectangular 300mm x 1600mm (max) Incld. forms & Cubic 4
Columns, @ 4.2 m rebar Meters
high
5 Round Columns, 300mm Diameter Incld. forms & Cubic 1
Tied, @ 4.2 m high rebar Meters 9
5
0.25
1
0.375
0.125
ELEVATED SLABS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
4
0.25
1
0.375
0.125
4
0.25
1
0.375
0.125
FOUNDATION
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
4
0.25
0.25
0.375
0.125
0.25
0.125
2 Spread Footings ≥ 4.0m3 Incld. forms & Cubic 2
rebar Meters
3 Mat Foundation ≥ 1000m3 Incld. forms & Cubic 0.5
rebar Meters
7
0.25
4
0.5
0.25
0.25
0.25
0.125
4 Mat Foundation ≥ 25 m3 to ≤ 500m3 Incld. forms & Cubic
rebar Meters
5 Mat Foundation ≤ 25m3 Incld. forms & Cubic 2
rebar Meters
WALLS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
0.25
5
0.25
0.125
OTHER WORKS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION
0.25
4
0.25
0.375
0.25
0.125
0.125
0.5
5
0.5
0.375
0.375
0.5
4
6 Retaining walls, 300mm(top) / 600mm Incld. forms, Cubic 0.5
retaining, @ 2.4m (btm) rebar, & footing Meters
high
6 Retaining walls, 300mm(top) / 600mm Incld. forms, Cubic
retaining, @ 2.4m (btm) rebar, & footing Meters
high 10
0.25
5
0.25
0.125
0.625
0.125
4
7 Stairs 300mm wide Incld. forms, Cubic 1
rebar, & finish Meters
8
0.25
0.125
4
0.125
0.125
0.125
0.375
0.125
0.125
4
8 Stairs Landing Incld. forms, Cubic 1
rebar, & finish Meters
10
0.125
4
0.375
0.125
0.5
0.125
4
TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT
Crane
Truck
Power Tools
Mason
Laborer
Equipt. Opt.
Concrete Vibrator
Crane
Truck
Power Tools
Crane
Truck
Power Tools
Crane
Truck
Power Tools
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Concrete Pump &
Trans Mixer
Crane
Truck
Power Tools
Equip. Opt.
Concrete Pump
Concrete Vibrator
Finishing Eqpt
Laborer
Mason
Equip. Opt.
Concrete Vibrator
Concrete Pump
Crane
Truck
Power Tools
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Crane
Truck
Concrete Pump
Power Tools
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Crane
Truck
Power Tools
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Crane
Truck
Concrete Pump
Power Tools
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Concrete Pump
Crane
Power Tools
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Crane
Truck
Power Tools
Steelman
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Concrete Pump
Crane
Truck
Finishing
Equipment
Power Tools
Foreman 12.76 4.02 Hr / Cubic
Meters
Carpenter
&Steelman
Mason
Laborer
Equip. Opt.
Concrete Vibrator
Crane
Truck
Power Tools
REBAR PRODUCTIVITY RATE
REINFORCING BAR
ITEM ACTIVITY / DESCRIPTION SIZE / DIMENSION UNIT TEAM COMPONENTS
NO.
HANDLING OF REBAR
ITEM ACTIVITY / DESCRIPTION UNIT TEAM COMPONENTS AVE. OUTPUT – HOURS
NO.
14 Unloading, handling, & sorting Metric Ton 0.25 Foreman 0.76
steel reinforcement
4 Steelman
2 Laborer /
Helper
0.5 Equipment
Operator
Eqpt. Op.
Oiler
0.5 Crane
0.5 Low Bed
Truck
0.5
STEEL DOWELS
ITEM ACTIVITY / DESCRIPTION SIZE / UNIT TEAM COMPONENTS
NO. DIMENSION
15 Steel Dowels, 600mm Long 10 mm Piece 0.125 Foreman
SPLICING OF REBAR
ITEM ACTIVITY / DESCRIPTION SIZE / UNIT TEAM COMPONENTS
NO. DIMENSION
23 Buttweld column bar splice 35 mm Piece 1 Foreman
0.07 0 Hr / Piece
0.09 0 Hr / Piece
0.1 0 Hr / Piece
0.09 0 Hr / Kilogram
0.26 0 Hr / Piece
0.31 0 Hr / Piece
0.34 0 Hr / Piece
0.04 0 Hr / Piece