LABOR COST

RATE PER DAY


PHILIPPINES CONSTRUCTION LABOR RATES
Item No. Position Manila Rate per day Provincial Rate per day
Cost Range Cost Range
1 Foreman 650 – 815 520 – 800
2 Fitter 530 – 555 450 – 540
3 Welder 535 – 550 430 – 535
4 Electrician 530 – 560 390 – 510
5 Carpenter 535 – 540 400 – 450
6 Painter 520 – 550 390 – 440
7 Mason 512 – 535 380 – 450
8 Driver 500 – 540 350 – 450
9 Eqpt Operator 530 – 550 400 – 450
10 Helper 512 – 520 280 – 430

RATE PER HOUR


PHILIPPINES CONSTRUCTION LABOR RATES
Item No. Position Manila Rate per Hr Provincial Rate per Hr
Cost Range Cost Range
1 Foreman 81.25 – 101.875 65 – 100
2 Fitter 66.25 – 69.375 56.25 – 67.5
3 Welder 66.875 – 68.75 53.75 – 66.875
4 Electrician 66.25 – 70 48.75 – 63.75
5 Carpenter 66.875 – 67.5 50 – 56.25
6 Painter 65 – 68.75 48.75 – 55
7 Mason 64 – 66.875 47.5 – 56.25
8 Driver 62.5 – 67.5 43.75 – 56.25
9 Eqpt Operator 66.25 – 68.75 50 – 56.25
10 Helper 64 – 65 35 – 53.75
CONSTRUCTION RENTAL RATES
MAIN EQUIPMENT
PHILIPPINES CONSTRUCTION EQUIPMENT RATES

Item No. Equipment Rate per Hour


Cost Range
1 Crawler Loader (80kW / 1.5 – 2.0 cu.m) 2830 – 3670
2 Crawler Dozer (125kW) 3220 – 4850
3 Wheel Loader (2.0 – 3.0 cu.m) 2810 – 4200
4 Backhoe Crawler (0.75 – 1.0 cu.m) 2420 – 3560
5 Backhoe / Pavement Breaker (1.5 cu.m) 4110 – 5240
6 Motor Grader ( 90 – 100 kW) 2120 – 2670
7 Pneumatic Tire Roller ( 20 – 24 MT) 2740 – 3360
8 Vibratory Drum Roller ( 10 – 14 MT) 2700 – 3150
9 Dump Truck ( 8.0 – 12.0 cu.m) 1650 – 2100
10 Cargo Truck Small (5 – 8 MT) 1230 – 1460
11 Cargo Truck Small (10 – 15 MT) 1550 – 1910
12 Transit Mixer (5.0 -8.0 cu.m) 1830 – 2430
13 Concrete Batching Plant (80 – 100 cu.m/hr) 3250 – 5230
14 Concrete Trimmer/Slipform Paver (1 meter width) 4250 – 4820
15 Asphalt Distributor Truck (2500 – 3500 Gallons) 1700 – 2340
16 Asphalt Finisher (3 meter width) 2730 – 3090
17 Truck with Boom, small (6-10 MT) 1450 – 1760
18 Truck with Boom, small (12 – 15 MT) 1860 – 2450
19 Crawler Crane (21-25 MT) 2780 – 3560
20 Diesel Pile Hammer 1915 – 2369

SUPPORT EQUIPMENT
Item No. Equipment Rate per Hour
Cost Range
21 Vibratory Pile Driver 926 – 1121
22 Bagger Mixer (1 – 2 bags) 480 – 696
23 Concrete Vibrator 402 – 471
24 Air Compressor – Small 347 – 419
25 Air Compressor – Big 677 – 818
26 Bar Cutter 292 – 321
27 Bar Bender 384 – 422
28 Jack Hammer 309 – 340
29 Tamping Rammer 297 – 331
30 Welding Machine, Portable, 300A 662 – 702
31 Welding Machine, 600A 831 – 1038
32 Generator Set 15-25kVA 452 – 581
33 Generator Set 50kVA 809 – 977
34 Sump Pump (Dewatering), 0.75 – 2HP 199 – 228
35 Sump Pump (Dewatering), 5HP 397 – 456
36 Road Paint Stripper 181 – 192
37 Road Paint Applicator 470 – 603
SCAFFOLDING PRICE
FRAMES
DESCRIPTION MATERIAL DIMENSIONS

A-Frame, Black Iron Pipe 1.70m x 1.20m, Sch.20


H-Frame, Black Iron Pipe 1.70m x 1.20m, Sch.20
E-Frame, Black Iron Pipe 1.20m x 1.20m, Sch.20
E-Frame, Black Iron Pipe 0.90m x 1.20m, Sch.20

CROSS BRACE
DESCRIPTION MATERIAL DIMENSIONS

Cross Brace, Galvanized, Short Type 1.20 m x 1.70 m, Sch.20


Cross Brace, Galvanized, Short Type 1.20 m x 1.20 m, Sch.20
Cross Brace, Galvanized, Short Type 1.20 m x 0.90 m, Sch.20
Cross Brace, Galvanized, Short Type 1.50 m x 1.70 m, Sch.20
Cross Brace, Galvanized, Short Type 1.50 m x 1.20 m, Sch.20
Cross Brace, Galvanized, Short Type 1.50 m x 0.90 m, Sch.20
Cross Brace, Galvanized, Long Type 1.80 m x 1.70 m, Sch.20
Cross Brace, Galvanized, Long Type 1.80 m x 1.20 m, Sch.20
Cross Brace, Galvanized, Long Type 1.80 m x 0.90 m, Sch.20

SCAFFOLDING PIPE
DESCRIPTION MATERIAL DIMENSIONS

Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40


Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40
Scaffolding Galvanized Pipe 1 1/2in (40mm), Sch. 40

PIPE CLAMP
DESCRIPTION MATERIAL DIMENSIONS

Pipe Clamp (Fixed or Swivel) 1-1/2″ x 1-1/2″


Pipe Clamp (Fixed or Swivel) 1-1/2″ x 2″
Pipe Clamp (Fixed or Swivel) 2″ x 2″

STAIR/LADDER
DESCRIPTION MATERIAL DIMENSIONS

Catwalk ( Galvanized ) 500mm x 1800mm


Stair Ladder (3mm Checkered Plate) 500mm x 1800mm
Stair Ladder (3mm Checkered Plate) 500mm x 1200mm
Stair Ladder (3mm Checkered Plate) 500mm x 900mm

ADJUSTABLE U-HEAD
DESCRIPTION MATERIAL DIMENSIONS

Adjustable U-Head 1 1/4in Dia, 100x100x6mm(Base)


Adjustable U-Head 1 1/4in Dia, 100x100x6mm(Base)

TELESCOPIC U-HEAD
DESCRIPTION MATERIAL DIMENSIONS

Telescopic U-Head, B.I. Pipe Sch20 1.00 m


Telescopic U-Head, B.I. Pipe Sch20 1.20 m
Telescopic U-Head, B.I. Pipe Sch20 1.50 m

ADJUSTABLE BASE JACK


DESCRIPTION MATERIAL DIMENSIONS

Adjustable Base Jack 1 1/4in Dia, 100x100x6mm(Base)


Adjustable Base Jack 1 1/4in Dia, 100x100x6mm(Base)

SHORING JACK
DESCRIPTION MATERIAL DIMENSIONS

Shoring Jack 1.70 x 1.50 m (2.80m Full Ext.)


Shoring Jack 2.00 x 2.00 m (3.80m Full Ext.)
Shoring Jack 2.00 x 3.00 m (4.80m Full Ext.)
Shoring Jack 3.00 x 3.00 m (5.60m Full Ext.)

ACCESSORIES
DESCRIPTION MATERIAL DIMENSIONS

Wedge Pin, Galvanized 90mm x 18mm x 4mm


Joint Pin (Expanded – Painted)
Metal Panel Clip
Caster Wheel w/ Brake 200mm Wheel (8 Iinches)
Caster Wheel w/ Brake, Heavy Duty Type 200mm Wheel (8 Iinches)
Stage Support 100mm x 100mm
Stabilizer Leg – Extension
Pipe Clamp (Fixed or Swivel) 1-1/2″ x 1-1/2″
Scaffolding Pipe Coupler Sleeve 1-1/2″ x 1-1/2″
A-Clamp Assembly
Scaffolding Beam Clamp
Shoring Pin
IONS PRICE
IF PURCHASED MONTHLY RENTAL
1.70 x 1.20 m 1647.27 183.03
1.70 x 1.20 m 1478.52 164.28
1.20 x 1.20 m 1257.23 139.69
0.90 x 1.20 m 1022.79 113.64

IONS PRICE
IF PURCHASED MONTHLY RENTAL
1.20 x 1.70 m 425.75 47.3
1.20 x 1.20 m 425.75 47.3
1.20 x 0.90 m 425.75 47.3
1.50 x 1.70 m 467.56 51.95
1.50 x 1.20 m 467.56 51.95
1.50 x 0.90 m 467.56 51.95
1.80 x 1.70 m 549.61 61.06
1.80 x 1.20 m 549.61 61.06
1.80 x 0.90 m 549.61 61.06

IONS PRICE
IF PURCHASED MONTHLY RENTAL
6.0 Meters 2012.64 223.62
5.0 Meters 1677.2 186.35
4.5 Meters 1509.48 167.72
4.0 Meters 1341.76 149.08
3.5 Meters 1174.04 130.44
3.0 Meters 1006.32 111.81
2.5 Meters 838.6 93.17
2.0 Meters 670.88 74.54
1.5 Meter 503.16 55.9
1.2 Meter 402.53 44.72
1.0 Meter 335.44 37.27
IONS PRICE
IF PURCHASED MONTHLY RENTAL
75.27 8.36
190.01 21.11
225.19 25.02

IONS PRICE
IF PURCHASED MONTHLY RENTAL
250 kg Capacity 2822.34 313.59
0.50 x 1.80 m 4752.61 528.06
0.50 x 1.2 m 3529.9 392.21
0.50 x 0.90 m 3135.89 348.43

IONS PRICE
IF PURCHASED MONTHLY RENTAL
400mm 514 57.11
600mm 611.54 67.94

IONS PRICE
IF PURCHASED MONTHLY RENTAL
1.00 m 425.75 47.3
1.20 m 452.07 50.23
1.50 m 483.04 53.67

IONS PRICE
IF PURCHASED MONTHLY RENTAL
400mm 479.94 53.32
600mm 580.57 64.5

IONS PRICE
IF PURCHASED MONTHLY RENTAL
5.5 Tons Capacity 1870.2 207.8
6.8 Tons Capacity 2195.33 243.92
6.2 Tons Capacity 2492.58 276.95
3.7 Tons Capacity 2823.88 313.76

IONS PRICE
IF PURCHASED MONTHLY RENTAL
17.04 1.89
94.44 10.49
53.65 5.96
1393.36 154.81
2167.46 240.82
562.98 62.55
1970.42 218.93
408.17 45.35
422.23 46.91
49.26 5.47
577.05 64.11
56.31 6.25
XCAVATION MAN HOUR - USING AN EXCAVATOR
Note: Operation hours/Manhours includes excavation and loading onto truck/hauler. 
Soil Type Excavator Bucket Operation Hours per 100m3 of excavation
Size
Excavator Operator Mechanic
Light 0.75 m3 Bucket 1.84 1.84 1.84
0.5 m3 Bucket 1.97 1.97 1.97
0.3 m3 Bucket 2.62 2.62 2.62
Medium 0.75 m3 Bucket 3.41 3.41 3.41
0.5 m3 Bucket 4.98 4.98 4.98
0.3 m3 Bucket 5.76 5.76 5.76
Heavy 0.75 m3 Bucket 4.58 4.58 4.58
0.5 m3 Bucket 5.24 5.24 5.24
0.3 m3 Bucket 6.41 6.41 6.41
Hard Pan 0.75 m3 Bucket 5.76 5.76 5.76
0.5 m3 Bucket 6.02 6.02 6.02
0.3 m3 Bucket 7.98 7.98 7.98
Rock 0.75 m3 Bucket 5.76 5.76 5.76
0.5 m3 Bucket 6.02 6.02 6.02
0.3 m3 Bucket 7.98 7.98 7.98

EXCAVATION MAN HOURS - MANUAL LABOR


Note: Man hours includes excavation and loading onto truck/hauler. 
Soil Type Soil Condition Manhours per one (1) cubic meters of excavation
First Lift 2nd Lift Third Lift
Light Dry 1.4 1.84 1.84
Wet 2.1 1.97 1.97
Medium Dry 2.1 3.41 3.41
Wet 2.8 4.98 4.98
Heavy Dry 3.5 4.58 4.58
Wet 4.2 5.24 5.24
Hard Pan Dry 4.9 5.76 5.76
Wet 5.6 6.02 6.02

DISPOSAL OF HAULED MATERIALS


Note: Driver Manhours will be equal to the operation hour of the Truck / Dump Truck / Hauler
Manhours per 100 cubic meter of hauled materials
Truck Capacity Distance of Hauling Average Speed 10 KPH

Dumptruck Truck Driver Mechanic


2m3 1Km 6.61 6.61 1.24
2Km 9.6 9.6 1.24
3Km 12.42 12.42 1.33
4Km 15.86 15.86 1.33
5Km 18.37 18.37 1.11
3m3 1Km 5.6 5.6 1.05
2Km 8.03 8.03 1.05
3Km 10.71 10.71 1
4Km 13.08 13.08 1
5Km 15.51 15.51 0.65
4m3 1Km 4.76 4.76 0.9
2Km 6.87 6.87 0.9
3Km 9.04 9.04 0.96
4Km 11.1 11.1 1.06
5Km 13.22 13.22 0.9
6m3 1Km 2.78 2.78 0.5
2Km 4.07 4.07 0.5
3Km 5.21 5.21 0.55
4Km 6.54 6.54 0.55
5Km 7.73 7.73 0.65
Laborer
1.84
1.97
2.62
3.41
4.98
5.76
4.58
5.24
6.41
5.76
6.02
7.98
5.76
6.02
7.98

Average Speed 20 KPH

Dumptruck Truck Driver Mechanic


4.63 4.63 1.24
6.17 6.17 1.24
7.62 7.62 1.33
9.25 9.25 1.33
11.23 11.23 1.11
3.92 3.92 1.05
5.16 5.16 1.05
6.54 6.54 1.09
7.73 7.73 1.09
9.17 9.17 0.75
3.33 3.33 0.85
4.39 4.39 0.9
5.5 5.5 0.9
6.56 6.56 0.9
7.83 7.83 0.85
1.99 1.99 0.5
2.58 2.58 0.5
3.23 3.23 0.5
3.77 3.77 0.5
4.46 4.46 0.55
MASONRY PRODUCTIVITY WORK
CONCRETE BLOCKS
TEM NO. ACTIVITY / DESCRIPTION SIZE / DIMENSION REMAR UNIT
KS

1 Concrete Hollow Blocks, tooled 100mm thick Square Meters


joints (2-sides)

2 Concrete Hollow Blocks, tooled 150mm thick Square Meters


joints (2-sides)

3 Concrete Hollow Blocks, tooled 200mm thick Square Meters


joints (2-sides)

4 Concrete Hollow Blocks, tooled 250mm thick Square Meters


joints (2-sides)

5 Concrete Hollow Blocks, tooled 300mm thick Square Meters


joints (2-sides)

6 Concrete Hollow Blocks, No 100mm thick Square Meters


tooled joints (2-sides)

7 Concrete Hollow Blocks, No 150mm thick Square Meters


tooled joints (2-sides)

8 Concrete Hollow Blocks, No 200mm thick Square Meters


tooled joints (2-sides)

9 Concrete Hollow Blocks, No 250mm thick Square Meters


tooled joints (2-sides)

REINFORCEMENT
ITEM ACTIVITY / DESCRIPTION SIZE / DIMENSION REMAR UNIT
NO. KS

1 Anchor bolts w/ nuts and 12mmDiameter, Piece


washer 200mm Length
2 Anchor bolts w/ nuts and 12mmDiameter, Piece
washer 300mm Length
3 Anchor bolts w/ nuts and 16mmDiameter, Piece
washer 300mm Length
4 Anchor bolts w/ nuts and 20mmDiameter, Piece
washer 300mm Length
5 Control Joint (PVC or Rubber) 100mm thick wall Linear Meters

6 Control Joint (PVC or Rubber) 150mm thick wall Linear Meters

7 Control Joint (PVC or Rubber) 200mm thick wall Linear Meters

8 Control Joint (PVC or Rubber) 300mm thick wall Linear Meters

9 Rebar Joint, horizontal ≤ 12mm bars Kilograms


placement

10 Rebar Joint, horizontal 16mm & 20mm bars Kilograms


placement

11 Rebar Joint, vertical placement ≤ 12mm bars Kilograms

12 Rebar Joint, vertical placement 16mm & 20mm bars Kilograms

13 Reinforcing Wire Strip ≤ 150mm Wide Linear Meters

14 Reinforcing Wire Strip ≥150mm & ≤300mm Linear Meters


Wide

15 Cavity Truss ≤ 150mm Wide Linear Meters

16 Cavity Truss ≥150mm & ≤300mm Linear Meters


Wide

GROUTING AND MORTAR


ITEM ACTIVITY / DESCRIPTION SIZE / REMA UNIT
NO. DIMENSION RKS

1 Mortar w/ masonry cement, 1:1:6 Mix (type M) Cubic Meters


field mix

2 Mortar w/ masonry cement, 1:3 Mix (type N) Cubic Meters


field mix

3 Mortar w/ portland cement and 1:1/4:3 Mix (type M) Cubic Meters


lime, field mix

4 Mortar w/ portland cement and 1:1:16 Mix (type N) Cubic Meters


lime, field mix

5 Grouting CHB by Hand 100mm thick Square Meters

6 Grouting CHB by pump 150mm thick Square Meters

7 Grouting CHB by pump 200mm thick Square Meters

8 Grouting CHB by pump 300mm thick Square Meters

9 Grouting cavity walls 50mm Space Square Meters

10 Grouting cavity walls 75mm Space Square Meters

11 Grouting cavity walls 100mm Space Square Meters

12 Grouting cavity walls 150mm Space Square Meters

13 Grouting door frames 900mm x 2100mm Opening

14 Grouting door frames 1800mm x 2100mm Opening


TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


0.25 Foreman 1.17 0.29 Hr /
4 Mason Square
Meters
2 Laborer
0.375 Equip. Opt.
Batch Mixer
0.25 Power Tools 1.32 0.33 Hr /
Square
Meters
Crane 1.56 0.39 Hr /
Square
Meters
0.5 Fork Lift 1.75 0.44 Hr /
Square
Meters
Truck 2.04 0.51 Hr /
Square
Meters
0.125 Lifting Equipment 1.06 0.26 Hr /
Square
Meters
0.125 1.19 0.3 Hr /
Square
Meters
0.125 1.41 0.35 Hr /
Square
Meters
0.5 1.58 0.4 Hr /
Square
Meters

TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


1 Mason 0.07 0 Hr /
Piece
1 Mason

0.08 0 Hr /
Piece
0.09 0 Hr /
Piece
0.1 0 Hr /
Piece
0.05 0 Hr /
Linear
Meters
0.06 0 Hr /
Linear
Meters
0.07 0 Hr /
Linear
Meters
0.1 0 Hr /
Linear
Meters
1.00 2.00 Mason Laborer 0.05 0 Hr /
Kilogra
ms
0.03 0 Hr /
Kilogra
ms
0.07 0 Hr /
Kilogra
ms
0.04 0 Hr /
Kilogra
ms
0.01 0 Hr /
Linear
Meters
0.02 0 Hr /
Linear
Meters
0.01 0 Hr /
Linear
Meters
0.02 0 Hr /
Linear
Meters
TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


0.125 Foreman 4.69 1.5 Hr /
Cubic
Meters
1 Mason 4.69 1.5 Hr /
Cubic
Meters
2 Laborer 4.69 1.5 Hr /
Cubic
Meters
1 Batch Mixer 4.69 1.5 Hr /
Cubic
Meters
1 Mason 0.8 0 Hr /
1 Laborer Square
Meters
1 Mason 0.26 0.19 Hr /
Square
Meters
2 Laborer 0.35 0.26 Hr /
Square
Meters
1 Light Eqpt. Opt. 0.6 0.45 Hr /
Square
Meters
Grouting Pump Set 0.18 0.13 Hr /
Square
Meters
0.26 0.2 Hr /
Square
Meters
1 0.35 0.26 Hr /
Square
Meters
0.52 0.39 Hr /
Square
Meters
0.49 0.37 Hr /
Opening

0.7 0.53 Hr /
Opening
CONCRETE WORK PRODUCTIVITY RATE
BASE
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Base, granolithic 25 mm x 127mm Incld. forms & Linear 0.125


rebar Meters 2.000
1.000
2 Base, granolithic 25 mm x 127mm (High Incld. forms & Linear
1.000
cove) rebar Meters
1.000

BEAMS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Beams, 745 kg/m 3.0 m span Incld. forms & Cubic 1


rebar Meters 10

4
0.25
1

0.375

0.125

0.5
0.125
2 Beams, 745 kg/m 7.5 m span Incld. forms & Cubic 4
rebar Meters

COLUMNS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Square Columns, @ 300mm x 300mm (max) Incld. forms & Cubic 1


4.2 m high rebar Meters
1 Square Columns, @ 300mm x 300mm (max) Incld. forms & Cubic
4.2 m high rebar Meters
10

4
0.25

0.375

0.125

2 Square Columns, @ 600mm x 600mm (max) Incld. forms & Cubic 0.5
4.2 m high rebar Meters
3 Square Columns, @ 900mm x 900mm (max) Incld. forms & Cubic 0.125
4.2 m high rebar Meters
4 Rectangular 300mm x 1600mm (max) Incld. forms & Cubic 4
Columns, @ 4.2 m rebar Meters
high
5 Round Columns, 300mm Diameter Incld. forms & Cubic 1
Tied, @ 4.2 m high rebar Meters 9

5
0.25
1

0.375

0.125

6 Round Columns, 600mm Diameter Incld. forms & Cubic 0.5


Tied, @ 4.2 m high rebar Meters
7 Round Columns, 900mm Diameter Incld. forms & Cubic 0.125
Tied, @ 4.2 m high rebar Meters
8 Max Rebar, Round 900mm Diameter Incld. forms & Cubic 2
Columns, Tied, @ rebar Meters
4.2 m high

ELEVATED SLABS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Elevated Flat Slabs, 6.0m Span Incld. forms, Cubic 1


Suspended, @ rebar, & finish Meters
600kg/m2 10

4
0.25
1

0.375

0.125

2 Elevated Flat Slabs, 8.4m Span Incld. forms, Cubic 0.5


Suspended, @ rebar, & finish Meters
3 600kg/m2
Elevated Flat Slabs, 4.6m Span Incld. forms, Cubic 0.125
Suspended, @ rebar, & finish Meters
600kg/m2
4 Elevated Flat Slabs, 7.4m Span Incld. forms, Cubic 4
Suspended, @ rebar, & finish Meters
600kg/m2
5 Elevated Waffle 6.0m Span Incld. forms, Cubic 1
Slabs, Suspended, rebar, & finish Meters
@ 600 kg/m2 10

4
0.25

1
0.375

0.125

6 Elevated Waffle 9.2m Span Incld. forms, Cubic


Slabs, Suspended, rebar, & finish Meters
@ 600 kg/m2
7 Elevated Joist Slab, 4.6m Span , 762 Pans Incld. forms, Cubic
Suspended, @ 600 rebar, & finish Meters
kg/m2
8 Elevated Joist Slab, 7.2m Span, 762 Pans Incld. forms, Cubic 0.5
Suspended, @ 600 rebar, & finish Meters
kg/m2
9 Elevated one way 7.6m Span Incld. forms, Cubic 0.125
beam, Suspended, rebar, & finish Meters
@ 600 kg/m2
10 Elevated two way 7.6m Span Incld. forms, Cubic 4
beam, Suspended, rebar, & finish Meters
11 @ 600 kg/m2
Elevated slabs 150mm Thick Incld. forms, Square 0.5
(concreting & finish rebar, & finish Meters
only) 6
2
2

12 Elevated slabs 64 mm Thick Floor Incld. forms, Square 2


(concreting & finish rebar, & finish Meters
only)

FOUNDATION
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Spread Footings ≤ 0.75m3 Incld. forms, Cubic 1


rebar, & finish Meters
1 Spread Footings ≤ 0.75m3 Incld. forms, Cubic
rebar, & finish Meters
5

4
0.25

0.25

0.375

0.125

0.25
0.125
2 Spread Footings ≥ 4.0m3 Incld. forms & Cubic 2
rebar Meters
3 Mat Foundation ≥ 1000m3 Incld. forms & Cubic 0.5
rebar Meters
7

0.25
4

0.5

0.25

0.25

0.25
0.125
4 Mat Foundation ≥ 25 m3 to ≤ 500m3 Incld. forms & Cubic
rebar Meters
5 Mat Foundation ≤ 25m3 Incld. forms & Cubic 2
rebar Meters
WALLS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Grade Walls,@ 200mm thick Incld. forms & Cubic 0.5


2.4m High rebar Meters
10

0.25
5

0.25

0.125

2 Grade Walls,@ 200mm thick Incld. forms & Cubic


4.2m High rebar Meters
3 Grade Walls,@ 300mm thick Incld. forms & Cubic 0.625
4.2m High rebar Meters
4 Grade Walls,@ 400mm thick Incld. forms & Cubic 0.125
3.6m High rebar Meters
5 Grade Walls,@ 400mm thick Incld. forms & Cubic 4
5.5m High rebar Meters

OTHER WORKS
ITEM ACTIVITY / SIZE / DIMENSION REMARKS UNIT TEAM COMPONENTS
NO. DESCRIPTION

1 Handicap Ramp, 1.50 m Wide Incld. forms, Cubic


1.5m Wide rebar, & finish Meters
2 Roof Deck, screed Not incld. forms Cubic
finish & rebar Meters
3 Pile Caps, square / ≥ 07.5m3 Incld. forms & Cubic 1
rectangular rebar Meters
5

0.25
4

0.25

0.375

0.25

0.125

0.125

4 Pile Caps, ≥ 0.75m3 Incld. forms & Cubic 2


triangualar / rebar Meters
hexagonal
5 Retaining walls, 200mm(top) / 600mm Incld. forms & Cubic 1
gravity, @ 1.2m (btm) rebar Meters
high 9

0.5
5
0.5

0.375

0.375

0.5
4
6 Retaining walls, 300mm(top) / 600mm Incld. forms, Cubic 0.5
retaining, @ 2.4m (btm) rebar, & footing Meters
high
6 Retaining walls, 300mm(top) / 600mm Incld. forms, Cubic
retaining, @ 2.4m (btm) rebar, & footing Meters
high 10

0.25
5

0.25

0.125

0.625
0.125
4
7 Stairs 300mm wide Incld. forms, Cubic 1
rebar, & finish Meters
8

0.25

0.125
4
0.125

0.125

0.125

0.375
0.125
0.125
4
8 Stairs Landing Incld. forms, Cubic 1
rebar, & finish Meters
10

0.125
4

0.375

0.125

0.5
0.125
4
TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


Foreman Mason 0.57 0.22 Hr / Linear
Carpenter Meters
Steelman Laborer
0.77 0.3 Hr / Linear
Finishing Eqpt
Meters

TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


Foreman 27.3 8.61 Hr / Cubic
Carpenter Meters
&Steelman
Mason
Laborer
Equip. Opt.
Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools

22.02 6.94 Hr / Cubic


Meters

TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


Foreman 50.56 15.94 Hr / Cubic
Meters
50.56 15.94 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equipt. Opt.

Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools

29.67 9.36 Hr / Cubic


Meters
23.14 7.3 Hr / Cubic
Meters
30.33 9.57 Hr / Cubic
Meters
Foreman 34.13 6.56 Hr / Cubic
Carpenter Meters
&Steelman
Laborer
Mason
Equip. Opt.
Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools

22.75 4.38 Hr / Cubic


Meters
16.65 3.2 Hr / Cubic
Meters
28.44 5.47 Hr / Cubic
Meters

TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


Foreman 9.29 2.93 Hr / Cubic
Meters
Carpenter
&Steelman
Mason
Laborer
Equipt. Opt.
Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools

6.83 2.15 Hr / Cubic


Meters
9.1 2.87 Hr / Cubic
Meters
7.58 2.39 Hr / Cubic
Meters
Foreman 11.38 3.59 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator
Concrete Pump &
Trans Mixer

Crane
Truck
Power Tools

9.1 2.87 Hr / Cubic


Meters
11.57 3.65 Hr / Cubic
Meters
9.48 2.99 Hr / Cubic
Meters
14.37 4.53 Hr / Cubic
Meters
12.47 3.93 Hr / Cubic
Meters
Foreman 0.22 0.1 Hr / Square
Meters
Laborer
Mason
Carpenter

Equip. Opt.

Concrete Pump

Concrete Vibrator

Finishing Eqpt

0.22 0.1 Hr / Square


Meters

TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


Foreman 5.88 1.61 Hr / Cubic
Meters
5.88 1.61 Hr / Cubic
Meters
Carpenter
&Steelman

Laborer
Mason
Equip. Opt.

Concrete Vibrator

Concrete Pump

Crane
Truck
Power Tools

4.9 1.34 Hr / Cubic


Meters
Foreman 4.2 0.99 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Crane
Truck
Concrete Pump

Power Tools

5.15 1.21 Hr / Cubic


Meters
5.72 1.34 Hr / Cubic
Meters
TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


Foreman 16.17 4.95 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools

20.1 6.15 Hr / Cubic


Meters
14.07 4.31 Hr / Cubic
Meters
9.38 2.87 Hr / Cubic
Meters
13.53 4.14 Hr / Cubic
Meters

TEAM COMPONENTS AVE. OUTPUT - HOURS / UNIT

LABOR EQUIPMENT UNIT


9.7 2.97 Hr / Cubic
Meters
1.19 0.98 Hr / Cubic
Meters
Foreman 4.2 1.15 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Crane
Truck
Concrete Pump

Power Tools

4.3 1.18 Hr / Cubic


Meters
Foreman 8.67 2.85 Hr / Cubic
Meters
Carpenter

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Concrete Pump

Crane
Power Tools

Foreman 9.38 2.87 Hr / Cubic


Meters
9.38 2.87 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools

Foreman 102.16 36.89 Hr / Cubic


Meters
Carpenter

Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Concrete Pump

Crane
Truck
Finishing
Equipment

Power Tools
Foreman 12.76 4.02 Hr / Cubic
Meters
Carpenter
&Steelman

Mason
Laborer
Equip. Opt.

Concrete Vibrator

Concrete Pump &


Trans Mixer

Crane
Truck
Power Tools
REBAR PRODUCTIVITY RATE
REINFORCING BAR
ITEM ACTIVITY / DESCRIPTION SIZE / DIMENSION UNIT TEAM COMPONENTS
NO.

1 Beams & Girders 10 mm to 25 mm Metric Ton 0.25 Foreman


2 Beams & Girders 25 mm to 40 mm Metric Ton 4 Steelman
3 Columns 10 mm to 25 mm Metric Ton 2 Laborer / Helper

4 Columns 25 mm to 40 mm Metric Ton Equipment


Operator
5 Spirals 10 mm to 350mm Metric Ton 0.25 Power Tools
6 Elevated Slabs 10 mm to 25 mm Metric Ton Crane Low Bed
Truck
7 Footings 10 mm to 25 mm Metric Ton 1
8 Footings 25 mm to 40 mm Metric Ton 0.125
9 Slab on Grade 10 mm to 25 mm Metric Ton 0.125
10 Walls 10 mm to 25 mm Metric Ton
11 Walls 25 mm to 40 mm Metric Ton
12 Typical in Place 10 MT (Ave.) Metric Ton
13 Typical in Place 45 MT (Ave.) Metric Ton

HANDLING OF REBAR
ITEM ACTIVITY / DESCRIPTION UNIT TEAM COMPONENTS AVE. OUTPUT – HOURS
NO.
14 Unloading, handling, & sorting Metric Ton 0.25 Foreman 0.76
steel reinforcement
4 Steelman

2 Laborer /
Helper
0.5 Equipment
Operator

Eqpt. Op.
Oiler
0.5 Crane
0.5 Low Bed
Truck
0.5

STEEL DOWELS
ITEM ACTIVITY / DESCRIPTION SIZE / UNIT TEAM COMPONENTS
NO. DIMENSION
15 Steel Dowels, 600mm Long 10 mm Piece 0.125 Foreman

16 Steel Dowels, 600mm Long 15 mm Piece 2 Steelman

17 Dowels, Steel, 600mm Long 20 mm Piece 1 Laborer / Helper

18 Steel Dowels, more than > 20mm Kilogram


600mm

19 Smooth dowels, 300mm long 10 mm Piece

20 Smooth dowels, 300mm long 16 mm Piece

21 Dowel caps, 125mm long 20 mm Piece

22 Dowel caps, 125mm long 32 mm Piece

SPLICING OF REBAR
ITEM ACTIVITY / DESCRIPTION SIZE / UNIT TEAM COMPONENTS
NO. DIMENSION
23 Buttweld column bar splice 35 mm Piece 1 Foreman

24 Column splice clamp, 35 mm Piece 4 Steelman


sleeve/wedge
25 Mechanical splice sleeve type 35 mm Pc 2 Laborer / Helper

26 Splicing Straight Rebar, 35 mm Piece Power Tools


mechanical threading
27 Splicing Straight Rebar, 40 mm Piece 1
mechanical threading
28 Splicing Bent Rebar, 40 mm Pc
mechanical threading
AVE. OUTPUT – HOURS / UNIT

LABOR EQUIPMENT UNIT

45.5 8.75 Hrs / Metric Ton


30 9 Hrs / Metric Ton
42 12.6 Hrs / Metric Ton

35 10.5 Hrs / Metric Ton

35 10.5 Hrs / Metric Ton


23.33 7 Hrs / Metric Ton

30 9 Hrs / Metric Ton


23.33 7 Hrs / Metric Ton
26.25 7.88 Hrs / Metric Ton
23.33 7 Hrs / Metric Ton
19.09 5.73 Hrs / Metric Ton
38.18 11.45 Hrs / Metric Ton
30 9 Hrs / Metric Ton

E. OUTPUT – HOURS / UNIT

0.11 Hr / Metric Ton


AVE. OUTPUT – HOURS / UNIT

0.07 0 Hr / Piece

0.09 0 Hr / Piece

0.1 0 Hr / Piece

0.09 0 Hr / Kilogram

0.26 0 Hr / Piece

0.31 0 Hr / Piece

0.34 0 Hr / Piece

0.04 0 Hr / Piece

AVE. OUTPUT – HOURS / UNIT

0.84 0.24 Hr / Piece

0.49 0.14 Hr / Piece

1.07 0.31 Hr / Piece

0.98 0.28 Hr / Piece

1.31 0.37 Hr / Piece

1.63 0.47 Hr / Piece