Professional Documents
Culture Documents
Tierra Vista Supervised
Tierra Vista Supervised
PROJECT:
LOCATION:
TOTAL:
Date :
Date: DESCRIPTION REF # / OR #
24-Aug-19 Sherwin Construction supply 276150
28-Aug-19 Sherwin Construction supply 276276
25-Sep-19 Sherwin Construction supply 277432
24-Sep-19 Tierra Vista Homeowners 2819
25-Sep-19 Palawan
& CONSTRUCTION
ag, Batangas
6,110.00
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: JULY 6-12 2019
0
0
0 22,150.00
Prepared by: Checked by: 0
0
APC JCM/RRM
HR ADMIN/ENGR
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: August 24-30 2019
0
0
0 36,200.00
Prepared by: Checked by: 0
0
APC JCM/RRM
HR ADMIN/ENGR
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: August 31. -Sept. 06
59,980.00
44,980.00
Prepared by: Checked by:
MML JCM/RRM
HR ADMIN/ENGR
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: Sep . 7 - Sep. 13 2019
30,315.00
15,315.00
Prepared by: Checked by:
MML JCM/RRM
HR ADMIN/ENGR
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: Sep . 14- Sep. 20 2019
Jhon2 600.00
36,735.00
19,360.00
Prepared by: Checked by:
MML JCM/RRM
HR ADMIN/ENGR
Received
by
32,910.00
MML JCM/RRM
HR ADMIN/ENGR
TION
0.00 800.00
0.00 1,500.00 300.00 2,400.00
0.00 1,000.00 -800.00 1,800.00 last payroll adjustment
0.00 1,000.00 -235.00 645.00 last payroll adjustment
0.00 -300.00 900.00 last payroll adjustment
0.00 -300.00 900.00 last payroll adjustment
0.00 1,000.00 -470.00 410.00 last payroll adjustment
0.00 1,000.00 950.00
0.00 1,000.00 1,750.00
0.00 1,000.00 600.00 500.00
0.00 1,000.00 800.00
0.00 1,000.00 -200.00 600.00 last payroll adjustment
0.00 1,000.00 1,200.00
0.00 500.00 -470.00 1,850.00 last payroll adjustment
0.00 1,000.00 600.00
0.00 1,500.00 -1,400.00 2,300.00 last payroll adjustment
0.00 1,000.00 600.00 800.00
0.00 1,000.00 -470.00 1,350.00 last payroll adjustment
0.00 15,500.00 -3,145.00 20,555.00
44,855.00
MML JCM/RRM
HR ADMIN/ENGR
CTION
27,485.00
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: Oct 05 - 11 2019
43,436.06
Arthur: Penalty for dringking alcohol without permission =2,500 -500=2000-500=1500 - 500
Prepared by: Checked by: Christian:: Penalty for dringking alcohol without permission =2,500 -500=2000
MML JCM/RRM
HR ADMIN/ENGR
Other TOTAL Received
Deduction by
400.00
600.00 2,362.50
500.00 1,900.00
410.00
500.00
1,600.00
480.00
1,543.75
600.00 2,225.00
2,600.00 adjusted 1 day pondo
400.00 900.00
400.00
550.00 2,456.25
470.00 2,350.00
600.00
525.00 653.56
1,260.00
400.00
500.00 650.00
1,200.00
1,350.00
1,350.00
1,000.00
4,145.00 28,591.06
28,591.06
FACTOR OF SAFETY DESIGN AND CONSTRUCTION
Pinagkurusan, Alitagtag, Batangas
Proj: 2 Storey Residential Structure
Loc: Tierra Vista Lipa City
Dur: Oct 12 - 18 2019
61,538.00
Arthur: Penalty for drinking alcohol without permission =2,500 -500=2000-500=1500 - 500
Prepared by: Checked by: Christian:: Penalty for drinking alcohol without permission =2,500 -500=2000
JCM/RRM
HR ADMIN/ENGR
N
1,600.00
5,547.50
2,700.00
2,256.00
4,420.00
3,264.00
4,358.75
3,300.00
4,905.00
1,200.00
4,358.75
2,726.00
0.00
2,700.00
2,436.00
2,000.00
4,420.00
2,000.00
2,250.00
3,196.00
2,500.00
0.00 0.00 62,138.00
62,138.00