SUZLON ENERGY LTD (POWER EVACUATION DIVISION)

PUNE (MAHARASHTRA)

E-Business Dot Com Pvt. Ltd. is an authorized e- commerce service provider for “SUZLON ENERGY LTD” (Seller) to obtain
rates online through
www.steelez.com

SUZLON ENERGY LTD (POWER EVACUATION DIVISION)


SELLER NAME
SATARA AND SANGLI

E-BUSINESS DOT COM PVT LTD


201 ROYAL ESTATE BUILDING, 9/2 SOUTH TUKOGANJ, INDORE,452001
AUCTION TO BE MADHYA PRADESH.
CONDUCTED BY PH:-0731-4715409
MOB- 9752492133
PORTAL :WWW.STEELEZ.COM

TH
DT: 30 JAN 2020, OPENING TIME 03:00 PM & CLOSING TIME 04:00 PM (WITH THE GAP OF 3 MINUTES
BETWEEN EVERY LOT, FOR DETAILS PLS CHECK WEBSITE)
DATE & TIME OF AUCTION (AUTO EXTENSION AS APPLICABLE)
AUCTION WEBSITE : WWW.STEELEZ.COM

BIDDING IN THE LAST MINUTES AND SECONDS SHOULD BE AVOIDED IN THE BIDDERS OWN INTEREST
SPECIAL INSTRUCTIONS NEITHER THE SERVICE PROVIDER NOR SELLER WILL BE RESPONSIBLE FOR ANY LAPSES /FAILURE ON THE
PART OF THE VENDOR, IN SUCH CASES.

SCHEDULE OF PROGRAM

INSPECTION OF MATERIAL TILL DT:29th JAN 2020, TIME 10AM TO 04PM (SUNDAY CLOSED)

SUZLON ENERGY LTD 220/33 KV Sadawaghapur Sub Station, Village – Sadawaghapur Tal. Patan Dist.
Satara.
Suzlon Energy Limited 220/33KV Mendgiri Substation, Village – Mendgiri Tal. Dist. Sangali
FOR INSPECTION
MR. HARISH KHANDELWAL- 9752492136
MR. DILIP PATIDAR- 9752492133

AS PER BELOW AMT 75000 DD IN FAVORING OF “SUZLON ENERGY LTD” PAYABLE AT PUNE OR
EMD DETAILS
EBUSINESS DOT COM PVT LTD, HDFC BANK A/C NO. 00362560011912

NOTE: IF THE SESSION GETS EXPIRED AND ACCOUNT GETS LOGGED OUT, BIDDER NEEDS TO RE-LOGIN HIS/HER ACCOUNT.
TAX CONDITION:
PRICE ARE BASIC, ALL OTHER TAXES WILL BE EXTRA. (GST 18%). RATES QUOTED ARE PER UOM

“THE SCRAP QUANTITY MENTIONED IN THE CATALOG IS JUST FOR AN IDEA AND ACTUAL QUANTITY MAY VARY AS PER
GENERATION H1 PARTY HAS TO LIFT ALL AVAILABLE MATERIAL. “

Materi
Auction al Quant
Company Product Description Start Date End Date EMD
ID Locatio ity
n
Approx. wt. of - MS/Porcelain/Copper/oil Wt details
SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
33 KV POTENTIAL of Each Unit Total Wt. - 135Kg Oil Wt. - 30Kg 13
43696 EVACUATION DIVISION) [ Satara 03:00:00 04:00:00
TRANSFORMER Insulator Wt. - 20Kg Copper Wt. - 4.5Kg. MS Wt. - Nos
MAHARASHTRA ] PM PM
80Kg
Approx. wt. of - MS/Porcelain/Copper/oil Wt details
SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
33 KV CURRENT of Each Unit Total Wt. - 130Kg Oil Wt. - 18
43697 EVACUATION DIVISION) [ Satara 03:00:00 04:03:00
TRANSFORMER 30Kg Insulator Wt. - 20Kg Copper Wt. - 10 Kg. MS Nos
MAHARASHTRA ] PM PM
Wt. - 70 Kg
SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
EARTHING_MATERIAL_GI_FLAT_25X3MM & GI 2000
43698 EVACUATION DIVISION) [ GI SCRAP Satara 03:00:00 04:06:00
NUTS & BOLTS FOR SUBSTATION & Other GI Scrap KG
MAHARASHTRA ] PM PM

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


1500
43699 EVACUATION DIVISION) [ ALUMINIUM SCRAP Aluminium Conductor Satara 03:00:00 04:09:00 50000
MAHARASHTRA ] PM PM KG

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


ALUMINIUM CABLE 100
43700 EVACUATION DIVISION) [ Satara 03:00:00 04:12:00
SCRAP KG
MAHARASHTRA ] PM PM

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


500
43701 EVACUATION DIVISION) [ ALUMINIUM SCRAP Mix clamps & connectors of SS & Line Satara 03:00:00 04:15:00
MAHARASHTRA ] PM PM KG

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


2500
43702 EVACUATION DIVISION) [ COPPER CABLES Satara 03:00:00 04:18:00
MAHARASHTRA ] PM PM KG

Approx. wt. of - MS/Porcelain/Copper/oil Wt details


SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
33 KV POTENTIAL of Each Unit Total Wt. - 135Kg Oil Wt. - 30Kg 12
43703 EVACUATION DIVISION) [ SANGLI 03:00:00 04:21:00
TRANSFORMER Insulator Wt. - 20Kg Copper Wt. - 4.5Kg. MS Wt. - Nos
MAHARASHTRA ] PM PM
80Kg

Approx. wt. of - MS/Porcelain/Copper/oil Wt details


SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
33 KV CURRENT of Each Unit Total Wt. - 130Kg Oil Wt. - 30Kg 24
43704 EVACUATION DIVISION) [ SANGLI 03:00:00 04:24:00
TRANSFORMER Insulator Wt. - 20Kg Copper Wt. - 10 Kg. MS Wt. - 70 Nos
MAHARASHTRA ] PM PM
Kg

GI NUT, BOLTS & WASHERS FOR SS & GI STRUCTURE


FOR SUBSTATION_LATTICE
SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
& EARTHING_MATERIAL_GI_FLAT_50X8MM 9500
43705 EVACUATION DIVISION) [ GI SCRAP SANGLI 03:00:00 04:27:00
& EARTHING_MATERIAL_GI_FLAT_50X6MM KG
MAHARASHTRA ] PM PM
& Isolator structure_GI Pole structure & Isolator
chasis_GI Material
25000
SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020
ALUMINIUM CABLE 200
43706 EVACUATION DIVISION) [ SANGLI 03:00:00 04:30:00
SCRAP KG
MAHARASHTRA ] PM PM

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


300
43707 EVACUATION DIVISION) [ COPPER CABLE SCRAP SANGLI 03:00:00 04:33:00
MAHARASHTRA ] PM PM KG

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


EMPTY MS DRUM 210 125
43708 EVACUATION DIVISION) [ SANGLI 03:00:00 04:36:00
LTR Nos
MAHARASHTRA ] PM PM

SUZLON ENERGY LTD (POWER 30-01-2020 30-01-2020


525
43709 EVACUATION DIVISION) [ MS SCRAP MS Flat & Isolator operating Box SANGLI 03:00:00 04:39:00
MAHARASHTRA ] PM PM KG
Details

Approx. Length of cut Total Length in weight in kg


Auc id Cable details
pieces Mtr. (Approx)

3.5C X 35 Sq.MM. _CU CABLE 1000 1000


1,090.25
10
500
4C X 16 Sq.MM. _CU CABLE 1000 1550 882.88
20
20
30
7X 2.5 Sq.MM._CU CABLE 50 130 20.25
50
21

43702 50
12X 2.5 Sq.MM._CU CABLE 126 33.64
50
5
2.5
16X 2.5 Sq.MM._CU CABLE 502.5 178.89
500
40
19X 2.5 Sq.MM._CU CABLE 85 225 95.12
100
OPTICAL FIBRE CABLE 1000 1000
2C X 4 Sq.MM. _CU CABLE 17 17 2.31
4C X 2.5 Sq.MM. _CU CABLE 24 24 5.76
12X 2.5 Sq.MM._CU CABLE 8 8 1.92
450
43700 4C X 16 Sq.MM. _AL CABLE 525 90.72
75

Conductor AAAC Moose_100% AL 1 Lot 1000


43699 1,000.00
Conductor ACSR Zebra_75% AL+25% Steel 1 Lot 500 500.00

SPECIAL NOTES:-
 After approval H1 party has to deposit 5% of total lot basic value as security deposit in 2 days & full amount in
next 2 days party has to lift all material in 15 working days without any delay.
 In any case if H1 party failed to lift material EMD & security deposit will be forfeited.
 Buyers have to deploy their own labors, cutting equipments, hydra and Vehicle for lifting. weighing in buyer scope
(Empty vehicle 2 to 3 weighing & also same for after loading)
 Buyers will have to deposit advance payment one day before placing the vehicle.
 Buyers will have to deploy vehicle on call of company failing which penalty of Rs. 2000/- per day will be charge
and after 4 days his EMD & Security deposit will be forfeited and buyers will be blacklisted from all auction events
of Suzlon and www.steelez.com .
PICS
33 KV POTENTIAL TRANSFORMER 33 KV CURRENT TRANSFORMER

EARTHING_MATERIAL_GI_FLAT_25X3MM Mix clamps & connectors of SS & Line

33 KV POTENTIAL TRANSFORMER 33 KV CURRENT TRANSFORMER

GI STRUCTURE FOR SUBSTATION_LATTICE EARTHING_MATERIAL_GI_FLAT_50X8MM


EARTHING_MATERIAL_GI_FLAT_50X6MM Aluminium Cables

Copper Cables MS Flat

Empty oil drums Isolator structure_GI Pole structure

Isolator chasis_GI Material Isolator operating Box

PROCEDURE OF FORWARD AUCTIONING:-

 SUZLON ENERGY LTD, PUNE (MH) will declare its Starting Price (SP), which shall be visible to the all vendors during
the start of the forward Auction.
 The start price of an item in online forward auction is open to all the participating bidders. Any bidder can start
bidding, in the online forward auction, from the start price itself. The second online bid and onwards will have to be
higher than the H1 rate by minimum one increment value, or higher.

 The minimum bid increment amount shall be display at the time of auction. The Bidding Rates will be on
Per MT /Per Number etc.

 Bidding in the last minutes and seconds should be avoided in the bidders own interest Neither the Service
Provider nor Seller will be responsible for any lapses /failure on the part of the vendor, in such cases.

 The Auto Bid feature allows Bidders to place an automated bid against other Bidders in an auction and bid without
having to enter a new amount each time a competing Bidder submits a new offer.

 Auto bid is not a confirmed bid. It is only the maximum ceiling amount set by the bidder to enable the auction
engine to place bids on his behalf, whenever he is out bidded, upto the ceiling set by him
 You will be able to view the following on your screen along with the necessary fields in the Forward Auction:-

(a) Highest Bid in the Auction.


(b) Bid Placed by you.
(c) Opening Price & Increment Value.
(d) Final Closing Price

Training: Steelez.com will provide training (online) if required by the bidders at a mutually convenient date and time
before the Auction.

TERMS & CONDITIONS OF FORWARD AUCTION


(TO BE SIGNED ON EACH PAGE BY THE PARTICIPANT IN AUCTION)

 Subject to the reserve price, if any, fixed by the SELLER and subject to the terms and conditions set out herein, sale
shall be made to the HIGHEST BIDDER on “AS IS WHERE BASIS ”and“ NO COMPLAINT BASIS IS.” The Seller does not
undertake any responsibility to procure any permission/license etc. in respect of the auction property offered for
sale.
 SELLER reserves the right to modify and amend the terms & conditions and announce the same at any time before
the auction concludes. Announcements during the auction on the website including announcement of any additional
conditions OR correction in the catalogue and/or additions or deletions of items being offered for sale are being
done with the consent and knowledge of the seller, and it is binding on the bidder.
 Seller and e-Business dot Com Pvt Ltd is not responsible for any damages, including damages that result from, but
are not limited to negligence. e-Business dot Com Pvt Ltd will not be held responsible for consequential damages,
including but not limited to systems problems, inability to use the system, loss of electronic information etc.
 In the event of failure on the part of the successful bidder to fulfill his contractual obligations, seller / Steelez
reserves the right to debar such bidder from participating in any future auction conducted by Steelez on behalf of
seller.
 EMD/DEPOSIT: Buyers will need to pay refundable EMD/deposit as specified by the seller. The Seller reserves the
right of forfeit the EMD/deposit for non-adherence of any / various conditions / clauses as laid down during the
auction.
 The highest bidder does not get any right to demand acceptance of his offer. SELLER reserves the right to accept/
reject/ cancel any bid, withdraw any portion of the Auction Property at any stage from Auction even after
acceptance of bid/ issue of delivery order or release order/ deposit of full value by successful bidder without
assigning any reason thereof. In the event of such rejection/ cancellation/ withdrawal, SELLER, shall refund the value
of Auction Property, if paid for, to the successful bidder. SELLER shall not be responsible for any damages/loss
whatsoever to the successful bidder on account of such withdrawal.
 CONTRACT VALIDITY: - IMMEDIATE PAYMENT & LIFTING & LIFTING TIME 7 DAYS AFTER APPROVAL.
 PAYMENT: All payments shall be made I the form of RTGS/NEFT issued by any Scheduled /Nationalized Bank in
favour of SUZLON ENERGY LTD, PUNE (MH) The successful tenderer(s) will be intimated about the acceptance of the
offer and would be required to deposit full cost of materials and applicable sale tax and duties within 3-days by
crossed Demand Draft in favor SUZLON ENERGY LTD, PUNE (MH) payable at PUNE (MH) failing which SUZLON
ENERGY LTD, PUNE (MH) may award the contract to any other party at the cost of the successful tenderer (s) and
the EMD shall be forfeited. The Successful tenderer(s) shall also be liable to pay damages to SUZLON ENERGY LTD,
PUNE (MH) arising out of non deposit of price and re-awarding of contract by SUZLON ENERGY LTD, PUNE (MH) to
any other party.
NO OTHER MODE OF PAYMENT WILL BE ACCEPTED.

 LIFTING OF MATERIAL:-The time is the essence of the contract and the successful tenderer (s) should start
lifting the material with immediate effect on award of contract after depositing the cost of the material per
the Contract.
 PENALTY FOR NON LIFTING OF SCRAP :-In case the materials are not lifted from the factory as indicated in
the offer schedule or by seller, SUZLON ENERGY LTD, PUNE (MH) reserves its rights to dispose it off to any
other party and loss will be made good by the successful tenderer and SUZLON ENERGY LTD, PUNE (MH)
will be at liberty to adjust the amount of EMD and cost of material, the loss and damages suffered by
SUZLON ENERGY LTD, PUNE (MH) due to re-awarding of contract to any other party. The successful tenderer
(s) shall also be liable to pay loss and damages. No extension will Normally be permitted either for deposit of
amount or for lifting the materials. Such extension, if any, in special case, will be valid only if permitted in
writing by seller Such extension would be granted only .
 *****No Delay in Lifting of Material & Payments. *****
 Vehicles should be placed on Daily Basis. Failing the same EMD will be forfeited.
 Payments should be made one day prior to placing the vehicle in form of RTGS /NEFT only. NO OTHER MODE OF
PAYMENT WILL BE ACCEPTED

NOTE: Material is sold on “as is where is basis”. Buyers to inspect the scrap/material thoroughly & satisfy
themselves about the nature & properties of the item. No complaint will be entertained in regard to quality type of
these materials. The material once sold will not be taken back in any circumstances.

MATERIAL INSPECTION - I HAVE INSPECTED ALL MY INTERESTED PRODUCTS AND I AM READY TO LIFT ALL THE
MATERIAL AS IS WHERE BASIS AND NO COMPLAIN BASIS WITHOUT ANY CONDITION IN WHICH I WILL BE H1 BIDDER.

These terms and conditions are to be signed by the tenderer and must accompany the tender documents
otherwise it is liable to be rejected.

Acceptance of the above terms and conditions:-

We confirm that we have read and clearly understood above terms and conditions. We undertake to abide by