Gravity Dam

Irrigation and water Engineering 16th Edition written by Dr. B.C.PUNMIA and Dr. PANDE B.B. LAL

۱۴۰۰
Gravity Dams

Over Sliding
turning

Sliding

Sliding

1
FORCES ACTING ON GRAVTTY DAM

Water pressure -۱

Weight of dam –۲

Uplift pressure –۳

Ice pressure –۴

Wind pressure –۵

Wave pressure –۶

Silt pressure ‫ـ‬۷

Force due to Earth –۸

2
3
Water pressure -۱

Heel U/S

H W X H H
W = 1000 Kg / W
M3
H/3

Heel U/S

Heel U/S
Horizontal pressure –۱

PwH = ½ WH xH = ½ WH
2

Vertical pressure –۲

4
Pwv
A A'C' B

D/S
H' Toe

Toe D/S
Horizontal pressure –۱

Pw H' = ½ W H' x H' = ½ W H'


2

Vertical pressure –۲
Pw V'
F F'E'

Weight of dam ۲

‫ته‬

5
W1,W2,W3,……..Wn

–۳

Uplift pressure

Heel U/S
Uplift pressure

Uplift pressure at heel or U/S = W x H


Toe D/S
Uplift pressure

Uplift pressure at toe or U/S = W x H’


Gallery

Uplift pressure at gallery = W [ H’ +1/3 (H - H’ )]

6
Ice pressure -۴

2.5 – 15 Kg / Cm 2

5 Kg /Cm 2

Wind pressure -۵

100 – 150 Kg / m 2

Wave pressure -۶

hw = 0.032ඥ𝑣. 𝑓 + 0.763 − 0.0271( 𝑓 )3/4

7
- hw
‫𝑣ـ‬
𝑓
f < 32 km
f > 32 km
hw = 0.032 ඥ𝑣. 𝑓

-hw
2
hw
3
1
hw MWL
3
MWL

Silt pressure -۷

‫ه‬
Rankines formula

1 2 h
Psilt  h ka and itis acts at from base
2 3

1  sin 
Where : ka 
1  sin 

8
1 2 1  sin 
Psilt  h
2 1  sin 

 
h
U/S

  3.6kn / m 3
  9.20kn / m 3

1 2
Ps  h
2
h2
vertical force Pv = 9.2  4.6h 2 kn / m run Total
2

Total horizontal force 1


 PH  (3.6)h 2  1.8h 2 kn / m run
2

9
Earth quake pressure –۸

Acceleration

Earth quake intensity rate

10
‫𝐼𝐼 ‪𝑍 −‬‬ ‫𝐼‪𝑍−‬‬

‫‪10 , 9 , 8 , 7‬‬

‫درجه يا با ل‬ ‫تأثيرات‬ ‫تعجيل‬


‫‪m / sec 2‬‬
‫‪7‬‬ ‫– ‪0.02g‬‬
‫‪0.05g‬‬

‫‪8‬‬ ‫– ‪0.05g‬‬
‫‪0.10g‬‬

‫‪9‬‬ ‫‪0.1g – 0.2g‬‬

‫‪10‬‬ ‫‪0.2g -0.3g‬‬

‫‪11‬‬
Calculation of earth quake

effects

-a

Inertia force in the body of the dam –۱

12
F = mass of dam x Acceleration of earth quake

F = mαg m= w/g
g α w

D/S
Hydrodynamic force of water ۲
Reservoir

Pe Von - Karman

Pe = 0.555 α x w x H2
3H
3

3H
Me = Pe ( 3
) = 0.424 Pe X H

13
-b

F=αw

wc (1   ) for dam materials


w(1   ) for water
W WC α

14
(Mode of failure)

Gravity Dams

(Over-turning) –۱
(Sliding) –۲
(Tension) –۳
(Compression of Crushing) –۴

Over turning –۱

D/S
Clock wise

Over turning
Factor of safty F.S

15
F.S 
 right moment 
 MR   M 

 overturning moment  MO  M 

1.5 – 2.0
1.5

Sliding –۲
Base

[(V  U )]
S .F 
H

16
3≥ F.S ≥1

µ
µ= 0.65 – 0.75
v  (v  u)
H (Uplift pressure ) u
.
F.S
F.S

FFS Shear friction factor

[(V  U )]Bwg
S .F .F 
H

5 S .F .F  4
g
b 14 Kg/cm 2

17
Compressor pressure –۳
Normal stress

Pn
Pn
e
Bending Direct stress Pn
stress

Pn = Bending stress + Direct stress

v 6e
Pn  (1  )
Bw Bw
v
Toe D/S

Pn Normal stress
Heel U/S

Pn Normal stress

18
v 6e
Pn (Toe )  (1  )
Bw Bw

v 6e
Pn ( Heel )  (1  )
Bw Bw

Normal stress –
Heel U/S Toe D/S
e < Bw/6

19
Normal stress –
U/S Toe D/S
e = Bw/6 Heel
v 6e 2v
( Pn )Toe  (1  )
Bw Bw Bw

Normal stress –
Normal Heal U/S

Pn stress
Toe D/S
D/S R
e > Bw/6 1/3 Bw

20
Ten sion –۴
Heal U/S
e > Bw/6
U/S Normal stress
Heal
e ≤ Bw/6
1/3
1/3 x Bw/2

e ≤ Bw/6

Tension

v 6e
(Pn)Heal = (1 − )
Bw Bw

21
Gravity Dam Design
Qmax=AxV

V = C(RxS)1/2

–V

–C

–R

–S

S = (h U/S – h D/S)/ L

–R =A /P
22
A

( C ) = 1/n x R1/6

n= 0.014 – 0.017 n = 0.27


n = 0.3
V

– V = C x (R x S)1/2

Q max = V x A
Q max
–V
23
A

Q max

Q max = m x b(s) x ඥ2g x H(s) 3/2

Q max
m = 0.35 –m
g = 9.81 m/sec2 g
–Hs

– b(s)

Qmax
b(s) =
m . ඥ2g .H3/2

b(s)

Qmax
q=
b(s)
– Qmax

24
– b(s)
–q

Q max
B

qs= Q max
B

– qs

B
– Qmax
qs2 1
Rs = 1.35( ) 3
f

Maximum depth of scour – Rs


– qs

25
)Lacey’s silt factor f
Lacey’s silt factor
Material Average d50 size Silt factor f
(mm)
Very fine SILT 0.05 0.4
Fine SILT 0.12 0.5
Medium SILT 0.15 0.7
Standard SILT 0.32 1
Medium SAND 0.5 1.2
Coarse SAND 0.72 1.5
Fine GRAVEL 1.3 2
Medium GRAVEL 7.3 4.7

Heavy GRAVEL 26 9
Small BOULDERS 50 12

Medium BOULDERS 72 15

Large BOULDERS 185 24

D = X (Rs − y)
X X

Maximum depth of scour Rs


-y
–D

26
Severity factor
Location Severity
factor X

Upstream of structure 1.25


Downstream of structure 1.5
Nose of spur 2.25
Transition from nose to straight 1.5
Straight reach of guide bank 1.25

27
q = ᵩh1ඥ2g(TEL − h1 )
–q
g = 9.81 m/sec2 g
ᵩ = 0 97 – 0 95 ᵩ
– h1

U/S – TEL

T.E.L = H(s) + Hs
– H(s)
– Hs

28
q
h1 = 𝜑 ඥ2g (TEL−h1)
…..(1)

h1

h 1= 0

q
h1 = 𝜑 ඥ2g (TEL)
h 1-2 1 h1

q
h1-2 = 𝜑ඥ2g (TEL−h1)
…..(2)

h 1-3 h 1-2
q
h1-3 = 𝜑ඥ2g (TEL−h1−2)
…..(3)

h 1-4 h 1-3
q
h1-4 = 𝜑ඥ2g (TEL−h1−3)
…..(4)

h 1-5 h 1-4
q
h1-5 = 𝜑ඥ2g (TEL−h1−4)
…..(5)

h 1-6 h 1-5
q
h1-6 = 𝜑ඥ2g (TEL−h1−5)
…..(6)

h1
h1

29
h1 8 q2
H2 = [√1 + − 1]
2 q(h1) 3

– H2
– h1

–q
H2 > h 1

H2=h 1

30
H2 < h 1

H2 > h 1

H2< d + h

H2 – h < d
– H2
d
–h

L = Ld + LJ
L
– Ld
– LJ

Ld = 1.64 ඥ H(PTEL + 0.24H)

31
LJ = 3 H2
H

U/S PTEL

Creep Length

bG 2 Hs2 1/2
= [ − 1]
Hs π Gc (πGcd2)2
π = 3.14 –π

32
Gc = 1/2 - 1/7 Gc
Gc = 0.5 - 0.143

– bG
– Hs
D/S Cut off wall – d2

2 1
d2 /Hs = ( )( bG 2 )
πGc ( ) (π Gc)2 +4
Hs

π = 3.14 –π

Gc = 1/2 - 1/7 Gc
Gc = 0.5 - 0.143

– bG
– Hs
D/S Cut off wall – d2

33
d2
Bw

Bw
∑M
X=∑
w

1/3
1/3 x Bw/2

e ≤ Bw/6

Bw
e= –x
2
Bw Bw
= −X
6 2
Bw Bw
X= −
2 6
3Bw − Bw
X=
6
2Bw
X=
6

34
Bw
X=
3
Bw ∑ M
=
3 ∑w
∑M
Bw ∑w

d2
D/S Cut off wall

bG

Bw

Bw = bG – L

35
ɣw = 1 T/m3

ɣs = 1.6 T/m3

ɣston mnasory = 2.2 T/m3

𝜑𝑠 = 20°
– 𝜑𝑤 = 0°

∑W = (W1 + W2 … … . . +Wn) − Uw

𝜑
P𝑤 = 0.5 𝐻𝑠 2 ɣ𝑤 𝑡𝑔2 (45° + )
2

𝜑
𝑃𝐸2 = 0.5 𝐻𝑠 2 ɣ𝑠 𝑡𝑔2 (45° + )
2

1
Uw = (C. ɣw. Hs.Bw)
2
C=1 –C

Toe

∑M over turning moment = Mpw + ME2 − Uw


Resistance Moment

∑M Resistance moment = Mw + ME1

36
F.S = 1.5-2.0

∑M Resistance moment
F. S = > (1.5 − 2.0 )
∑M over turning moment

μW
F.S against sliding =
Pw

µ= 0.65 – 0.75 µ

∑M Resistance moment − ∑M over turning moment


𝑋=
∑W

Bw
e= −X
2
Toe –e

Toe –X

– Bw

37
X

Bw
X= −e
2

∑W = W1 + ⋯ + Wn
∑M

38
Toe

∑W 6e
Pn (Toe) = δmin = (1 − )
Bw Bw
Heel

∑W 6e
Pn (Heel) = δmax = (1 + )
Bw Bw

P
Uplift pressure

∑W = W1 + ⋯ + Wn − U

39
∑M
X

∑M
𝑋=
∑W
Bw
e= −X
2
Toe

∑W 6e
Pn (Toe) = δmax = (1 + )
Bw Bw
Heel

∑W 6e
Pn (Heel) = δmin = (1 − )
Bw Bw

40
41
1.5 m 6m

C=1 20 KN/m 3

1800 KN/m 2 µ= 0.6

42
b m

𝑊₁ = 1.5 × 6 × 20 = 𝑘𝑁
1
𝑊2 = (𝑏 − 1.5)6 × 20 = 60(𝑏 − 1.5)
2
𝑤𝐻 2 9.81(6)2
𝑃= = = 176.58 𝑘𝑁
2 2
1 1
𝑈= 𝑐𝑤𝐻. 𝑏 =
× 1 × 9.81 × 6𝑏 = 29.43𝑏
2 2
Σ𝑊 = 180 + 60(𝑏 − 1.5) − 29.43𝑏 = 90 + 30.75𝑏

43
Toe
ΣM
𝑋=
ΣW
2 2
180(𝑏 − 1.5 + 0.75) + 60(𝑏 − 1.5) (𝑏 − 1.5) − 176.58 × 2 − 29.43𝑏 𝑏
= 3 3
90 + 30.57𝑏
For no tension to develop, e should be equal to b/6
𝑏 𝑏 𝑏
−𝑋= or X=
2 6 3
Hence,
𝑏 180(𝑏 − 0.75) + 40(𝑏 − 1.5)2 − 353.16 − 19.62𝑏2
=
3 90 + 30.57𝑏
From witch, we get 𝑏2 − 2.944𝑏 − 39.074 = 0
Hence, 𝑏 ≅ 4.95 𝑚
Check for crushing:
ΣW = 90 + 30.57b = 90 + 30.57 × 4.95 = 241.322 kN
2 ΣW 2(241.322)
(Pn)max = = = 97.5 kN/m2 < 1800 kN/m2 OK
b 4.95
Check for sliding:
𝜇ΣW 0.6 × 241.322
𝐹. 𝑆 = = = 0.82
𝑃 176.58
Hence the dam is unsafe against sliding.
If a minimum factor of safety of 1 is required under condition of
uplift, we have
𝜇ΣW=P
0.6(90 + 30.57𝑏) = 176.58 from wich b = 6.683 m
44
What will be the base width in the dam of Example is neglected?
Investigate the corresponding stability conditions.

𝑊₁ = 1.5 × 6 × 20 = 𝑘𝑁
1
𝑊 2 = (𝑏 − 1.5)6 × 20 = 60(𝑏 − 1.5)
2
𝑤𝐻 2 9.81(6) 2
𝑃= = = 176.58 𝑘𝑁
2 2

ΣW = 90 + 30.57b = 90 + 30.57 × 4.95 = 241.322 kN


ΣM
𝑋=
ΣW
2
180(𝑏 − 1.5 + 0.75) + 60(𝑏 − 1.5) (𝑏 − 1.5) − 176.58 × 2
= 3
90 + 60𝑏
𝑏
But for notension to develop, 𝑋=
3

𝑏 180(𝑏−0.75)+40(𝑏−1.5)2 −353.16
=
3 90+60𝑏

From which, we get

45
𝑏2 + 1.5𝑏 − 19.908 = 0
Hence, 𝑏 = 3.774 𝑚.
Check for crushing:
ΣW = 90 + 60b = 90 + 60 × 3.774 = 316.44 kN
2 ΣW 2(316.44) kN kN
(Pn)max = = = 167.7 < 1800 Hence safe.
b 3.774 m2 m2

Check for sliding:


𝜇ΣW 0.6 × 316.44
𝐹. 𝑆 = = = 1.076 > 1. Hence safe.
𝑃 176.58

46
6m
1.5 m
4.5m
Toe

Normal stresses Heel

C =1 ⍴= 2.4

a - Reservoir empty

Weight W1= 1.5 x 6 x 1(2.4 x 9.81) =211.9 kN


Weight W2= 1/2 x 3 x 6 (2.4 x 9.81) =211.9 kN
∑w = 211.9 + 211.9 = 423.8 kN
B Toe

∑M 211.9 × 3.75 + 211.9 × 2 − 132.435 × 3 − 176.


X= =
∑W 423.8
= 2.875 m
𝑏
𝑒= − 𝑋 = 2.25 − 2.875 = −0.625 m
2
47
e 𝑒 = −0.625

∑W 6𝑒 423.8 6 × 0.625
(Pn)Toe = (1 − ) = (1 − ) = 𝟏𝟓. 𝟕 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5

∑W 6𝑒 423.8 6 × 0.625
(Pn)Heel = (1 + ) = (1 + ) = 𝟏𝟕𝟐. 𝟕 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5

48
b - Reservoir full

Weight W1= 1.5 x 6 x 1(2.4 x 9.81) =211.9 kN


Weight W2= 1/2 x 3 x 6 (2.4 x 9.81) =211.9 kN
W1 + W2 = 211.9 + 211.9 = 423.8 kN
wH2 9.81(6)2
P= = = 176.58 kN
2 2
1 1
U= cwH. b = × 1 × 9.81 × 6 × 4.5 = 132.435 kN
2 2
∑w = 211.9 + 211.9 − 132.435 = 291.365 kN
B Toe

∑M
X=
∑W
211.9 × 3.75 + 211.9 × 2 − 132.435 × 3 − 176.58 × 2
=
291.365
= 1.606 m
𝑏 4.5
𝑒= −𝑋 = − 1.606 = 0.644 m
2 2

∑W 6𝑒 291.365 6 × 0.644
(Pn)Toe = (1 + ) = (1 + ) = 𝟏𝟐𝟎. 𝟑 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5

∑W 6𝑒 291.365 6 × 0.644
(Pn)Heel = (1 − ) = (1 − ) = 𝟗. 𝟏 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5

49