Gravity Dam
Irrigation and water Engineering 16th Edition written by Dr. B.C.PUNMIA and Dr. PANDE B.B. LAL
۱۴۰۰
Gravity Dams
Over Sliding
turning
Sliding
Sliding
1
FORCES ACTING ON GRAVTTY DAM
Water pressure -۱
Weight of dam –۲
Uplift pressure –۳
Ice pressure –۴
Wind pressure –۵
Wave pressure –۶
2
3
Water pressure -۱
Heel U/S
H W X H H
W = 1000 Kg / W
M3
H/3
Heel U/S
Heel U/S
Horizontal pressure –۱
PwH = ½ WH xH = ½ WH
2
Vertical pressure –۲
4
Pwv
A A'C' B
D/S
H' Toe
Toe D/S
Horizontal pressure –۱
Vertical pressure –۲
Pw V'
F F'E'
Weight of dam ۲
ته
5
W1,W2,W3,……..Wn
–۳
Uplift pressure
Heel U/S
Uplift pressure
6
Ice pressure -۴
2.5 – 15 Kg / Cm 2
5 Kg /Cm 2
Wind pressure -۵
100 – 150 Kg / m 2
Wave pressure -۶
7
- hw
𝑣ـ
𝑓
f < 32 km
f > 32 km
hw = 0.032 ඥ𝑣. 𝑓
-hw
2
hw
3
1
hw MWL
3
MWL
Silt pressure -۷
ه
Rankines formula
1 2 h
Psilt h ka and itis acts at from base
2 3
1 sin
Where : ka
1 sin
8
1 2 1 sin
Psilt h
2 1 sin
h
U/S
3.6kn / m 3
9.20kn / m 3
1 2
Ps h
2
h2
vertical force Pv = 9.2 4.6h 2 kn / m run Total
2
9
Earth quake pressure –۸
Acceleration
10
𝐼𝐼 𝑍 − 𝐼𝑍−
10 , 9 , 8 , 7
8 – 0.05g
0.10g
11
Calculation of earth quake
effects
-a
12
F = mass of dam x Acceleration of earth quake
F = mαg m= w/g
g α w
D/S
Hydrodynamic force of water ۲
Reservoir
Pe Von - Karman
Pe = 0.555 α x w x H2
3H
3
3H
Me = Pe ( 3
) = 0.424 Pe X H
13
-b
F=αw
14
(Mode of failure)
Gravity Dams
(Over-turning) –۱
(Sliding) –۲
(Tension) –۳
(Compression of Crushing) –۴
Over turning –۱
D/S
Clock wise
Over turning
Factor of safty F.S
15
F.S
right moment
MR M
overturning moment MO M
1.5 – 2.0
1.5
Sliding –۲
Base
[(V U )]
S .F
H
16
3≥ F.S ≥1
µ
µ= 0.65 – 0.75
v (v u)
H (Uplift pressure ) u
.
F.S
F.S
[(V U )]Bwg
S .F .F
H
5 S .F .F 4
g
b 14 Kg/cm 2
17
Compressor pressure –۳
Normal stress
Pn
Pn
e
Bending Direct stress Pn
stress
v 6e
Pn (1 )
Bw Bw
v
Toe D/S
Pn Normal stress
Heel U/S
Pn Normal stress
18
v 6e
Pn (Toe ) (1 )
Bw Bw
v 6e
Pn ( Heel ) (1 )
Bw Bw
Normal stress –
Heel U/S Toe D/S
e < Bw/6
19
Normal stress –
U/S Toe D/S
e = Bw/6 Heel
v 6e 2v
( Pn )Toe (1 )
Bw Bw Bw
Normal stress –
Normal Heal U/S
Pn stress
Toe D/S
D/S R
e > Bw/6 1/3 Bw
20
Ten sion –۴
Heal U/S
e > Bw/6
U/S Normal stress
Heal
e ≤ Bw/6
1/3
1/3 x Bw/2
e ≤ Bw/6
Tension
v 6e
(Pn)Heal = (1 − )
Bw Bw
21
Gravity Dam Design
Qmax=AxV
V = C(RxS)1/2
–V
–C
–R
–S
S = (h U/S – h D/S)/ L
–R =A /P
22
A
( C ) = 1/n x R1/6
– V = C x (R x S)1/2
Q max = V x A
Q max
–V
23
A
Q max
Q max
m = 0.35 –m
g = 9.81 m/sec2 g
–Hs
– b(s)
Qmax
b(s) =
m . ඥ2g .H3/2
b(s)
Qmax
q=
b(s)
– Qmax
24
– b(s)
–q
Q max
B
qs= Q max
B
– qs
B
– Qmax
qs2 1
Rs = 1.35( ) 3
f
25
)Lacey’s silt factor f
Lacey’s silt factor
Material Average d50 size Silt factor f
(mm)
Very fine SILT 0.05 0.4
Fine SILT 0.12 0.5
Medium SILT 0.15 0.7
Standard SILT 0.32 1
Medium SAND 0.5 1.2
Coarse SAND 0.72 1.5
Fine GRAVEL 1.3 2
Medium GRAVEL 7.3 4.7
Heavy GRAVEL 26 9
Small BOULDERS 50 12
Medium BOULDERS 72 15
D = X (Rs − y)
X X
26
Severity factor
Location Severity
factor X
27
q = ᵩh1ඥ2g(TEL − h1 )
–q
g = 9.81 m/sec2 g
ᵩ = 0 97 – 0 95 ᵩ
– h1
U/S – TEL
T.E.L = H(s) + Hs
– H(s)
– Hs
28
q
h1 = 𝜑 ඥ2g (TEL−h1)
…..(1)
h1
h 1= 0
q
h1 = 𝜑 ඥ2g (TEL)
h 1-2 1 h1
q
h1-2 = 𝜑ඥ2g (TEL−h1)
…..(2)
h 1-3 h 1-2
q
h1-3 = 𝜑ඥ2g (TEL−h1−2)
…..(3)
h 1-4 h 1-3
q
h1-4 = 𝜑ඥ2g (TEL−h1−3)
…..(4)
h 1-5 h 1-4
q
h1-5 = 𝜑ඥ2g (TEL−h1−4)
…..(5)
h 1-6 h 1-5
q
h1-6 = 𝜑ඥ2g (TEL−h1−5)
…..(6)
h1
h1
29
h1 8 q2
H2 = [√1 + − 1]
2 q(h1) 3
– H2
– h1
–q
H2 > h 1
H2=h 1
30
H2 < h 1
H2 > h 1
H2< d + h
H2 – h < d
– H2
d
–h
L = Ld + LJ
L
– Ld
– LJ
31
LJ = 3 H2
H
U/S PTEL
Creep Length
bG 2 Hs2 1/2
= [ − 1]
Hs π Gc (πGcd2)2
π = 3.14 –π
32
Gc = 1/2 - 1/7 Gc
Gc = 0.5 - 0.143
– bG
– Hs
D/S Cut off wall – d2
2 1
d2 /Hs = ( )( bG 2 )
πGc ( ) (π Gc)2 +4
Hs
π = 3.14 –π
Gc = 1/2 - 1/7 Gc
Gc = 0.5 - 0.143
– bG
– Hs
D/S Cut off wall – d2
33
d2
Bw
Bw
∑M
X=∑
w
1/3
1/3 x Bw/2
e ≤ Bw/6
Bw
e= –x
2
Bw Bw
= −X
6 2
Bw Bw
X= −
2 6
3Bw − Bw
X=
6
2Bw
X=
6
34
Bw
X=
3
Bw ∑ M
=
3 ∑w
∑M
Bw ∑w
d2
D/S Cut off wall
bG
Bw
Bw = bG – L
35
ɣw = 1 T/m3
ɣs = 1.6 T/m3
𝜑𝑠 = 20°
– 𝜑𝑤 = 0°
∑W = (W1 + W2 … … . . +Wn) − Uw
𝜑
P𝑤 = 0.5 𝐻𝑠 2 ɣ𝑤 𝑡𝑔2 (45° + )
2
𝜑
𝑃𝐸2 = 0.5 𝐻𝑠 2 ɣ𝑠 𝑡𝑔2 (45° + )
2
1
Uw = (C. ɣw. Hs.Bw)
2
C=1 –C
Toe
36
F.S = 1.5-2.0
∑M Resistance moment
F. S = > (1.5 − 2.0 )
∑M over turning moment
μW
F.S against sliding =
Pw
µ= 0.65 – 0.75 µ
Bw
e= −X
2
Toe –e
Toe –X
– Bw
37
X
Bw
X= −e
2
∑W = W1 + ⋯ + Wn
∑M
38
Toe
∑W 6e
Pn (Toe) = δmin = (1 − )
Bw Bw
Heel
∑W 6e
Pn (Heel) = δmax = (1 + )
Bw Bw
P
Uplift pressure
∑W = W1 + ⋯ + Wn − U
39
∑M
X
∑M
𝑋=
∑W
Bw
e= −X
2
Toe
∑W 6e
Pn (Toe) = δmax = (1 + )
Bw Bw
Heel
∑W 6e
Pn (Heel) = δmin = (1 − )
Bw Bw
40
41
1.5 m 6m
C=1 20 KN/m 3
42
b m
𝑊₁ = 1.5 × 6 × 20 = 𝑘𝑁
1
𝑊2 = (𝑏 − 1.5)6 × 20 = 60(𝑏 − 1.5)
2
𝑤𝐻 2 9.81(6)2
𝑃= = = 176.58 𝑘𝑁
2 2
1 1
𝑈= 𝑐𝑤𝐻. 𝑏 =
× 1 × 9.81 × 6𝑏 = 29.43𝑏
2 2
Σ𝑊 = 180 + 60(𝑏 − 1.5) − 29.43𝑏 = 90 + 30.75𝑏
43
Toe
ΣM
𝑋=
ΣW
2 2
180(𝑏 − 1.5 + 0.75) + 60(𝑏 − 1.5) (𝑏 − 1.5) − 176.58 × 2 − 29.43𝑏 𝑏
= 3 3
90 + 30.57𝑏
For no tension to develop, e should be equal to b/6
𝑏 𝑏 𝑏
−𝑋= or X=
2 6 3
Hence,
𝑏 180(𝑏 − 0.75) + 40(𝑏 − 1.5)2 − 353.16 − 19.62𝑏2
=
3 90 + 30.57𝑏
From witch, we get 𝑏2 − 2.944𝑏 − 39.074 = 0
Hence, 𝑏 ≅ 4.95 𝑚
Check for crushing:
ΣW = 90 + 30.57b = 90 + 30.57 × 4.95 = 241.322 kN
2 ΣW 2(241.322)
(Pn)max = = = 97.5 kN/m2 < 1800 kN/m2 OK
b 4.95
Check for sliding:
𝜇ΣW 0.6 × 241.322
𝐹. 𝑆 = = = 0.82
𝑃 176.58
Hence the dam is unsafe against sliding.
If a minimum factor of safety of 1 is required under condition of
uplift, we have
𝜇ΣW=P
0.6(90 + 30.57𝑏) = 176.58 from wich b = 6.683 m
44
What will be the base width in the dam of Example is neglected?
Investigate the corresponding stability conditions.
𝑊₁ = 1.5 × 6 × 20 = 𝑘𝑁
1
𝑊 2 = (𝑏 − 1.5)6 × 20 = 60(𝑏 − 1.5)
2
𝑤𝐻 2 9.81(6) 2
𝑃= = = 176.58 𝑘𝑁
2 2
𝑏 180(𝑏−0.75)+40(𝑏−1.5)2 −353.16
=
3 90+60𝑏
45
𝑏2 + 1.5𝑏 − 19.908 = 0
Hence, 𝑏 = 3.774 𝑚.
Check for crushing:
ΣW = 90 + 60b = 90 + 60 × 3.774 = 316.44 kN
2 ΣW 2(316.44) kN kN
(Pn)max = = = 167.7 < 1800 Hence safe.
b 3.774 m2 m2
46
6m
1.5 m
4.5m
Toe
C =1 ⍴= 2.4
a - Reservoir empty
∑W 6𝑒 423.8 6 × 0.625
(Pn)Toe = (1 − ) = (1 − ) = 𝟏𝟓. 𝟕 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5
∑W 6𝑒 423.8 6 × 0.625
(Pn)Heel = (1 + ) = (1 + ) = 𝟏𝟕𝟐. 𝟕 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5
48
b - Reservoir full
∑M
X=
∑W
211.9 × 3.75 + 211.9 × 2 − 132.435 × 3 − 176.58 × 2
=
291.365
= 1.606 m
𝑏 4.5
𝑒= −𝑋 = − 1.606 = 0.644 m
2 2
∑W 6𝑒 291.365 6 × 0.644
(Pn)Toe = (1 + ) = (1 + ) = 𝟏𝟐𝟎. 𝟑 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5
∑W 6𝑒 291.365 6 × 0.644
(Pn)Heel = (1 − ) = (1 − ) = 𝟗. 𝟏 𝐤𝐍/𝐦𝟐
b 𝑏 4.5 4.5
49