C 21/05/2016 REPLY TO REF. NO.

QIAO YING WANG XIANGZHI WANGXIANGZHI DING TAO


DH3E-L-A3-SC-M-160506-0193
B 2/03/2016 REVISED AS PER REF. NO. QIAO YING WANG XIANGZHI WANG XIANGZHI
DING TAO
DH3E-L-A3-SC-M-160108-001

A 17/11/2015 ISSUED FOR QIAO WANG WANG DING TAO


APPROVAL YING XIANG XIANGZHI
ZHI
REVISIONS AND PREPARED CHECKED REVIEWED APPROVED
REV. DATE
RECORD OF ISSUE

OWNER
POWER GENERATION CORPORATION 1
THERMAL POWER PROJECT MANAGEMENT BOARD 3
OWNER’S ENGINEER

POWER ENGINEERING CONSULTING JOINT


STOCK COMPANY 2

CONTRACTOR
SUMITOMO CORPORATION
SUB-CONTRACTOR ORIGINATOR

DUYEN HAI 3 EXTENSION CONTRACT No.:


PROJECT NAME: THERMAL POWER PLANT
PROJECT DH3EXT-25112014

SPEC No. :
SPEC NAME:

DOCUMENT TITLE:

COMPRESSED AIR OPERATING AND DESIGN CONDITION

ORIGINATOR DOCUMENT NO.: Rev.:


184824.58.1800.1203
C

PROJECT DOCUMENT NO.: Rev.:


DH3E-QEA-M-B&V-1203
C
COMPRESSED AIR OPERATING AND DESIGN
CONDITION

DUYEN HAI 3 EXTENSION


THERMAL POWER PLANT PROJECT

B&V CALCULATION NO. : 184824.58.1800.1203 REV. C

Revisions
PREPARED CHECKED APPROVED
REV ISSUE DATE DESCRIPTION
BY BY BY
WANG
A 17/NOV/2015 ISSUED FOR APPROVAL QIAO YING DING TAO
XIANGZHI
B 02/MAR/2016 REVISED AS PER REF. NO. DH3E-L-A3-SC-M-160217-005 QIAO YING WANG XIANGZHI DING TAO

C 21/MAY/2016 REPLY TO REF. NO. DH3E-L-A3-SC-M-160506-0193 QIAO YING WANG XINAGZHI DING TAO
6
Client Sumitomo Corporation/Owner- Prepared By Qiao, Ying
EVNGENCO1-TPMB3 Date 2-May-2016 Rev C
Project DUYEN HAI 3 Extension Thermal Checked By Jing, Zhi
Power Plant Project Unit 3Ext Date 22-May-2016
Project No. 184824 Page 2 of 6
File No. 58.1800.1203
Title Compressed operating and design
condition

1.0 Purpose:

To determine the operating and design condition for compressed air system.
2.0 Reference
1. Calculation DH3E-QEA-M-B&V-1202, Compressed Air System Pressure Drop, Rev. B
2. EPC contract
3. ASME B31.1 Power Piping, 2012 Edition
4. ASME B36.10M Welded and Seamless Wrought Steel Pipes, 2004 Edition.
5. ASME B36.19M Stainless Steel Pipe, 2004 Edition.

3.0 Design Basis:

Per EPC contract, the steel pipe corrosion allowance is 1.5mm.

ASME A312 TP304 stainless steel pipe will be used for instrument air system and A106B carbon steel pipe will be
used for service air system

4.0 Define of Units and Constant:

3
m
ncmm := Normal Cubic Meter per Minute (@ 0oC, 1 atm)
min

3
m
ncmh := Normal Cubic Meter per Hour
hr

3
m
scmm := Standarad Cubic Meter per minute (@ 70o F, 14.7 pisa )
min

Convert Temperature from Celsius to Kelvin


 Tc + 273.15 ⋅ K
Tck ( Tc ) :=   6
C  ksi = 6.895 × 10 Pa
6
Pga ( Pg) := Pg + 1atm MPa = 1 × 10 ⋅ Pa

5.0 Conclusion

The summary of operating and design conditions are listed below,

Instrument air pipe before air dryer and service air piping

Operating Pressure 8.5 Bar_g


Design Pressure 10.5 Bar_g
Test Pressure 12.6 Bar_g
Operating Temperature 46 o C
Design Temperature 55 o C
Piping Material A106B STD for pipe diamter greater than 50mm,
A106B XS for pipe diamter less and equal to 50mm
Client Sumitomo Corporation/Owner- Prepared By Qiao, Ying
EVNGENCO1-TPMB3 Date 2-May-2016 Rev C
Project DUYEN HAI 3 Extension Thermal Checked By Jing, Zhi
Power Plant Project Unit 3Ext Date 22-May-2016
Project No. 184824 Page 3 of 6
File No. 58.1800.1203
Title Compressed operating and design
condition

Instrument air pipe after air dryer


Opearing Pressure 8.5 Bar_g
Design Pressure 10.5 Bar_g
Test Pressure 12.6 Bar_g
Operating Temperature 46 o C
Design Temperature 55 o C
Piping Material A312 TP304 SCH 10S

6.0 Analysis:
Assumption
Based on B&V experience, a margin of 6C will be added to the maximum expected temperature and rounded up to
the nearest 5C increment to determine the design temperature . And a margin of 170kPag will be added to the
operating pressure and rounded up to the nearest 50 kPag increment to determine the design pressure.
1. Operating Temperature and Pressure
The operating temperature and operating pressure will be defined as the maximum sustained
normal coincident temperature and pressure that act on a system during expected operating
scenarios.

The closed cycle cooling water inlet pressure is 38C

Confirmed with the air compressor supplier, compressed air maximum discharge temperature is considered as closed
cycle cooling water inlet pressure plus 8C

Therefore, the compressed air operating temperature is

Toper := 38C + 8C = 46 C
Per Ref 1, the air compressor rated pressure is
Poper := 8.5bar gauge pressure
it is considered as the compressed air operating pressure

2. Design Temperature and Pressure


Based on B&V experience, a margin of 6C will be added to the maximum expected temperature and rounded up to
the nearest 5C increment to determine the design temperature . And a margin of 170kPag will be added to the
operating pressure and rounded up to the nearest 50 kPag increment to determine the design pressure.

Therefore, the design temperature of compressed air is

 Toper + 6C  ⋅ 5C
Tdesign := ceil  
 5C 
Tdesign = 55 C

The design pressure of compressed air is

 Poper + 170kPa  ⋅ 50kPa


Pdesign := ceil  
 50kPa 

Pdesign = 10.5 ⋅ bar gauge pressure


Per Assumption 1, the set pressure of the air compressor safety valve is
Client Sumitomo Corporation/Owner- Prepared By Qiao, Ying
EVNGENCO1-TPMB3 Date 2-May-2016 Rev C
Project DUYEN HAI 3 Extension Thermal Checked By Jing, Zhi
Power Plant Project Unit 3Ext Date 22-May-2016
Project No. 184824 Page 4 of 6
File No. 58.1800.1203
Title Compressed operating and design
condition

Pset := 9bar gauge pressure

Therefore, choose the bigger one as the design pressure


Pdes := 10.5bar gauge pressure
3. Test Pressure
Per Ref 3, the test pressure is 1.2 times the design for pneumatic test.

Ptest := 1.2 ⋅ Pdesign

Ptest = 12.6 ⋅ bar gauge pressure

4. Piping
Per Design Basis, ASME A312 TP304 stainless steel pipe will be used for instrument air system and A106B carbon
steel pipe will be used for service air system.

4.1 Minimum wall thickness


Per Equation 7 of Ref 3, the minimum required wall thickness is

Pdesign ⋅ Do
tm := +A
2( SE + Pdeign ⋅ y)

Where, Do Outsidse diamater of pipe, mm

SE Maximum allowable stress in material due to internal pressure and joint


efficiency at the design temperature

For material A106B,

SEcs := 20ksi At design temperature, per Ref 3, Appendix A, Table A-1

8
SEcs = 1.379 × 10 Pa

For material A312 TP304,

SEss := 16.7ksi At design temperature, Per Ref 3, Appendix A, Table A-3

8
SEss = 1.151 × 10 Pa

y := 0.4 Coefficient, value as given in Per Ref 3, Table 104.1.2(A)

A := 1.5mm Corrosion and/or erosion allowance, mm, it is 1.5mm per design basis

The minimum pipe wall thickness of carbon steel pipe diameter less than or equal to 50mm will choose Sch XS,
the minimum pipe wall thickness of carbon steel pipe diameter greater than 50mm will choose Std wt, the
minimum pipe wall thickness of stainless steel pipe A312 pipe will choose Sch 10.
Client Sumitomo Corporation/Owner- Prepared By Qiao, Ying
EVNGENCO1-TPMB3 Date 2-May-2016 Rev C
Project DUYEN HAI 3 Extension Thermal Checked By Jing, Zhi
Power Plant Project Unit 3Ext Date 22-May-2016
Project No. 184824 Page 5 of 6
File No. 58.1800.1203
Title Compressed operating and design
condition

Per Ref 4 and Ref 5, the pipe nominal diameters, pipe outside diameters, wall thickness of A106 B XS or STD pipe,
and A312 TP304 10S pipe are as follows,

i := 1 .. 7
Dnomi := Doi := Tcsnomi := SCHcsi := Tssnomi := SCHssi :=

450mm 457mm 4.55mm XS 2.77mm 10S


500mm 508mm 5.54mm XS 2.77mm 10S
65mm 73mm 5.16mm STD 3.05mm 10S
80mm 88.9mm 5.49mm STD 3.05mm 10S
100mm 114.3mm 6.02mm STD 3.05mm 10S
150mm 168.3mm 7.11mm STD 3.4mm 10S
200mm 219.1mm 8.18mm STD 3.76mm 10S

The required minimum wall thickness of A106B pipe is calculated per Ref 3 Equation 7,

Pdesign ⋅ Doi
tmcs i := +A
2( SEcs + Pdesign ⋅ y)

The required minumn wall thickness of A312 TP 304 pipe is calculated per Ref 3 Equation 7,

Pdesign ⋅ Doi
tmss i := +A
2( SEss + Pdesign ⋅ y)

4.2 The negative tolerance of pipe wall thickness is considered as 12.5%

The design nominal pipe wall thickness of A106B pipe are as follows,

tmcs i
tdcsi :=
1 − 12.5%

Dnomi := Tcsnomi = SCHcsi :=


tdcsi =
4.55 ⋅ mm
3.697 ⋅ mm 25mm XS
5.54
3.918 50mm XS
65mm 5.16 STD
2.031
80mm 5.49 STD
2.1
100mm 6.02 STD
2.21
150mm 7.11 STD
2.444
200mm 8.18 STD
2.665

Therefore, the design pipe wall thickness is less than the wall thickness of A106 B XS/STD pipe.A106B Sch XS
pipe is selected for other instrument air pipe and service air pipe that diamater less than or equal to 50mm, A106B
Sch STD pipe is selected for the other instrument air pipe and service air pipe that diamter greater than 50mm.
Client Sumitomo Corporation/Owner- Prepared By Qiao, Ying
EVNGENCO1-TPMB3 Date 2-May-2016 Rev C
Project DUYEN HAI 3 Extension Thermal Checked By Jing, Zhi
Power Plant Project Unit 3Ext Date 22-May-2016
Project No. 184824 Page 6 of 6
File No. 58.1800.1203
Title Compressed operating and design
condition

The design nominal wall thickness of A312 TP304 pipe are as follows,

tmss i
tdssi :=
1 − 12.5%

tdssi = Dnomi = Tssnomi = SCHssi :=


4.087 ⋅ mm 25 ⋅ mm 2.77 ⋅ mm
10S
4.352 50 2.77
10S
2.093 65 3.05 10S
2.176 80 3.05 10S
2.308 100 3.05 10S
2.588 150 3.4 10S
2.852 200 3.76 10S

Therefore, the design pipe wall thickness is less than the wall thickness A312 TP304 10S pipe. A312 TP304
Sch 10 pipe is selected for instrument air supplying pipe after air dryer.