crossing.
11. GIS area mapping has been done for charged network, however Recommendation
additional data feedinq/mappinQ is in proi:iress.
SI No. Observation/Recommendation Remarks
12. Certificatio n for electrical installation from Electrical inspector are to Recommendation
be obtained for all installation s.
13. Odorants smell Survey at the farthest point is not being carried out in line Recommendation
with Appendix II of the List of Critical Activities of the PNGRB Regulations
2020. The Odorization is in manual mode. Odorization to be kept in auto
mode
14. Integrity inspection system for GI riser piping forming part of tertiary Recommendation
network and the last mile connectivity is not bE!ing carried out at present
in line with Appendix II of the List of Critical Activities of the PNGRB
Regulations 2013. Same may be carried out regularly.
15. Entity must develop, implement, and maintain a written training plan to Recommendation
instruct all CNG station personnel in native language with respect to the
matters specified in paragraphs 19.2.1 to 19.3.
16. First aid training is yet to be provided to all employees and staff. Recommendation
17. Functional check record for a. flame and leak detection for CNG Recommendation
compressor b. automatic CO2 flooding unit c. Active and monitor
regulator of DRS to be carried out periodically.
18. Illumination Survey to be carried out regularly at all locations Recommendation
19. QRA report (Doc no. TSC-IOCL/TE-013554-QRA-Ol) has been reviewed. Recommendation
Recommendations were given at cl no. 9.0 under conclusion and risk
reduction measures. Mitigation and tracker sheet need to be developed
for monitor implementation status.
20. HAZOP report no. TSC-IOCI-TEPL-P.013554-HAZOP-01 dated 03.02.2021 Observation
has been reviewed. Recommendations were given at Cl no. 13.0 under
summary of recommendations under Table 2: Recommendation table.
The entity confirmed that action has been taken as per HAZOP study
action and response sheet for most of recommendations, Balance
recommendations will be taken in due course of time as and when
required .
21. 66 KMs steel pipeline has been laid starting from august ' 2019. 46 KMs Recommendation
steel pipeline has already been commissioned. Presently, steel line is
protected by TCP and TCP design life is 2 years. Action needs to be initiated
for providing Permanent Cathodic Protection on urgent basis .
22. Patrolling of Steel pipeline is being done daily and Patrolling of MOPE Recommend ation
pipeline is being done daily through bike monitored by third party APP.
Periodic foot patrolling should also be done as per Regulation
23. PSP level measured at TLP at CGS, Sasaram are found as (-) 1.045V Recommendation
(protected) and(-) 0.580Vacross insulating joint which is in order however
PSP measured for zinc anode is found as(-) 0.8.96 V.
As per PSP MONITORING REPORT, DTD 20.6.22 PSP LEVEL OF many
Magnesium and Zinc anodes are found to be low as remarked. Anode
condition needs to be reviewed to take approp'riate action.
AC induced voltage records are not included PSP monit oring report which
needs to be included.
24. TLP no., chainage no., TLP type, and circuit diagram are not available in Recommendation
TLP. These need to be inco porated in TLP.
~
~);- /
SI No. - Observation/Recommendation Remarks
25. Due date of hydrotest of st ationary cascade cylinder at Golden RO will be Recommendation
expired in Dec 2022. Action for hydrotesting needs to be taken for
hydrotest of all such cylinders.
26. Hydrotest history records such as cylinder/vessel number/ due date/ date Recommendat ion
of testing etc. of all cylinders and vessels need to be maintained.
27. PESO approval has not been taken for the Steel Pipeline. The same needs Recommendation
to be taken at the earliest.
28:. IMS policy and head of Integrity management are not available presently Recommendat ion
in IMS manual and the same needs to be incorporated.
29. Earth pits to be provided in line with IS-3043 and Earthing Layout drawing Recommendation
shall be available at all locations. Earthing layout to be displayed at all
locations.
30. Gas Reconciliation on volume basis has been carried out on monthly basis. Observation
Checked the report and found in order.
31. Odorization is in manual mode. Odorization to be kept in auto mode in Recommendation
line with Append ix-I of PNGRB T4S Regulations 2008
32. Management of change procedure has been prepared. The document is Recommendation
good, however, approving authority etc to be added in the procedure .
(A) CITY GATE STATION and CNG Mother station, Gotpa (DT-21.11.2022).(AL1 )"(l7)'!o-. ~J (2.l• l\ -ut, J
33. Flow direction, Pipe dia., Grade, Wall Thickness, Design Pressure to be Observation
displayed at all locations, wherever aboveground piping syst em exists.
34. MSDS of Spotleak has not been displayed. MSDS of Natural Gas is not as Recommendation
per revised regulation.
35. SOP, Do's and Don'ts and spill management for odoriser unit is not Recommendation
displayed. Spill kit quantity needs to be checked for adequacy.
36. Eye wash shower near odorizing system is not available. Recommendation
37. CNG Compressor Area: Recommendation
I. Compressor enclosure has single earthing
11. Door limit switch was available, however interlocking has been
by-passed.
111. Almost 90% of allen bolts for FLP control panel inside
compressor enclosure are found missing.
IV. One of the door hinge and door lat ch of compressor enclosure
found broken .
V. Door gasket is found to be damaged.
VI. Lot of oil spillage is found inside compressor.
VII. Vent line of compressor has 90-degree bend and not of yellow
color.
.. ~-
Corrective actions for above points need to be taken.
38. Earth resistivity measurement for EP-03 and EP-12 was checked and Recommendation
,, verified. Readings are: ❖
I.•