afXZaAT/ Notification fin yf no i awry geretrare niue or eee erage (8) a Sa” No. OPTG/SECR/Chg/NI & Block/107/22 Dated 20.09.2022 Sub: Pre-NI/NI programme for 4th line connectivity at IB station over RIG-ISG sections of Bilaspur Division in SECR. Ref: i.) Sr.DOM/ BSP/SECR’s L. No. P/PNI-NI/4th line/JSG-BSP/1B/22/13, dated 15.09.22, ii.) RB's COIS Msg. No. DTP/2022/09/17, dated 20.09.2022 In reference to the above, Pre-NI/NI programme for 4th line connectivity at IB station over RIG- JSG sections of Bilaspur Division is permitted. The details are as under:- Item |, Remark Brief description of scope of work | 4” li ty at HGR over RIG-ISG section. Duration of} gsso-— Pre-NI/NI Station T Ths (0 to +3) 2609.22 to 29.08.2: 01. | Train No. 12130 (HWH-PUNE) Exp. JCO Ex. HWH from 21.09.22 to 28.09.22. | 02. | Train No. 12129 (PUNE-HWH) Exp. JCO Ex. PUNE from 21.09.22 to 28.09.22. 03, | Train No. 18109 (TATA-I ICO Ex. TATA from 22.09.22 to 29.09.22. (04. | Train No. 18110 (ITR-TAI CO Ex. ITR from 22.09.22 to 01.10.22. 05. | Train No. 12810 (HWH-CSMT) Mail JCO Ex. HWH from 21.09.22 to 28.09.22. (06, | Train No. 12809 (CSMT-HWH) Mail JCO Ex. CSMT from 21.09.22 to 28.09, (07. | Train No. 18113 (TATA-BSP) Exp. JCO Ex. TATA from 21.09.22 to 28.09.22. 08. | Train No. 18114 (BSP-TATA) Exp. JCO Ex. BSP from 22.09.22 to 29.09.22. (09. | Train No. 12860 (HWH-CSMT) Exp. JCO Ex. HWH from 22.09.22 to 29.09.22. 10, | Train No. 12859 (CSMT- HWH) Exp. JCO Ex. CSMT from 21.09.22 to 28.09.22. | [1] Train No, 18030 (SHM-LTT) Exp. JCO Ex. SHM from 21.09.22 to 28.09.22. 12, | Train No, 18029 (LTT-SHM) Exp. JCO Ex. LTT from 21.09.22 to 28.09.22. 13, | Train No, 18477 (PURI-YNRK) Exp. JCO Ex. PURI from 21.09.22 to 28.09.22. 14, | Train No. 18478 (YNRK-PURI) Exp. JCO Ex. YNRK from 21.09.22 to 28.09.22 15. | Train No. 13287 (DURG-RIPB) Exp. JCO Ex. DURG from 22.09.22 to 29.09.22. 16. }288 (RIPB-DURG) Exp. JCO Ex. RIPE from 21.09.22 to 28.09.22. | | 17. | Train No. 08861 (G-ISG) MEMU Pass. Spl. JCO Ex. G from 21.09.22 to 28.09.22. 18. | Train No. 08862 (15G-G) MEMU Pass. Spl. JCO Ex. JSG from 22.09.22 to 29.09.22. | 19. [Train No. 12262 (HWH-CSHIT) Duranto Exp. ICO Ex HWH on 23.09.22, 26.09.22, 27.09.22 & 280322. | 20. | Train No. 12261 (CSMT-HWH) Duranto Exp. JCO Ex. CSMT on 24.09.22, 27.09.22, 28.09.22 & 29.09.22. | 21, | Train No. 12222 (HWH-PUNE) Duranto Exp. JCO Ex. HWH on 22.09.22, 24.09.22 & 29.09.22. 22. | Train No. 12221 (PUNE-HWH) Duranto Exp. JCO Ex. PUNE on 24.09.22, 26.09.22 & 01.10.22. 23. | Train No. 22846 (HTE-PUNE) Exp. ICO Ex HTE on 23.09.228260922 24, | Train No. 22845 (PUNE-HTE) Exp. JCO Ex. PUNE on 25.09.22 & 28.09.22. 25. | Train No. 12880 (BBS-LTT) Exp. CO Ex. BBS on 22.09.22, 26.09.22 & 29.09.22, |__| 26. | Train No, 12879 (LTT-BBS) Exp. JCO Ex. LTT on 24.09.22, 28.09.22 & 01.10.22. | 27.| Train No. 17007 (SC-DBG) Exp. JCO Ex. SCon 24.09.22 & 27.09.22. 28.| Train No. 17008 (DBG-SC) Exp. JCO Ex. DBG on 27.09.22 & 30.09.22. — item [Remark Sub: Pre-NI/NI programme for 4th line connectivity at |B station over RIG-ISG sections of Bilaspur Division in SECR, lz[g| Repercussions on coaching operations:- Cancellation of trains during PNI/NI Train No, 20828 (SRC-JBP) Exp. JCO Ex. SRC on 21.09.22 & 28.09. Train No, 20827 (JBP-SRC) Exp. JCO Ex. JBP on 22.09.22 & 29.09.22. Train No, 20822 (SRC-PUNE) Exp. JCO Ex. SRC on 24.09.22. Train No. 20821 (PUNE-SRC) Exp. JCO Ex. PUNE on 26.09.22, - | Train No, 12905 (PAR-SHM)Exp. JCO Ex PBR on 21.09.22, 22.09.22, 28,09.22 & 29.09.22. Train No. °B ) ExSHI 30.09.2; 0. Train No. 22905 (OKHA-SHM) Exp. JCO Ex. OKHA on 25.09.22 36, | Train No. 22906 (SHM- OKHA) Exp. JCO Ex. SHM on 27.09.22. 37. | Train No. 13425 (MLDT-ST) Exp. JCO Ex. MLDT on 24.09.22. 38. | Train No. 13426 (ST-MLDT) Exp. JCO Ex. ST on 26.09.22 39, | Train No, 12151 (LTT-SHM) Exp. JCO Ex. LTT on 21.09.22, 22.09.22 &28.09.22. 40, | Train No, 12152 (SHM- LTT) Exp. JCO Ex. SHM on 23.09.22, 24.09.22 & 30.09.22. 41 | Train No, 22830 (SHM-BHUS) Exp. JCO Ex. SHM on 24.09.22. 42, | Train No. 22829 (BHUI-SHM) Exp. JCO Ex. BHU! on 27.09.22. 43, | Train No. 12767 (NED-SRC) Exp. JCO Ex. NED on 26.09.22, 44, | Train No. 12768 (SRC-NED) Exp, JCO Ex. SRC on 28.09.22. 45, | Train No. 22512 (KYQ-LTT) Exp. JCO Ex. KYQ.on 24.09.22, 48, | Train No. 22844 (PNBE-BSP) Exp. JCO Ex. PNBE on 25.09.22. 49. | Train No. 22894 (HWH-SNSI) Exp. JCO Ex. HWH on 22.09.22 & 29.09.22. Train No. 08186 (DURG-HTE) Exp. JCO Ex. DURG on 23.09.22, 28.09.22 & 30.09.22. ‘Train No. 20971 (UDZ-SHM) Exp. JCO Ex. UDZ on 24.09.22. [i lo. SHN Exp. JCO Ex. SHM on 25.09.22. Train No. 17005 (HYB-RXL) Exp. JCO Ex.HYB on 22.09.22. | 56. | Train No. 17006 (RXL-HYB) Exp. JCO Ex. RXL on 25.09.22. 57. | Train No, 22169 (RKMP-SRC) Exp. JCO Ex. RKMP on 21.09.22 & 28.09.22. 58. | Train No. 22170 (SRC-RKMP) Exp. CO Ex. SRC on 22.09.22 & 29.09.22. 59, | Train No, 12949 (PBR-SRC) Exp. JCO Ex. PBR on 23.09.22. 60. | Train No, 12950 (SRC-PBR) Exp. JCO Ex. SRC on 25.09.22, 61, | Train No. 12101 (LTT-SHM) Exp. JCO Ex. LTT on 23.09.22, 24.09.22, 26.09.22& 2709.22. | Train No. 12102 (SHM-LTT) Exp. JCO Ex. SHM on 25.09.22, 26.09.22, 28.09.22 & 29.09.22 Train No. 22866 (PURI-LTT) Exp. JCO Ex. PURI on 27.09.22. ‘Train No. 22865 (LTT- PURI) Exp. JCO Ex. LTT on 29.09.22. Train No. 20807 (VSKP-ASR) Exp. JCO Ex. VSKP on 23.09.22, 24.09.22 & 27.09.22. Train No. 20808 KP) Exp. JCO Ex. ASR on 24.09.22, 25.09.22 & 28.09.22. "] Train No. 17321 (VSG-ISME) Exp. JCO Ex. VSG on 23.09.22 shall be diverted via SC-GNT-BZA. " | DVD-BBS-SBPY-ISG in place of SC-K2I-BPO-G-BSP-1SG. Train No. 17322 (JSME-VSG) Exp. JCO Ex JSME on 26.09.22 shall be diverted via 15G-SBPY-BBS, /0-BZA-GNT-SC in place of JSG-BSP-G-BPQ-KZI-SC Others:- Running of trains beyond schedule like Kisan Spl. & Parcel Spl. etc. may be suitably diverted | or controlled during 22.09.22 to 29.09.22 = 08 days. Pope Dot Sub: Pre-NI/NI programme for 4th line connectivity at IB station over RIG-ISG sections of Bilaspur Division in SECR. (Su[tem [Remark V | Repercussions on Freight operations oe * (01 | With start of PNI on D-4 day, L/6 & L/7 shail be suspended till commissioning of Ni working at IB. 02 | Hence, Up trains Ex-ISG & ExcJSGR shall be dealt from existing Up main line L/5 or Dn outer joint ln |__| (03"tine).ty2 7 (03 | 03° line may be preferred for running of Up trains Ex ISG. 1. With commissioning of NI at IB, both L/No.-6 & L/No.-7 shall be made fit by Engg & OHE for running | of trains to 18-BRIN 04" line. : 7 2. IB-ISGR road bypass line will be made fot for running of normal traffic by both Engg & OHE at 18.00 hrs, Le, on completion of 10.00 hes block (Engg-07 hrs & OHE-03 hrs) from next day of commissioning of NI at IB for slewing/connection old bypass line to new bypass line near LC Gate -260, ballasting, alignment & taping and final fitment with T/Car-02 Nos EE 3. SBP bound (to/from) trains may run via JSG in lieu of existing bypass between IB-ISGR due to block. This will require power reversal at JSG or even brake marshall * | Restriction Trains Interchange would be affected by 7 to 8 trains with JSG (ex-CKP) & 5 to6 on loading, |__| with ISGR (to-SBP & ex-SBP) during PNI/N! at 18 ifany |. | Long haul formation in both Up & Dn directions may be done at BOCM circuit, BRIN or |__| at BPH stations also, oe [3] Only Non-banking trains will be received at IB station ex-CKP & ex-SBP. 4. 5. Through loaded trains ex-JSG may be suitably reduced. Running of long haul trains of empty rakes ex-Raipur to IB valley may be increased to (05 to 06 nos. daily from D-A to D: 1 loss of loading, 6. | Support will be required from ECoR in the form of returning all BOBRN rakes loaded from 1B valley for local sidings of SBP division including SEBD, MAVB, BPSL & MAL and 3 to 4 nos. of N/Box/E ex-SBP also. a) | Division to ensure site preparedness and adequate resources in terms of materials & manpower | 50 that there is no bursting of block and timeline. b) | Board's instructions with regard to availability of officres at the site may be ensur ©) | Division should take all necessary steps & precautions to ensure safe running of trains during execution of the work with minimum detention to trains. Psa A d) | The adjacent divisions are informed well in advance to ensure the effective utilization of shadow block for maintenance works. Deployment of officials of the concerned departments and executive agency at an appropriate level to minimize the effect on mobility and operations. All precautionary measures to prevent spreading of CORONA to be ensured so that NI is completed smoothly without compromising movement and safety of train movement and people working at the site maintaining social distancing. Wide publicity should be given for information to travelling public through news papers, electronic media, station notice boards and other available means. All concerned are requested to note and act accordingly. This issues with the approval of Railway Board. ow (R. J. Sharma) Dy.gOM(Chg.) Pape aof Sub: Pre-NI/NI programme for 4th line connectivity at IB station over RIG-JSG sections of Bilaspur Division in SECR. This Notification is addressed to: Bilaspur, Dated 20.09.2022. DRM ~ SECR ~ BSP, R & NGP. ‘Sr.DOM, Sr.DCM, Sr, DEE (G), Sr.DEE (OP), Sr DME, Sr.DEN (Co-ord) ~ BSP, R, NGP /SECR. Copy to CHC-Chg, Commi. Ctrl, CTLC, CDPC, CTXR-Cntrl, Engg. Control, CT! (Sfy), CTI (COIS) /HO, BSP, R & NGp. CFTM, CTPM, CCM (PS), CBE, CTE, CSTE, CRSE, CELE, CMPE, CEGE, CPRO, Sr.PRO /SECR-BSP, All PHODs ~ SECR/BSP. PCOMs/PCCMs :- All Zonal Railways. CPTMs:- All Zonal Railways for kind information & n/a please. DRMs:- CR/NGP, WCR/JBP, ECOR/SBP, SCR/SC & SER/CKP for kind information & n/a please. PED-Chg, PED (TT/M), DTT (G) / NORB} for kind information. Dir. T.7./Punctuality/NORB for kind information Secy. - SECR/BSP} for kind information of GM, AGM for kind information Page aot .

You might also like