Dust High Yes Yes Yes Prior to the Ensure that trained Project Site Engineer
29 Inhalation, commencement personnel will do the Manager
Foreign of the activity task. Supervisor
material Construction
House caught Provision for Personal Manager Foreman
Keeping inside the Protective Equipment
Cleaning Eye. such as, mask Site Manager Charge hand
intended for chemicals,
goggles and cover-all Workers
Chemical High Yes Yes Yes clothing.
exposure HSE Manager Helpers Medium
( Fume Ensure that a
inhalation ) personnel doing the
task is well familiar
with the chemical,
Material Safety Data
Sheets must be
reviewed thoroughly.
Provide proper
ventilation on the area.
Liquid Spill_ High Yes Yes Yes
Slip, Trip Barricade the area and
hazard immediately contain /
remove spill.
Platform should be
used to carry out minor
jobs at height less than
2 meters. Only one
person is allowed
working on step ladder
at a time.
Fall from High Yes Yes