Health Safety & Environment

GENERIC RISK ASSESSMENT

Assessors Name: Assessors signature: Location of Date of Review date:


Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Dust High Yes Yes Yes Prior to the  Ensure that trained Project Site Engineer
29 Inhalation, commencement personnel will do the Manager
Foreign of the activity task. Supervisor
material Construction
House caught  Provision for Personal Manager Foreman
Keeping inside the Protective Equipment
Cleaning Eye. such as, mask Site Manager Charge hand
intended for chemicals,
goggles and cover-all Workers
Chemical High Yes Yes Yes clothing.
exposure HSE Manager Helpers Medium
( Fume  Ensure that a
inhalation ) personnel doing the
task is well familiar
with the chemical,
Material Safety Data
Sheets must be
reviewed thoroughly.

 Provide proper
ventilation on the area.
Liquid Spill_ High Yes Yes Yes
Slip, Trip  Barricade the area and
hazard immediately contain /
remove spill.

 Platform should be
used to carry out minor
jobs at height less than
2 meters. Only one
person is allowed
working on step ladder
at a time.
Fall from High Yes Yes

RISK RATING MATRIX 1 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Health Safety & Environment

Assessors Name: Assessors signature: Location of Date of Review date:


Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

Height  Tool Box Talk should Low


be given prior
commencing the
House activity.
Keeping
Cleaning  Ensure that the person
doing the task is
mentally and physical
fit for the job.

Prolong skin High Yes Yes Yes  Provide Personal


exposure/co Protective
ntact of Equipment( Dust
chemical, mask, safety glass,
skin rubber gloves)
irritation
 Firefighting
equipment to be in
Fire place and accessible.

RISK RATING MATRIX 2 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09
Health Safety & Environment

Assessors Name: Assessors signature: Location of Date of Review date:


Method
task/operation being Task Carried assessment: Ongoing
Statement Action by
Sajimon KK assessed: out by? 15 January 09
by When?
Site
Ref No: Rev – 02 – RA – 2009 - Depa Cross reference to N.B. Residual risk:
SSOW/method Other on site The risk left
statement: (Highlight SSOW/Method statement control measures after all control
one below) Ref No: may be required measures have
Page No: due to weather been put in
YES NO M/S 001 conditions/other place – see
Risk Persons at risk reasons at time risk matrix at
severity of footer:
E C P Oth
(before task/operation:
Activity/ Significant ers
controls Control measures Work must not
Operation hazard
are in required: start until the
place) risks have
been assessed:

RISK RATING MATRIX 3 E = employees


C = contractors/subcontractors
Likelihood: 5 very likely 4 likely 3 fairly likely 2 unlikely 1 very unlikely P = Public
Severity: 5 catastrophic 4 major 3 moderate 2 minor 1 insignificant QMS – Rev – 02 – RA – 2009
Sajimon KK – January 09