This document outlines the details of an evacuation drill conducted at the BNP Paribas office in Goregaon, including:
1) Sections on evacuation details, sequences, and a briefing/evaluation. It lists 17 steps in the evacuation sequences and 15 points evaluated in the briefing.
2) Questions about staff awareness of exits, roles, and responsibilities, and whether security personnel were properly equipped and checked all areas.
3) Spaces to record the name of observer, total headcount, any accidents, and overall comments for improvement.
This document outlines the details of an evacuation drill conducted at the BNP Paribas office in Goregaon, including:
1) Sections on evacuation details, sequences, and a briefing/evaluation. It lists 17 steps in the evacuation sequences and 15 points evaluated in the briefing.
2) Questions about staff awareness of exits, roles, and responsibilities, and whether security personnel were properly equipped and checked all areas.
3) Spaces to record the name of observer, total headcount, any accidents, and overall comments for improvement.
This document outlines the details of an evacuation drill conducted at the BNP Paribas office in Goregaon, including:
1) Sections on evacuation details, sequences, and a briefing/evaluation. It lists 17 steps in the evacuation sequences and 15 points evaluated in the briefing.
2) Questions about staff awareness of exits, roles, and responsibilities, and whether security personnel were properly equipped and checked all areas.
3) Spaces to record the name of observer, total headcount, any accidents, and overall comments for improvement.
This document outlines the details of an evacuation drill conducted at the BNP Paribas office in Goregaon, including:
1) Sections on evacuation details, sequences, and a briefing/evaluation. It lists 17 steps in the evacuation sequences and 15 points evaluated in the briefing.
2) Questions about staff awareness of exits, roles, and responsibilities, and whether security personnel were properly equipped and checked all areas.
3) Spaces to record the name of observer, total headcount, any accidents, and overall comments for improvement.
Date Time Type of Drill Purpose of Drill Type of Building Building Code E1 Section -2 Evacuation Sequences Sr No Sequences 1 Alarm raised 2 All Staff evacuated from building and mustered at Assembly Point 3 Fire Marshall Response 4 Are the Fire Marshall aware their role and responsibilities ? 5 Is Fire Marshall Aware their nearest Exit route ? 6 Is Fire Marshall guide staff Properly? Are the Security Personnels Aware their Role and Responsibilities 7 during Emergency 8 Did Security Personnels help ERT for Evacuation Did Security Personnel Carry First Aid Box , Wheel chair etc with 9 them for further necessary help Are the security Personnel Properly check all Cabin ,Conference Room 10 , Cafeteria ,Washroom ,HUB Room etc 11 Emergency Exit Staircase free from any Obstacle (Yes/NO) 12 Proper Lighting and Ventilation inside Staircase (YES/NO) 13 Are the Staircase Pressurised (Yes/NO) 14 Any Incident during the Evacuation (Yes/NO) 15 Head count of all near Assembly Point 16 Emergency Completed 17 Is the Emergency Clear Siren raised 18 Over all Response time for Total Evacuation Section -3 Briefing & Evaluation 1 Overall response of all ERT Member 2 Response of Security Team 3 Communication at Assembly Point 4 Ambulance Call 5 Traffic Control and Crowd Management 6 All Staff are gather Assembly point as per decided Group 7 Mock drill was well Planned 8 Fire alarm Clear and audible at Assembly Point 9 Are the Fire Extinguisher Demo was well Planned 10 Are the Fire Hydrant Demo Was well Planned 11 Are the First aid or Rescue demo Well Planed 12 Are the Head Count taken 13 Total Headcount 14 Any Casualty or Accident During Evacuation Process 15 Any Other Observation or Comments for Improvement of drill Performanance Name of Observer Designation Company Sign Date & Time Evacuation Drill Report Location
Time Report Submit To ( Name ) Desig Date & Time Report Goregaon