BEAM MARK GRID LINE LENTH (M) DIMENSION (mm)

B D
2B -37 A-B 7.75 300 600
B-C 5.3 300 600
C-D 8.6 300 700
D-E 5.9 300 600
E-F 5.85 300 600
F-H 9.4 300 700
H-I 6.7 300 600
2B - 38 9 to 10 6.1 300 600
2B - 39 C' 0.3 400 600
C' - C 3.8 400 600
C-D 8.1 400 750
2B - 40 C -D 8.7 400 700
2B - 41 6- 4.2 300 600
2B - 42 D-F 11 300 800
2B - 43 SEE SCHEDULE POST TENSIONED BEAMS & GIRDERS
2B - 44 A-C 9.35 400 700
2B - 45 A-C 9 400 700
2B - 46 -1 3 400 800
1 to 3 8 400 800
2B - 47 SEE SCHEDULE POST TENSIONED BEAMS & GIRDERS
2B- 48 C 8 400 700
C-D 8 400 700
D - E" 5 400 700
E" - G' 12 400 800
G' - I" 6.6 400 700
I' - 2.25 300 600
2B - 49 -1 2.8 300 500
1 to 2 5.5 300 500
2 to 3 3.15 300 500
3- 2.2 300 500
2B - 50 -1 3 300 700
1 to 3 8 300 600
3 to 4 5 300 600
4 to 5 5 300 600
5 to 6 5 300 600
6 to 8 5 300 700
8 to 9 5 300 600
9 to 10 5 300 600
10 to 11 5 300 600
11 to 12 5 300 600
12- 1.2 300 700
2B - 51 1.2 300 700
2B - 52 SEE SCHEDULE POST TENSIONED BEAMS & GIRDERS
2B - 53 10 - 5.75 300 500
2B - 54 SEE SCHEDULE POST TENSIONED BEAMS & GIRDERS
2B - 55 -10 4.35 300 800
10' - 5.5 300 600
1.2 300 700
2B - 56 9'-10 7.7 300 600
10- 1.2 300 700
2B - 57 9' - 5.5 300 700
1.2 300 700
2B - 58 SEE SCHEDULE POST TENSIONED BEAMS & GIRDERS
2B - 59 -1 2.45 300 600
1 to 2 5.1 400 600
2 to 3 3.15 400 600
3 to 4 5 400 600
4 to 5 5 400 600
5 to 7 6.48 400 600
7 - 9' 5.95 400 600
9'- 0.65 300 700
SB -1 - 3.8 200 500

TYP. 3RD TO 5TH FLOOR BEAMS


3B - 1= MHB -1
3B - 2= 2B - 2
3B - 3= 2B - 3
3B - 4= 2B - 4
3B - 5 A-B 7.45 300 700
B-C 5.3 300 700
C-D 8.6 300 700
D-E 5.9 300 700
E-F 5.85 300 700
F- 9.8 300 700
-I 6.7 300 700
3B - 6 -1 4.3 300 700
1- 4.9 300 700
-4 8.4 300 700
4 to 5 5 300 700
5 to 7 6.5 300 700
7- 6.8 300 700
3B -7 2B - 7
3B -8 2B - 8
3B - 9 2B - 9
3B - 10 2B - 10
3B - 11 2B - 11
3B - 12 2B - 12
3B - 13 2B - 13
3B - 14 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B - 15 10- 6.4 300 500
3B - 16 A-B 6.5 300 500
3B - 17 A- 6.2 300 500
3B - 18 A-C 10.8 300 700
3B - 19 A-C 10.3 300 700
3B - 20 F-8 8.8 300 700
3B - 21 F- 7.8 300 600
-I 7.2 300 600
3B - 22= 2B - 22
3B - 23= 2B - 23
3B - 24= 2B - 24
3B - 25= 2B - 23
3B - 26= 2B - 24
3B - 27= 2B - 25
3B = 28 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B = 29 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B = 30 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B - 31= 2B - 29
3B - 32 D- 1.4 200 400
3B - 33 -I 3 200 500
3B - 34 C 7.8 300 600
C-D 8 300 600
D - E" 5 300 600
E" - G 12 300 800
G'- 5.2 300 600
3B - 35 2B - 34
3B - 36 2B - 36
3B - 37 2B - 36
3B - 38 A- 6.4 300 500
3B - 39 A-B 7.75 400 600
B-C 6.3 400 600
C-D 8.6 400 800
D-E 6.9 300 600
E-F 5.85 300 600
F-H 9.4 300 700
H-I 6.7 300 600
3B - 40 10- 7.5 400 700
3B - 41 A- 11 400 800
3B - 42 A-C 10.5 500 700
C-D 8.4 500 800
3B - 43= A-C 10.2 400 700
3B - 44= 2B - 41
3B - 45= 2B - 42
3B - 46= 2B - 43
3B - 47= 2B - 44
3B - 48= 2B - 45
3B - 49 -1 3 400 800
1 to 3 8 400 800
3B - 50 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B - 51 G-I
I-
3B - 52 G -I
3B - 53 -1 3 300 700
1 to 3 8 300 600
3 to 4 5 300 600
4 to 5 5 300 600
5 to 6 5 300 600
6 to 8 5 300 700
8 to 9 5 300 700
9 to 10 5 300 700
10 to 11 5 300 600
11 to 12 5 300 600
12- 1.2 300 700
3B - 54 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B - 55 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B - 56 -
-
3B - 57 2B - 56
3B - 58 2B - 57
3B - 59 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
3B - 60 -1 3.15 400 800
1 to 2 5.1 400 600
2 to 4 8.15 400 700
4 to 5 5 400 700
5 to 7 6.48 400 700
7 to 9' 5.96 400 700
9'- 0.65 300 700
3B - 61 C 8 400 700
C-D 8 400 700
D - E" 5 400 700
E"- G' 12 400 800
G' - I' 6.6 400 700
I'- 1.3 400 700
PENTHOUSE FLOOR BEAMS
PB - 1= MHB -1
PB - 2 -8 2.8 300 500
PB - 3 - 0.55 300 500
- 2.4 300 500
PB - 4 - 0.55 300 500
- 3.05 300 500
PB - 5 3- 2.5 300 500
-4 2.5 300 500
4- 2.55 300 500
PB - 6 -1 0.8 300 500
1- 2.1 300 500
PB - 7 -1 0.75 300 500
1- 4 300 500
PB - 8 -1 0.75 300 500
1- 4 300 500
PB - 9 2B -5 300 500
PB - 10 3B - 6 300 500
PB - 11 A- 2.55 300 500
PB - 12 C 6.2 300 500
PB - 13 C 6.6 300 500
PB - 14 C 7 300 500
PB - 15 3 to 4 4.9 400 700
4 to 5 5 400 700
5 to 6 5 400 700
PB - 16 = 3B - 12
PB - 17 = 3B - 13
PB - 18 = 3B - 14
PB - 19 -11 0.7 300 500
11- 3.3 300 500
PB - 20 - 0.8 300 500
-11 2.5 300 500
PB - 21 -10 2.7 300 500
PB - 22 - 2.4 300 500
-11 3.4 300 500
11-B 2.4 300 500
B- 0.5 300 500
PB - 23 10- 3.5 300 500
-B 0.7 300 500
B- 3.5 300 500
PB - 24 10 - 6.5 300 600
PB - 25 A-B 6.5 300 600
PB - 26 A-B 6.2 300 600
PB - 27 3B -18
PB - 28 A-C 10.3 400 700
PB - 29 A-C 10 400 700
PB - 30 F-G 6.65 300 500
PB - 31 9' - 9 3.2 400 600
PB - 32 F- 7.7 400 600
-1 7.4 400 600
PB - 33 2B - 20
PB - 34 2B - 21
PB - 35 G-I 8.15 400 600
PB - 36 G-I 8.1 400 600
PB - 37 G-I 7.6 400 600
PB - 38 G'- 7.6 300 600
PB - 39 2B - 28
PB - 40 SEE SCHEDULED OF POST TENSIONED BEAMS & GIRDERS
PB - 41 A-C 8.25 300 600
C-D 8 300 600
D - E" 5 400 600
E" - 12.65 400 800
PB - 42 3B - 34
PB - 43 G-I 7.9 300 700
I- 1.2 300 700
PB - 44 2B - 35 300
PB - 45 F -G 6.65 300 300
G-I 8.3 300 600
PB - 46 A-B 6.4 400 600