Professional Documents
Culture Documents
Practica
Practica
Practica
SUMA DE
TRAMO TUBERIA GASTOS GASTO Selecionar: DIAMETRO VELOCIDAD PERDIDAS
PIEZA SANITARIA GASTOS "Q" Prob. (3)(6)(9)(12) (Plgs) "V" (m/s) (m/m)
F C Parcial Total
C-2 C 2 Duchas 1.50 3.00
C 2 LM 0.75 1.50
C 1 Freg. 2.00 2.00
C 1 Batea 2.00 2.00
8.50 9.00 0.53 6 1 1.05 0.06
1-2 F 2 Duchas 1.50 3.00
3.00 3.00 0.20 3 3/4 0.70 0.04
2-3 F 1 Tr. 1-2 3.00 3.00
1 Tr. C-2 8.50 8.50
11.50 12.00 0.63 6 1 1.24 0.08
8-3 F 2 LM 0.75 1.50
1 WC 3.00 3.00
4.50 5.00 0.38 6 3/4 1.33 0.13
3-4 F 1 Tr. 8-3 4.50 4.50
F 1 Tr. 2-3 11.50 11.50
16.00 16.00 0.76 9 1 1.50 0.11
4-5 F 1 Tr. 3-4 16.00 16.00
F 1 WC 3.00 3.00
19.00 20.00 0.89 3 1 1/2 0.78 0.02
5-6 F 1 Tr. 4-5 19.00 19.00
F 1 Freg. 2.00 2.00
21.00 22.00 0.96 3 1 1/2 0.84 0.02
6-7 F 1 Tr. 5-6 21.00 21.00
1 Batea 2.00 2.00
1 Mang. 3.00 3.00
26.00 26.00 1.11 3 1 1/2 0.97 0.03
IDAS
OBS.
AF AC
Bañera 1.50 1.50
Batea 2.00 2.00
Bidet 0.75 0.75
Ducha 1.50 1.50
WC 3.00
WC (flx) 6.00
Freg. 2.00 2.00
Lavamano LM 0.75 0.75
Lavadora LV 3.00 3.00
Mang. (1/2") 2.00
TABLA PARA EL CALCULO DE TUBERIAS DE DISTRIBUCION DE AGUAS PARA EDIFICIOS. Coeficiente de Rugosidad 140
No Gasto Probable
(Lts/seg)
∅ V (m/s)
J (m/m) ∅ V (m/s)
J (m/m) ∅ V (m/s)
J (m/m) ∅ V (m/s)
J (m/m)
UDG Tabla 37 G.O. (3) Ec.
Willians-Hazen
(6) Ec.
Willians-Hazen
(9) Ec. Willians-
Hazen
(12) Ec. Willians-
Hazen
∅
TRAMOS PROBABLE Ø ACCESORIOS
DE GASTOS [lts/seg] [pulg]
"V" (m/s) (m/m) REAL (m) CANT L. EQ. Total Leq. TOTAL (mxm) (metros) (metros) de Piso Disponible
1 2 3 4 5 6 7 8 9 10 11 12
Según el trazado
Figuras 22, Figuras 22, 24 según
∅
de la red desde el
Tabla 33 Tabla 37 PERDIDAS
medidor, cada
24 o 26 G.O. o entre
26 G.O. 4045
trazado en ACCESORIOS (6+7) TOTALES
tuberia entre dos G.O. 4044 G.O. 4044 0,6 y 3 6x11
Tee o Tee y punto 4044 m/seg los planos
de consumo
7-6 26.00 1.11 1 1/2" 0.97 0.03 18.50 Compuerta 1 1/2" 1 0.27 0.27
CODO 90° 1 1/2" 1 1.34 1.34
Tee N 1 1/2" 2 0.85 1.70
0.03 18.50 - - 0.00 3.31 21.81 0.65 10.00 9.35 0.00 9.35
6-5 22.00 0.96 1 1/2 0.84 0.02 0.30 Tee N 1 1/2" 1 0.85 0.85
0.02 0.30 - - 0.00 0.85 1.15 0.02 9.35 9.32 0.00 9.32
4-5 20.00 0.89 1 1/2" 0.78 0.02 1.70 Tee N 1 1/2" 1 0.85 0.85
CODO 90° 1 1/2" 1 1.34 1.34
0.02 1.70 - - 0.00 2.19 3.89 0.08 9.32 9.24 0.00 9.24
4-3 16.00 0.76 1" 1.50 0.11 0.20 Red 1" 1 1/2" 1 0.52 0.52
Tee N 1" 1 0.52 0.52
0.11 0.20 - - 0.00 1.04 1.24 0.14 9.24 9.11 0.00 9.11
3-2 12.00 0.63 1" 1.25 0.08 0.20 Tee N 1" 1 0.52 0.52
0.08 0.20 - - 0.00 0.52 0.72 0.06 9.11 9.05 0.00 9.05
2-C 9.00 0.53 1" 1.05 0.06 1.30 Tee N 1" 1 0.52 0.52
0.06 1.30 - - 0.00 0.52 1.82 0.11 9.05 8.94 0.00 8.94
a ducha - - 0.00 2.00 8.94 6.94 0.00 6.94
- suma 3.06
- 2
CODO 90° 3
CODO 45° 4
Tee N 5
Tee RED. 6
Val.
Retencion 7
Compuerta 8
Paso 9
Angulo 10
LONGITUD POR CONEXION J x Lt H H (JxL)
GASTO DIAMETRO J unitaria LONGITUD Cota Presion
UNIDADES VELOCIDAD LONGITUD
∅
TRAMOS PROBABLE Ø ACCESORIOS
DE GASTOS [lts/seg] [pulg]
"V" (m/s) (m/m) REAL (m) CANT L. EQ. Total Leq. TOTAL (mxm) (metros) (metros) de Piso Disponible
1 2 3 4 5 6 7 8 9 10 11 12
Red 1/2"
11
Red 3/4"
12
Red 1" 13
Red
11/4" 14
Red
11/2" 15
Red 2" 16
Red
21/2" 17
Red 3" 18
Red 4" 19
Red 6" 20
Amp.
3/4" 21
Amp. 1" 22
Amp.
11/4" 23
Amp.
11/2" 24
Amp. 2" 25
Amp.
21/2" 26
Amp. 3" 27
Amp. 4" 28
Amp. 6" 29
Amp. 8" 30
LONGITUDES EQUIVALENTES E
DIAMETRO
mm Val.
pulg. - CODO 90° CODO 45° Tee N Tee RED. Compuerta Paso
Retencion
Red Red Red Red Red Red Red Red Red Red Amp. Amp. Amp. Amp.
Angulo
1/2" 3/4" 1" 11/4" 11/2" 2" 21/2" 3" 4" 6" 3/4" 1" 11/4" 11/2"
0.64
0.52
0.73
0.27 0.85 0.85 1.34
0.37 1.07 1.07
0.43 1.31
0.52
2.14
1.07