Achieved Till Last Week From 22- This Week From 28-11-2022 to 05- Next Week From 06-12-2022

Next Week From 06-12-2022 to 12-


11-2022 to 28-11-2022 12-2022 Up to Date Percentage 12-2022
Sr. Items Units Scope Remark
Achieved Completion
Previous Achieved Balance Plan Achieved Shortfall Plan
Till date Balance
COLUMNS ABOVE
1 NOS 287 281 6 0 0 0 281 98% 0 6
PLINTH BEAM (1st LIFT)

COLUMNS ABOVE
2 NOS 287 277 10 - 277 97% - 10
PLINTH BEAM (2nd LIFT)

COLUMNS ABOVE
3 NOS 89 72 17 - 72 81% - 17
PLINTH BEAM (3rd LIFT)

COLUMNS ABOVE
4 3.7MTR; 4.5MTR SLAB NOS 178 109 69 15 49 +34 158 89% 15 20
(1ST LIFT)

COLUMNS ABOVE 4.5MTR


5 NOS 120 40 80 15 4 -11 44 37% 15 76
SLAB (2ND LIFT)

COLUMNS ABOVE 4.5MTR


6 NOS 120 7 113 10 10 0 17 14% 10 103
SLAB (3RD LIFT)

COLUMNS ABOVE 7.5MTR


7 NOS 28 7 21 15 20 +5 27 96% 15 1
SLAB (1ST LIFT)

POUR 12 SHUTTERING AT
8 SQM 500 50 450 50 60 +10 110 22% 50 390
+9.5MTRS

POUR 12 STEEL AT
9 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+9.5MTRS

POUR 13 SHUTTERING AT
10 SQM 850 50 800 50 50 +0 100 12% 50 750
+7.5MTRS

POUR 13 STEEL AT
11 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+7.5MTRS

POUR 14 SHUTTERING AT
12 SQM 850 50 800 0 0 +0 50 6% 0 800
+7.5MTRS

POUR 14 STEEL AT
13 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+7.5MTRS

POUR 1 SHUTTERING AT
14 SQM 850 0 850 0 0 0 0 0% 0 850
+11.25MTRS

POUR 1 STEEL AT
15 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+11.25MTRS

MASONRY WORKS
16 CUM 1100 0 1100 0 0 0 0 0% 10 CUM 1100
GROUND FLOOR