Weekly Plan 06-12-22 TO 12-12-22
Weekly Plan 06-12-22 TO 12-12-22
Weekly Plan 06-12-22 TO 12-12-22
COLUMNS ABOVE
2 NOS 287 277 10 - 277 97% - 10
PLINTH BEAM (2nd LIFT)
COLUMNS ABOVE
3 NOS 89 72 17 - 72 81% - 17
PLINTH BEAM (3rd LIFT)
COLUMNS ABOVE
4 3.7MTR; 4.5MTR SLAB NOS 178 109 69 15 49 +34 158 89% 15 20
(1ST LIFT)
POUR 12 SHUTTERING AT
8 SQM 500 50 450 50 60 +10 110 22% 50 390
+9.5MTRS
POUR 12 STEEL AT
9 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+9.5MTRS
POUR 13 SHUTTERING AT
10 SQM 850 50 800 50 50 +0 100 12% 50 750
+7.5MTRS
POUR 13 STEEL AT
11 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+7.5MTRS
POUR 14 SHUTTERING AT
12 SQM 850 50 800 0 0 +0 50 6% 0 800
+7.5MTRS
POUR 14 STEEL AT
13 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+7.5MTRS
POUR 1 SHUTTERING AT
14 SQM 850 0 850 0 0 0 0 0% 0 850
+11.25MTRS
POUR 1 STEEL AT
15 MT 100% 0% 100% 0% 0% 0% 0% 0% 0 100%
+11.25MTRS
MASONRY WORKS
16 CUM 1100 0 1100 0 0 0 0 0% 10 CUM 1100
GROUND FLOOR