Materials Testing Monitoring

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 5

Project: ONE Site Project

Location: Golden Mile Business Park, Special Economic Zone, Governor's Drive, Carmona, Cavite
Owner: ON Semicon Philippines, Inc.
Subject: Materials Testing Monitoring Sheet - Concrete

COLUMN
No. of Sampling 7 Day Result (psi) (Passed
Design
Sample ID Supplier Structure Location Samples
Strength (psi) Date Time Date Tested
Taken

At GL B/5, D/7. ELEV 9:00am


A = 92.50 1
1/18/2009
At GL C/5, C/7. ELEV 9:25am
B = 92.50 1

9:35am
C-1 Readycon Column 5000.0 At GL D/5, D/7. ELEV 1/10/2009
C = 92.50 1 NI
At GL E/5, E/7. ELEV 9:45am
D = 92.50 1 NI
At GL F/5, F/7. ELEV 10:00am
E = 92.50 1 NI
At GL B/5, D/7. ELEV 10:15am
F = 92.50 1 NI

LEGEND:
C - Column
F - Footing
FTB - Footing Tie Beam
B - Beams
G - Girder
C-1 - First pouring in certain structure
C-2 - Second pouring
N.I. - Not included
C-1A, C-1B - Representative sample ID
7 Day Result (psi) (Passed/Failed) 14 Day Result (psi) (Passed/Failed) 28 Day Result (psi) (Passed/Failed) Condition

Theoretical Actual Date Tested Theoretical Actual Date Tested Theoretical Actual Slump (in) Weather Sampling Curing Handling

3450 NI NI NI NI 6 Fair Well done Well done Well done

3250 NI NI NI NI 5 Fair Well done Well done Well done

3250.00 1/25/2009 4500.00 5000.00


NI 4450 NI NI 4 Fair Well done Well done Well done

NI 4550 NI NI 5 Fair Well done Well done Well done

NI NI NI 5125 7 Fair Well done Well done Well done


2/7/2009
NI NI NI 5005 5 Fair Well done Well done Well done
Remarks

C-1 sample represents first pouring of the structure.


Estimated volume = 15.00 cu.m.

Refer specific location where the sample represented from


pouring request No. 05 at 14th day strength not meeting
the required strength but passed on the 28th day.
Project: ON Site Project
Location: Golden Mile Business Park, Special Economic Zone, Governor's Drive, Carmona, Cavite
Owner: ON Semicon Philippines, Inc.
Subject: Materials Testing Monitoring Sheet - Reinforcing Steel Bars

Test Result (Passed / Failed)

Nominal S1 S2
Batch Number Delivery Date Grade (ksi) Length (m) No. of pieces unit weight Total Weight (kg) (Frequency = 3 samples / 5 tons)
Dia (mm)

Dia (mm) Tensile (ksi) Dia (mm)

6 150 4.835 4,351.44 28.1 60.00 28.1

1.0 10/8/2009 28 60

9 100 4.835 4,351.44 28 59.90 28

12 75 4.835 4,351.44 28 60.00 28

LEGEND:

S1, S2, S3 - Representative sample designation


est Result (Passed / Failed)

S2 S3 Date Tested Remarks

Tensile (ksi) Dia (mm) Tensile (ksi)

60.00 28.1 60.00


1% tensile strength of S1 not attained
but material average strength test
10/10/2009 result was 60.13 Ksi, hence, approved
for use.
60.50 28 60.00

60.00 28 60.00