Project Outline

1.BG Issue date :-23.March.2022

2.BG Expiry date:-30.Sep.2026

3.BG Amount:-17,28,610

4.LOA(Letter of Award):-15.March.2022

5.Agreement date:-24.March.2022

6.PMA Cost (Fixed) Man power base:-6,79,91,978 (Six crore seventy nine lac ninety
one thousand nine hundred seventy eight)

7.PMA Variable cost:-15.63 (Fifteen crore sixty three lac)/ Sanctioned- 8.93 Cr.

8.Acceptance letter :-21.March.2022

9.Smart Metering (Including PMA Charge@2.5%):-326.60 Proposed/ Sanctioned 316.55

10.Infrastructure Work(Including PMA charge@1.5%):-934.10 / Loss Reduction Proposed

600.31Cr./Sanctioned 484.56 Cr./ Modernization Proposed 333.79 Cr.

(A) Loss Reduction:-600.31/with PMA

(B) Modernization and system Augmentation:-333.79/with PMA

Total Cost of DPR(Including PMA Charges):-1260.70/WITH PMA

Loss Reduction Without PMA Cost Proposed- 591.44 Cr./ Sanctioned 477.56 Cr.

Modernization without PMA- 328.85 Cr.