1. The document outlines an extensive test schedule for various equipment in a PV array and substation, including PV strings, cables, inverters, transformers, circuit breakers, protection relays, meters, and more.
2. Eighteen different types of equipment will undergo tests to evaluate parameters like voltage, current, insulation resistance, polarity, winding resistance, accuracy, timing, and calibration.
3. A variety of test equipment like meters, clamp meters, primary and secondary injection sets will be used to perform tests including open circuit voltage, short circuit current, power output, phase marking, ratio and burden measurements, and commissioning of alarm, protection and monitoring systems.
1. The document outlines an extensive test schedule for various equipment in a PV array and substation, including PV strings, cables, inverters, transformers, circuit breakers, protection relays, meters, and more.
2. Eighteen different types of equipment will undergo tests to evaluate parameters like voltage, current, insulation resistance, polarity, winding resistance, accuracy, timing, and calibration.
3. A variety of test equipment like meters, clamp meters, primary and secondary injection sets will be used to perform tests including open circuit voltage, short circuit current, power output, phase marking, ratio and burden measurements, and commissioning of alarm, protection and monitoring systems.
1. The document outlines an extensive test schedule for various equipment in a PV array and substation, including PV strings, cables, inverters, transformers, circuit breakers, protection relays, meters, and more.
2. Eighteen different types of equipment will undergo tests to evaluate parameters like voltage, current, insulation resistance, polarity, winding resistance, accuracy, timing, and calibration.
3. A variety of test equipment like meters, clamp meters, primary and secondary injection sets will be used to perform tests including open circuit voltage, short circuit current, power output, phase marking, ratio and burden measurements, and commissioning of alarm, protection and monitoring systems.
Test Schedule for PV Array and Plant end Substation
SL No Equipment Unit Qty Test Specification Test Equipment Remarks Voltage Open Circuit Test(VOC) Current Short Circuit Test(Isc) AVO Meter, Low range 1 PV String Set 4584 Usable Power Test clampon meter, Polarity Test KYORITSU 3125A IR Test IR Test KYORITSU 3125A 2 1.5KV, 240rm DC Cable Pcs 384 Phase Marking AVO Meter 3 Inverter Set 12 IR Test KYORITSU 3125A Phase Marking AVO Meter 4 600V, 300rm AC Cable Pcs 288 IR Test KYORITSU 3125A Magnetic Balance Test AVO Meter Voltage Ratio/Turns Ratio Test AVO Meter Vector Group Confirmation Test AVO Meter Winding Resistance Test at each tap OMICRON, CPC100 Tan-Delta and Capacitance Test of Bushings & OMICRON, CPTD1 Windings 600V/33KV, 6.25MVA Bushing CT Test OMICRON CPC100 5 Set 6 Generating Transformer Buchholz, PRD, OTI(Oil Temperature Indicator), AVO Meter WTI(winding temperature Indicator) Functional Test Operation Test of OLTC from Local/Remote AVO Meter Insulation Resistance(IR), Dielectric Absorption KYORITSU 3125A Ratio(DAR) & Polarization Index(PI) Test Measurement of Grounding Resistance MEGGER-UK, DET2/2 33V, 240rm Power Cable IR Test KYORITSU 3125A 6 Pcs 18 from Transformer to GIS DC High Voltage Test BAUR, PGK 260 HB IR Test KYORITSU 3125A 7 33KV Outdoor PT Set 6 Ratio, Polarity & Burden Measurement OMICRON, CPC100 Accuracy Class test OMICRON, CPC100 33V, 95rm Cable for PT IR Test KYORITSU 3125A 8 Pcs 18 Connection DC High Voltage Test BAUR, PGK 260 HB IR Test of DS KYORITSU 3125A Measurement of Contact Resistance MEGGER-UK, DLRO 600 IR Test of CB KYORITSU 3125A Measurement of Contact Resistance MEGGER-UK, DLRO 600 Open-Close Timing Test CB Analyzer-EGIL IR Measurement of Primary & Secondary Circuit of CT KYORITSU 3125A 9 33KV GIS Set 6 Ratio, Polarity & Burden Measurement OMICRON, CT Analyzer Excitation Voltage & Current(Magnetising Curve) Test OMICRON, CT Analyzer Measurement of Grounding Resistance MEGGER-UK, DET2/2 AC High Voltage Test BAUR, PGK 260 HB IR Test of Surge Arrester KYORITSU 3125A AVO Meter, Low range Counter check Clampon etc 33V, 240rm Power Cable IR Test KYORITSU 3125A 10 from GIS to Switching Pcs 18 Test Schedule for PV Array and Plant end Substation SL No Equipment Unit Qty Test Specification Test Equipment Remarks 10 from GIS to Switching Pcs 18 Station DC High Voltage Test BAUR, PGK 260 HB 11 33KV Protection Relay Pcs 6 DOC/DEF/Transformer Diff/REF Relay Test OMICRON, CMC356 Earth Pit 202 Measurement of Earthing Resistance MEGGER-UK, DET2/2 12 33KV Earthing Resistance Measurement of Earthing Resistance at 33KV PT, Gantry Lot 1 MEGGER-UK, DET2/2 Tower Footings, Cable Tray or Route etc 220VAC & 110VDC Circuit Check, Electrical Operation of AVO Meter, Low range 13 System Commissioning Lot 1 Equipment, Interlocks, Alarm/Trip Circuit, Trip Circuit Clampon etc Supervision Circuit Check, Inter Trip Check etc Primary Current Injector, Ampere Meter, Volt CT Core Allocation Check by Primary Current Injection Clampon Meter 14 Meter, MW & MVAR Set 6 Secondary Injection for MW, MVAR, Phase Sequence, Secondary Injection Set Meter Calibration Ampere, Voltage, Frequency Test OMICRON CMC356 Secondary Injection 15 Point-to-point Test for SAS Lot 1 I/O Signal Check Set,AVO Meter, Clampon Meter Short-Circuit Stability Test of 33KV Transformer Before Low Range Clampon 16 Transformer Stability Test Set 6 Charging Meter, AVO Meter Breakdown Voltage-BDV BS EN 60156 Dielectric Dissipation Fator-Tan-Delta IEC 247 17 Transformer Oil Test Sample 6 Moisture Content-PPM ASTM D6304 Dissolve Gas Analysis-DGA ASTM D3612 18 Weather Station Lot 1 Input/output connection, calibration AVO Meter
Test Schedule for 33KV Outgoing System
SL No Equipment Unit Qty Test Specification Test Equipment Remarks IR Measurement of Primary & Secondary Circuit of CT KYORITSU 3125A Ratio, Polarity & Burden Measurement OMICRON, CT Analyzer 1 33KV Outdoor CT Set 3 Excitation Voltage & Current(Magnetising Curve) Test OMICRON, CT Analyzer Measurement of Grounding Resistance MEGGER-UK, DET2/2 IR Measurement of Primary & Secondary Circuit of PT KYORITSU 3125A 2 33KV Outdoor Bus PT Set 1 Ratio, Polarity & Burden Measurement OMICRON, CT Analyzer Measurement of Grounding Resistance MEGGER-UK, DET2/2 IR Test of CB KYORITSU 3125A 3 33KV Outdoor VCB Set 2 Measurement of Contact Resistance MEGGER-UK, DLRO 600 Open-Close Timing Test CB Analyzer-EGIL IR Test of CB KYORITSU 3125A 4 33KV Outdoor DS Set 3 Measurement of Contact Resistance MEGGER-UK, DLRO 600 Operation & Interlock Check with VCB & ES AVO Meter IR Test of Surge Arrester KYORITSU 3125A 5 33KV Outdoor LA Set 2 AVO Meter, Low range Counter check Clampon etc IR Test KYORITSU 3125A Remote Operation of CB AVO Meter Trip Circuit Supervision, Interlocks with DS/ES AVO Meter Secondary Injection Set Relay Test 6 33KV Control Relay Panel Set 2 OMICRON CMC356 Test Schedule for PV Array and Plant end Substation SL No Equipment Unit Qty Test Specification Test Equipment Remarks Alarm, Indication, Annunciator Circuit Check AVO Meter Primary Current Injector, CT Core Allocation Check by Primary Current Injection Clampon Meter IR Test KYORITSU 3125A 7 33KV Tariff Metering Panel Set 1 Primary Current Injector, CT Core Allocation Check by Primary Current Injection Clampon Meter