This report summarizes production efficiency metrics for the IKPP - Perawang mill from December 1-11, 2021. Key metrics included:
1. Yield efficiency of 97.73%, with 671.94 metric tons of base paper produced and 15.23 metric tons rejected.
2. Time efficiency of 85.67%, with 2270 minutes of total lost time due to operation issues like roll and knife changes and sheet breaks.
3. Capacity utilization efficiency of 67.47%, with 709.61 metric tons of net production against a design capacity of 1051.77 metric tons.
This report summarizes production efficiency metrics for the IKPP - Perawang mill from December 1-11, 2021. Key metrics included:
1. Yield efficiency of 97.73%, with 671.94 metric tons of base paper produced and 15.23 metric tons rejected.
2. Time efficiency of 85.67%, with 2270 minutes of total lost time due to operation issues like roll and knife changes and sheet breaks.
3. Capacity utilization efficiency of 67.47%, with 709.61 metric tons of net production against a design capacity of 1051.77 metric tons.
This report summarizes production efficiency metrics for the IKPP - Perawang mill from December 1-11, 2021. Key metrics included:
1. Yield efficiency of 97.73%, with 671.94 metric tons of base paper produced and 15.23 metric tons rejected.
2. Time efficiency of 85.67%, with 2270 minutes of total lost time due to operation issues like roll and knife changes and sheet breaks.
3. Capacity utilization efficiency of 67.47%, with 709.61 metric tons of net production against a design capacity of 1051.77 metric tons.
1.2 YIELD EFFICIENCY 97.73 % A A.1. Base Paper 671.94 MT A.2. Net in Sheets 656.71 MT A.3. Total Reject 15.23 MT 3.1 Rejected Rolls 1.68 MT 3.2 Sorting Loss 0 MT 3.3 Sheeting Trim 11.01 MT 3.4 Sheeting Other 2.54 MT 3.5 Sheeting Difference 0 MT 1.3 TIME EFFICIENCY 85.67 % B B.1 Calendar Time 15840 min B.2 Available Time 15840 min B.3 Waiting Time 0 min % Waiting 0 % B.4 Runtime 13570 min B.5 Total Lost Time 2270 min B.5.1 Total Outside Factor 0 min 3.1 Lack of Electric Power 0 min 3.2 Lack of Air 0 min 3.3 Logistic Problem 0 min 3.4 Others 0 min B.5.2 Total Operation Lost Time 2055 min 3.5 Startup 0 min 3.6 Change Setting 70 min 3.7 Change of Rolls 1060 min 3.8 Change of Knives 0 min 3.9 Sheet Break 225 min 3.10 Others 700 min B.5.3 Total Failure Repair 215 min 3.11 Mechanical Repair 215 min 3.12 Electrical Repair 0 min 3.13 Instrumental Repair 0 min B.5.4 Scheduled Shutdown 0 min B.5.5 Others 0 min 1.9 Capacity Utilization Efficiency 67.47 % C C.1. Net Production in Ton 709.61 MT C.2. Design Production 1051.77 MT 1.10 Total Efficiency 56.49 % 1.11 Others D D.1 Sheet Break Frequency 0 times D.2 Average BW gr/m² D.3 Average Speed m/min