Important Questions 1ME2503 IE

1. Define (1) Work study (2) Method study (3) Work measurement (4) Work cycle (5) Rating
(6) Standard pace. (7) Basic time (8) Standard time (9) Allowance (10) Work content
2. Enlist techniques of work study. Write procedure of work study.
3. Explain outline process chart along with example.
4. Draw the standard symbols used in flow process chart.
5. Explain flow process chart along with example.
6. Write difference between outline process chart and flow process chart.
7. Explain man and machine chart along with example.
8. Define Therblig. Draw the symbols of THERBLINGS and their letter, colour and type.
9. Calculate standard time for the following data:
Loading time: 1.62 min.
Turning time: 6.14 min
Unloading time: 0.68 min.
Inspection time: 0.46 min.
Overall rating of cycle: 110%
Overall allowance: 10%
Also calculate the number of pieces produced in 8 hrs. Shift.
10. Define (A) Industrial engineering (B) Productivity (C) Production (D) Production system.
11. Write objectives of industrial engineering.
12. Explain need, scope and importance of Industrial Engineering.