Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

GEML - Mill and Dump Leach

200
MORE THAN MORE THAN

100
1

0.9
YEARS OF WORLDWIDE
MINING PROJECTS
EXPERIENCE ACTIVE USERS
0.8

0.7

0.6

0.5

OPTIMISING THE WORLD'S MOST COMPLEX 0.4


MINING ASSETS FOR OVER 15 YEARS.
0.3

0.2
www.cometstrategy.com
0.1
COMET Strategy Pty Ltd focuses solely on
value creation through the provision of tools,
expertise and training for strategic analysis in
the mining industry.

SOFTWARE
In the 18 years since its initial development, Our algorithms are unique in how they
COMET Optimal Scheduler has been used on simultaneously optimises multiple policies
more than 80 of the world’s most valuable such as pushback/strip sequences, variable
surface and underground mines and it is now processing cut-off grades, haulage to multiple
running in excess of 100,000 scenarios each destinations, stockpile creation and depletion,
year for projects located in countries such as; process recovery (throughput/recovery
Australia, Brazil, Canada, Chile, Mongolia, relationships), multiple ore types and any
PNG, Philippines, Peru, South Africa, USA, number of processing facilities and methods.
among others.
COMET Optimal Scheduler is used on many
COMET Optimal Scheduler is an advanced different types of projects including; copper,
multi-policy schedule optimisation tool gold, silver, platinum, uranium, bauxite, coal,
developed to optimise both single mine and iron, diamonds, nickel, zinc, and molybdenum.
complex combinations of surface and
underground mines using common COMET ONE is the new on-line schedule
infrastructure. The objective of each optimisation tool designed to simply and
optimisation is to maximize NPV, taking into freely help students understand how to find
account productivity, operational constraints and exploit the value drivers of a mine. This is
and economic conditions that may change one way for COMET Strategy puts back into
throughout the life of the project. the next generation of mining professionals.

CONSULTING TRAINING
COMET Strategy provides specific consulting services and tailored solutions to complement the optimisatio
COMET provides tailored consulting services COMET Strategy provides a range of training
to mining professionals to complement the courses including:
optimisation tools. Together with our clients
and optimisation tools, focus on increasing • Mine Planning and Strategic Analysis
shareholder value by discovering the value • Mining Economics Foundations
potential from each resource. • COMET Software Foundations
• COMET Software Advanced Applications
• COMET Software Distributed Processing
• COMET Software Medium-term Scheduling
SOFTWARE
SOFTWARE
SOFTWARE
FEATURES
FEATURES
& CAPABILITIES
FEATURES
& CAPABILITIES
& CAPABILITIES
The COMET Software
COMET The
is anCOMET
Optimal advanceSoftware
Scheduler is anThis
is antool
advance
therefore
This tool is
therefore
This
mainlytoolis
usedtherefore
mainly
by used
is by
mainly used by
Strategic Mine
advance
Planning
strategic
Strategic
tool,
mineMine
for
analysis
Planning
tool,
the Project
tool, Evaluation
the
for projectteams
the
evaluation
Project
fromEvaluation
teams
most fromteams from most
advance andfor advanced
experienced
advance
and experienced
Mining
and experienced
of the Tier
Mining
most
1 mining
of the
companies
ofTier
the1 Tier
miningin
1 the
mining
companies
companies in the
engineers. mining engineers.
engineers. world, within the
theworld,
common
world,
with the
goal
with common
the
of common
goal of goal of
Maximisingmaximising
the total value
Maximising
the total
of a Mining
business
the total
value
value
of of a Mining
Asset (NPV).a set of mining
Assetassets
(NPV). using the NPV.
LONG TERM
LONGSCHEDULING
TERM
LONGSCHEDULING
TERM SCHEDULING
(LOM) FOR
TO NPV
MAXIMISE
(LOM) FULL
FOR NPV
NPV
1 1 1
Optimal Mine
Optimised
plans that
Optimal
mineMaximise
plans
Mine that
plans that Maximise
VARIABLE CUT-OFF
VARIABLE VARIABLE
CUT-OFFCUT-OFF
total NPV and
maximise
meet all
the
total
project
full
NPVNPV and
frommeet
all allGRADE
project and
OPTIMISATION GRADE OPTIMISATION
GRADE OPTIMISATION
operational
periods
constraints,
tooperational
meet including
all project 2
constraints,
and 2
including 2
economic operational
conditionseconomic
that
constraints,
changeconditions
including Determine
that change Determine
the optimum
Determine
theCut-Off
optimum thecut-off
optimum Cut-Off
with time.economic
For Openwith
conditions
Pit
time. and
that
Forchange
Open Grade
Pit per
andgrade
periodper
andGrade
period,
per Ore
per
pertype
period
ore type
andand
per Ore type
Underground
withmining
time. Underground
methods. / processing
mining methods. for each
destination
processing
/ processing
for destination
yourdestination
for for your
Long / Medium
your strategic
TermLong
Mine
and
/Plan.
Medium
long termTerm
mine
Mine Plan.
plans.
OPEN PITINTEGRATED
& UNDERGROUND
OPENOPEN
PIT &PIT
UNDERGROUND
&
OPTIMISATION
UNDERGROUND
OPTIMISATION
OPTIMISATION
3 3 3
Optimise projects
Optimisethat
projects
Optimise
have that
Open
projects
have open
thatSTOCKPILING
have OpenSTOCKPILING
& STOCKPILING& &
Pit and Underground
pit and underground
Pit operations
and Underground
operations operations
REHANDLING REHANDLING REHANDLING
on the same
usingdeposit
common
on orthe
infrastructure
mining
same deposit
4 and or 4mining 4
lease. Optimise
constraints.
tolease.
Optimise
decide Optimise
the
to determine
to Maximise
decide theImprove
the utilization
the
Maximise
utilization
of your
the
of your
utilization of your
sequence the
of extraction
extraction
sequence
sequence
of bothof of
extraction
each resource
of both
and
resource
maximise
when
resource
the
maximising
value
andofmaximise
the the value of
methods in
region
seriesand
ormethods
the
in ascale
parallel
inand
series
timing
or of
in a parallel
your project
value ofby
your
your
using
project
project
using
our our by using our
manner. capital expenditures.
manner. Stockpilingautomated
and Stockpiling
stockpiling
Reclaimingandand Reclaiming
automatedreclaiming
capabilities.
automated
capabilities.capabilities.
PROCESSING
PROCESSING
FACILITIES
PROCESSING
FACILITIES
FACILITIES
OPTIMISATION
OPTIMISATION
OPTIMISATION
5 5 5
Select theSelect
optimum
the Select
optimum
processing
theprocessing
optimum processing
MULTIPLEMULTIPLE
PROCESSING MULTIPLE
PROCESSING PROCESSING
method and method
processing
and
method
processing
capacity
and processing
capacity capacity
DESTINATIONSDESTINATIONS
OPTIMISATION
DESTINATIONS
OPTIMISATIONOPTIMISATION
for your project
for your
or operation.
project
for your
or project
operation.
or
6 operation. 6 6
For projectsFor and
projects
operations
Forand projects
operations
withand with
operations with
multiple multiple
processingprocessing
multiplemethods,
methods,
processing methods,
COMET COMET will will
optimise
COMET
optimise the
the
will optimise the
productionproduction
schedule production
schedule
by sending byschedule
sending by sending
MULTIPLE OPENMULTIPLE
MULTIPLE PITOPEN PIT OPEN PIT material tomaterial
its optimum
tomaterial
its optimum
economic
to itseconomic
optimum economic
OPTIMISATION
OPTIMISATION OPTIMISATION processingprocessing
to helpOptimise
the clientone
reach their strategic 7 and unlock
objectives 7 value7destination,
of
processing
each
destination,to
resource.
to destination, to
Optimise Optimise
or multiple
one oropen one
pit oropen
multiple Maximise
multiple
pit open pitNPV
maximise
of the NPV
Maximise
project
of the
and
NPV
project
to of the
andproject
to and to
projects/operations projects/operations
projects/operations
with multiple
with multiple fulfillmultiple
with the processing
fulfill the processing
fulfill
capacities
the processing
capacities
and capacities
and and
phases in phases phases
parallelinor
parallel in in
in series
or parallel or constraints.
toseries to in series constraints.
to constraints.
Maximise the
maximise Maximise
overalltheNPVoverallthe
NPVoverall
of your of yourNPV of your
assets. assets. assets.
BLENDING
8
Achieve blending targets for
GRINDING & RECOVERY product control and maximisation
OPTIMISATION
% 9 of recovery.
Exploit mill throughput and
recovery relationships with the
cut-off grades to further improve
the project value without INFRASTRUCTURE &
significant capital expenditure. OPERATIONAL EXPANSIONS
(CAPEX) OPTIMISATION
10
Optimise multiple infrastructure
$
TRUCK & SHOVEL and capital expansion scenarios
FLEET OPTIMISATION simultaneously.
11
Define the size of your truck and
shovel fleets per period, and for
the entire life of asset (LOA) in
your optimum mine plan.
ENGINEER DEFINED REPORTING
& EXPORT FUNCTIONALITIES
12
Create Financial, Production and
CLOUD BASED MULTI SCENARIO
Technical reports as detailed or as
OPTIMISATION CAPABILITIES
13 simple as required.
Use our cloud based capabilities
to evaluate as many scenarios as
the project and engineer needs in
a swiftly, efficient, and simple
manner. MEDIUM TERM
GUIDANCE
14
SUITABLE FOR MOST Optimal and operational medium
term mine plans to guide in a
MINING PROJECTS
15 strategic manner the medium
Copper, gold, silver, platinum, term mine planning engineer.
uranium, bauxite, coal, iron ore,
diamonds, nickel, zinc, and
molybdenum.

NPV
CONSULTING NPV
50% to 200%
Understanding Value

COMET Strategy offers a


NPV
10% to 30%

combination of software,
operational and experience
together with inherent value
Optimisation

5% to 15%

Experience

understanding.
Schedule

All of these together can make the


difference of the success of any
mining project:
Develop the optimal production schedule of an Create Audit reports for thirds parties
open pit, underground or combination of both, (non-mining engineers) to confirm confidence
using our state of the art and worldwide and operability of a mining project.
recognised strategic mine planning COMET
Optimal Scheduler . Realise Peer Reviews and Due Diligence studies.
Participating in independent reviews of
Realise a large number of sensitivity and risk investment proposals.
analysis using the flexibility and capability of
COMET Optimal Scheduler . If you are already a COMET Optimal Scheduler
user, we can help and assist you to get the most
out of your software and asset.

R&D
Research and Development
SOFTWARE DEVELOPMENT
When very particular complexities are to be
modeled and optimised, COMET Strategy has
all the capabilities and experience to create
new ‘Custom Functions’ and software to
tailor the model as close to real to the
operation or project to be studied. The most
famous Custom Functions or algorithms
include:

• Fleet Replacement
• Grinding Adjustment
(Grinding Versus Recoveries). KEN LANE’S BOOK
• Incremental Distance to Waste Dump
(Waste Dump Optimiser). COMET Strategy bases a large part of its work,
research and development, on Kenneth F.
Lane’s Cut-Off Grade theories. Lane’s theories
and work have been the base and foundation
GRADE ENGINEERING for strategic mine planning worldwide for the
COMET Strategy is currently working in last century. COMET Strategy has recently
collaboration and as a member with CRCORE released the latest edition in two languages;
on the Grade Engineering Program, with focus English and Spanish.
in Mine Planning Optimisation with Grade
Engineering Techniques.
Grade Engineering Techniques include: Sensor
Based Sorting (Bulk Sorting and Particle
Sorting), Differential Blasting (Induced
Deportment), Grade by Size (Natural
Deportment), and Dense Media Separation
(DMS). COMET Strategy is the first company
with CRCORE to create a full optimisation to the
Long Term Mine Plan of an operating mine with
Grade Engineering Techniques. Please visit our
website to download the technical paper.
AROUND THE WORLD

1 1
1 4
6

4 3 5

4
3
7

3 4
8
3 7
8 4 3
3 1 5
1
6
3
3 1
4 8
3

Coal Gold Bauxite


1 4 7
Diamond Silver Uranium
2 5 8
Copper Iron Ore COMET Support
3 6

LONG TERM CLIENTS

www.cometstrategy.com

You might also like