Sub-Structure: Concrete Work

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

BILL OF QUANTITY PAGE_________

item Discription uint


A SUB-STRUCTURE
1 excavation and earth work
Site clearing to remove top soil and other rubish materials to an
average depth of 20cm starting from N.G.L.
1.1 m2

1.2 Bulk excavation not exceeding a depth of 150cm from site clearance. m3

1.3 Pit excavation not exceeding 150cm from reduced level. m3

Trench excavation for stone masnory foundation wall to a depth not


1.4 exceeding 120cm reduced level. m3
Back fill around foundation column and aroound stone masonry compacted
1.5 in max.200mm layer. m3
Borrow material fill under hard core.
1.6 m3

Hard basaltic or equivalent stone hardcore well rolled consolidated and


1.7 blinded with crushed stone to a finished thickness of 25cm. m2

Carted away surplus excavated material to appropriate tip


1.8 (assuming 4km away) m3
TOTAL CARRIED TO SUMMARY =

2 concrete work
lean concrete quality in class C-5 with minimum cement content of 150kg
2.1 /m3.

2.1.1 under footing and chimeny foundation pad m2


2.1.2 under stone masnory foundation m2
2.1.3 under grade beams m2

Reinforced concrete in class C-25, with minimum cement content of 360kg/m3


filled in into formwork and vibrated around steel reinforcement, steel and
2.2 formwork measured separately:-
2.2.1 in footing pad m3
2.2.2 in foundation column m3
2.2.3 in grade beam m3
2.2.4 in ground floor slab m3
TOTAL CARRIED TO SUMMARY =
BILL OF QUANTITY PAGE_________

2.3 Provide cut & fix in position sawn zigba wood or equivalent formwork.
2.3.1 footing pad m2
2.3.2 foundation column m2
2.3.3 grade beam m2
TOTAL CARRIED TO SUMMARY =

Supply& fix in position Steel reinforcement according to structural


2.4 drawing; Price includes cutting bending, placing in position and tying wires.
2.4.1 diameter 8mm kg
2.4.2 diameter 10mm kg
2.4.3 diameter 12mm kg
2.4.4 diameter 14mm kg
2.4.5 diameter 16mm kg
TOTAL CARRIED TO SUMMARY =

3 sundry work
Expansion joints shall be filled with 8mm thick & 100mm depth chip
wood both sides painted with bitumen between grade beam and ground
3.1 slab. m
TOTAL CARRIED TO SUMMARY =

4 Masnory work
Construct 50cm thick hard trachitic or equivalent stone masonry foundation
wall for trench bedded in cement sand mortar ratio 1:3 price shall include
4.1 cement mortar bed. M3

4.2 for hard core m2


TOTAL CARRIED TO SUMMARY = =sum(

B Supper structure work


1 Concrete work
Reinforced concrete in class C-25, with minimum cement content of 360kg/m3
filled in into formwork and vibrated around steel reinforcement, steel and
1.1 formwork measured separately:-
1.1.1 elevated column m3
1.1.2 floor beam m3
1.1.3 top tie beam m3
1.1.4 tanker beam m3
1.1.5 gutter m3
1.1.6 1st floor slab m3
1.1.7 tanker slab m3
1.1.8 stair case including the supoting beams M3
BILL OF QUANTITY PAGE_________

TOTAL CARRIED TO SUMMARY =

2 Formwork
Provide cut & fix in position sawn zigba wood or equivalent formwork.
2.1 column m2

2.2 for first floor beam(submerged beam) m2


2.3 for tie beam m2
2.4 first floor slab m2
2.5 stair case including the supoting beams m2
2.6 christ for slab of 12mm m
2.7 Eucalyptus for slab of 8mm m
TOTAL CARRIED TO SUMMARY =
3 Reeinforcement
Steel reinforcement according to structural drawings. Price includes cutting,
bending, placing in position and tying wire and required spacers. Labor cost
only.

3.1 Diam 6 kg
3.2 Diam 8 kg
3.3 Diam 10 kg
3.4 Diam 12 kg
3.5 Diam 14 kg
3.6 Diam 16 kg
3.7 Diam 20 kg
TOTAL CARRIED TO SUMMARY =
4 BLOCK (MASONRY)WORK
Class C, 200mm thick HCB wall which can satisfy the designed strength ,
bedded in cement mortar (1:3).Price shall include mortar bed for ground
floor wall.
4.1 m2
4.1.1 Front elevation m2
4.1.2 Right elevation m2

4.1.3 Left elevation m2

4.14 Rear elevation m2


4.2 Interior Wall
4.2.1 20 cm thick HCB class C m2
4.2.2 15 cm thick HCB class C m2
4.2.3 10 cm thick HCB class C m2
BILL OF QUANTITY PAGE_________

4.3 stone brick HCB of type 10 m2


TOTAL CARRIED TO SUM
5 Roofing work
5.1 G-28 C.I.Sheet roof cover m2
Eucalyptus wood vertical & diagonal members.Dia. 80mm for the main
building.
5.2 m
Sawn Zigba wood roof purlins50x70mm placed at c/c 1000mm for main
5.3 building. m
Eucalyptus wood Horizontal members.Dia. 100mm for the main building
5.4 m
Eucalyptus rafter dia.100mm for the main building
5.5 m
TOTAL CARRIED TO SUMMARY =
6 METAL WORK
6.1 28 mm LTZ metal profile half glazed door with grill

6.3 Doors
Door size 900x2180mm pcs
Door size 700x2100mm pcs

6.4 Woyra ply wood smooth finish flush wood door


Door size 900x2100mm m2
size 900x2000mm m2
windows 38 mm LTZ metal profile window with grill
6.5
window size 800x900mm pcs
window size 1500x1100mm pcs
size 1760x10000mm pc
size 1500x1000mm pc
Stair case hand rail made of aluminum profiles consisting of baluster and handrail all as per shown on the
6.5 ml
TOTAL CARRIED TO SUMM
7 Finishing works
Apply three coats of plastering in cement mortar (1:3)Price shall include exposed
surface of beams & column,pre-cleaning and preparation of the surface.for the
7.1 main building. For ground and firsr floor
a. to external wall surface m2
b. to internal wall surface m2
c. gutter to be plastered m2
cement screed 30mm thick in 1:3 ratio cement mortar to receive ceramic
7.2 wall tiles m²
BILL OF QUANTITY PAGE_________

Supply and lay parquate tile flooring. The pattern of the tile and the entire work
shall be approved by the engineer. Price shall include cement mortar (1:3) bed
7.3 and grouting. m²
Supply and fix 6 mm thick & 150x150mm white glazed ceramic wall tiles
with cement mortar (1:2) backing with 5mm joints to be grouted with white
7.4 cement. m²
7.5 smooth finished cement tile ground floor m²
Supply and fix 300x300mm marble floor with cement sand mortar
(1:3).Price shall include polishing
7.6 chanffering,grouting with matching colour and other necessary works. m²
Supply and fix 300x300x2mm PVC tile flooring glued with approved
type cement screed. Price shall include 48 mm thick cement screed (1:3)
and approved type fixing accessories. Colour and quality to be
7.7 approved by the enginner. m²
Supply and fix 8mm thick chip wood ceiling.Price shall include
7.8 battens,fixing accessories and other incidental works. Of ground floor m²
7.9 First floor ceiling( PVC ceiling) m2
TOTAL CARRIED TO SUMM
8 glazing work
Supply and fix 4mm thick clear glass. Price shall include fixing accessories.
Front side TILTED GLASS
8.1 m2
8.2 Rear side clear glass m2
TOTAL CARRIED TO SUMM
9 Rendering Work
9.1 Rear wall m2
9.2 Left wall m2
9.3 Right wall m2
TOTAL CARRIED TO SUMM

10 painting
10.1 Apply three coats of plastic emulsion paint. Price shall include pre -
10.1.1 summation af all area palstered and rendered m2
TOTAL CARRIED TO SUMM

SUMMARY
A. SUB-STRUCTURE (SITE AND FENCE WORK)
1 EXCAVATION & EARTH WORK Birr
2 CONCRETE WORK ,,
3 FORM WORK
4 REINFORCEMENT
5 MASONRY WORK ,,
6 SUNDRY WORK ,,
BILL OF QUANTITY PAGE_________

SUB-TOTAL A ,,
B. SUPER-STRUCTURE
1 CONCRETE WORK Birr
2 FORM WORK ,,
3 BLOCK WORK ,,
4 ROOFING ,,
5 REINFORCEMENT ,,
6 METAL WORK ,,
7 FINISHING ,,
8 GLAZING ,,
9 RENDERING ,,
10 PAINTING ,,
SUB-TOTAL B ,,
TOTAL A+B 929,229.41
10%ELECTRICAL AND INSTALLATION WORK ,,
15% SANITARY WORK
GRAND TOTAL 1,161,536.77
BILL OF QUANTITY PAGE_________

quantity rate Amount ETB

193.50 12.77 2470.995

62.775 80.23 5036.43825

71.4364 118.93 8495.931052

64.075 117.42 7523.6865

92.88 48.42 4497.2496

41.85 123.70 5176.845

70.10 66.38 4653.238

131.65 84.34 11103.361


48957.7444

23.28 85.41 1988.3448


18.80 85.41 1605.708
13.46 85.41 1149.6186

4.20 2365.88 9936.696


1.13 2365.88 2673.4444
4.04 2365.88 9558.1552
6.99 2365.88 16533.95238
43445.91938
BILL OF QUANTITY PAGE_________

10.17 157.31 1599.8427


15.05 164.65 2477.9825
41.31 154.28 6373.3068
10451.132

317.027 29.27 9279.38029


0.00 28.59 0
433.1664 28.36 12284.5991
11.23 29.03 326.12302
225.3384 28.44 6408.624096
28298.72651

39.1 54.12 2116.092


2116.092

31.60 1059.97 33495.052


70.10 868.30 60867.83
94362.882

7.12 2365.88 16845.0656


4.17 2365.88 9865.7196
2.61 2365.88 6174.9468
0.81 2365.88 1916.3628
4.72 2365.88 11166.9536
9.78 2365.88 23138.3064
1.4 2365.88 3312.232
1.6 2365.88 3785.408
BILL OF QUANTITY PAGE_________

76204.9948

50 164.65 8232.5
12.95 227.22 2942.499
15.00 227.22 3408.3
78.12 286.86 22409.5032
14.92 206.43 3079.9356
938.49 3.83 3594.4167
943.995 3.00 2831.985
46499.1395

81.518 29.4 2396.6292


817.97 29.27 23942.06971
107.6 28.59 3076.284
356.7586 28.36 10117.6739
990.37 29.03 28750.4411
493.6616 28.44 14039.7359
93.21 28.49 2655.5529
84978.38671

12.28 285.86 3510.3608


75.63 285.86 21619.5918

75.79 285.86 21665.3294


35.63 285.86 10185.1918

56.6 285.86 16179.676


63.7 269.34 17156.958
2.84 233.21 662.3164
BILL OF QUANTITY PAGE_________

6.25 320.96 2006


TOTAL CARRIED TO SUMMARY92985.4242
=sum(

136.4 198.61 27090.404

104.70 20.82 2179.854

101.35 38.44 3895.894

34.22 20.82 712.4604

32.94 58.93 1941.21313


35819.82553

2 845.86 1691.72
3 845.86 2537.58

6 994.82 5968.92
3.00 994.82 5372.028

2 4213.01 8426.02
2 4213.01 8426.02
1 4213.01 4213.01
2 4213.01 8426.02

185 199.8 36963


TOTAL CARRIED TO SUMMARY =82024.318

318.60 167.40 53332.90344


428.46 167.40 71724.204
17.5 167.40 2929.5

110.01 118.99 13089.68159


BILL OF QUANTITY PAGE_________

53.22 666.34 35462.6148

41.16 699.84 28805.4144


7.02 35.02 245.8156033

15.91 699.84 11134.4544

26.184 236.92 6203.51328

94.124 54.12 5093.99088


69.634 120.18 8368.61412
TOTAL CARRIED TO SUMMARY =236390.7065

21.92 600.77 13168.8784


4.13 323.66 1336.7158
TOTAL CARRIED TO SUMMARY =14505.5942

68.95 31.06 2141.587


86.56 31.06 2688.5536
85.38 31.06 2651.9028
TOTAL CARRIED TO SUMMARY =7482.0434

795.70 31.05 24706.485


TOTAL CARRIED TO SUMMARY =24706.485

48,957.74
43,445.92
10,451.13
28,298.73
94,362.88
2,116.09
BILL OF QUANTITY PAGE_________

227,632.50

76,204.99
46,499.14
92,985.42
35,819.83
84,978.39
82,024.32
236,390.71
14,505.59
7,482.04
24,706.49
701,596.92
929,229.41
92,922.94
139,384.41
1,161,536.77 Birr