Sub-Structure: Concrete Work
Sub-Structure: Concrete Work
Sub-Structure: Concrete Work
1.2 Bulk excavation not exceeding a depth of 150cm from site clearance. m3
2 concrete work
lean concrete quality in class C-5 with minimum cement content of 150kg
2.1 /m3.
2.3 Provide cut & fix in position sawn zigba wood or equivalent formwork.
2.3.1 footing pad m2
2.3.2 foundation column m2
2.3.3 grade beam m2
TOTAL CARRIED TO SUMMARY =
3 sundry work
Expansion joints shall be filled with 8mm thick & 100mm depth chip
wood both sides painted with bitumen between grade beam and ground
3.1 slab. m
TOTAL CARRIED TO SUMMARY =
4 Masnory work
Construct 50cm thick hard trachitic or equivalent stone masonry foundation
wall for trench bedded in cement sand mortar ratio 1:3 price shall include
4.1 cement mortar bed. M3
2 Formwork
Provide cut & fix in position sawn zigba wood or equivalent formwork.
2.1 column m2
3.1 Diam 6 kg
3.2 Diam 8 kg
3.3 Diam 10 kg
3.4 Diam 12 kg
3.5 Diam 14 kg
3.6 Diam 16 kg
3.7 Diam 20 kg
TOTAL CARRIED TO SUMMARY =
4 BLOCK (MASONRY)WORK
Class C, 200mm thick HCB wall which can satisfy the designed strength ,
bedded in cement mortar (1:3).Price shall include mortar bed for ground
floor wall.
4.1 m2
4.1.1 Front elevation m2
4.1.2 Right elevation m2
6.3 Doors
Door size 900x2180mm pcs
Door size 700x2100mm pcs
Supply and lay parquate tile flooring. The pattern of the tile and the entire work
shall be approved by the engineer. Price shall include cement mortar (1:3) bed
7.3 and grouting. m²
Supply and fix 6 mm thick & 150x150mm white glazed ceramic wall tiles
with cement mortar (1:2) backing with 5mm joints to be grouted with white
7.4 cement. m²
7.5 smooth finished cement tile ground floor m²
Supply and fix 300x300mm marble floor with cement sand mortar
(1:3).Price shall include polishing
7.6 chanffering,grouting with matching colour and other necessary works. m²
Supply and fix 300x300x2mm PVC tile flooring glued with approved
type cement screed. Price shall include 48 mm thick cement screed (1:3)
and approved type fixing accessories. Colour and quality to be
7.7 approved by the enginner. m²
Supply and fix 8mm thick chip wood ceiling.Price shall include
7.8 battens,fixing accessories and other incidental works. Of ground floor m²
7.9 First floor ceiling( PVC ceiling) m2
TOTAL CARRIED TO SUMM
8 glazing work
Supply and fix 4mm thick clear glass. Price shall include fixing accessories.
Front side TILTED GLASS
8.1 m2
8.2 Rear side clear glass m2
TOTAL CARRIED TO SUMM
9 Rendering Work
9.1 Rear wall m2
9.2 Left wall m2
9.3 Right wall m2
TOTAL CARRIED TO SUMM
10 painting
10.1 Apply three coats of plastic emulsion paint. Price shall include pre -
10.1.1 summation af all area palstered and rendered m2
TOTAL CARRIED TO SUMM
SUMMARY
A. SUB-STRUCTURE (SITE AND FENCE WORK)
1 EXCAVATION & EARTH WORK Birr
2 CONCRETE WORK ,,
3 FORM WORK
4 REINFORCEMENT
5 MASONRY WORK ,,
6 SUNDRY WORK ,,
BILL OF QUANTITY PAGE_________
SUB-TOTAL A ,,
B. SUPER-STRUCTURE
1 CONCRETE WORK Birr
2 FORM WORK ,,
3 BLOCK WORK ,,
4 ROOFING ,,
5 REINFORCEMENT ,,
6 METAL WORK ,,
7 FINISHING ,,
8 GLAZING ,,
9 RENDERING ,,
10 PAINTING ,,
SUB-TOTAL B ,,
TOTAL A+B 929,229.41
10%ELECTRICAL AND INSTALLATION WORK ,,
15% SANITARY WORK
GRAND TOTAL 1,161,536.77
BILL OF QUANTITY PAGE_________
76204.9948
50 164.65 8232.5
12.95 227.22 2942.499
15.00 227.22 3408.3
78.12 286.86 22409.5032
14.92 206.43 3079.9356
938.49 3.83 3594.4167
943.995 3.00 2831.985
46499.1395
2 845.86 1691.72
3 845.86 2537.58
6 994.82 5968.92
3.00 994.82 5372.028
2 4213.01 8426.02
2 4213.01 8426.02
1 4213.01 4213.01
2 4213.01 8426.02
48,957.74
43,445.92
10,451.13
28,298.73
94,362.88
2,116.09
BILL OF QUANTITY PAGE_________
227,632.50
76,204.99
46,499.14
92,985.42
35,819.83
84,978.39
82,024.32
236,390.71
14,505.59
7,482.04
24,706.49
701,596.92
929,229.41
92,922.94
139,384.41
1,161,536.77 Birr