Professional Documents
Culture Documents
PU - WWTP - Piura
PU - WWTP - Piura
PU - WWTP - Piura
PU Assessment
Design Phase Risk Assessment (DHS)
Overall Summary
Process Safety RLa RL1 RL2 RL3 RL4
Identified Scenarios classified according Scenario
DSM Risk Graph (RL) Number 0 0 0 0 0
DSM HSE req. annex-3 and PSN-GN014
Hazard-No. 0 0 0 0 0
Identified scenario classified according Safety Critical 1-layer 2-layers 3-layers 4-layers 5-layers
DSM risk graph according PSN-GN015 Procedure
Number 0 0 0 0 0
Hazard-No. 0 0 0 0 0
All actions, according action list at the end of this document are closed
0 remaining actions have been transferred to the project list and will be closed before startup
0 actions have been communicated to the site and will be dealt outside this HAZOP/Project
General Concerns / Comments
Document Information
Position / Function
Name Signature Date
Department
Document
Site Director
Owner
Reviewer
SHE Coordinator
Participant
Reviewer
CI Coordinator
Participant
Approval
Production Manager
Operation
Approval
SHE Manager
SHE Manager
FOR INTERNAL USE ONLY
DSM Nutritional Products
PU Assessment Risk Assessment (PU) Version: 0 Valid from: 2/11/21
Page 3 of 12
Title: P.U. – Waste Water Treatment – Industrial Treatment Page 3 of 12
Document History
Table of Content
1 Participants / Responsibilities.........................................................................................5
2 Basic Information............................................................................................................. 5
2.1 Pre-conditions, Considerations and Assumptions for this Package Unit..................5
2.2 Process description / Reviewed operation conditions.............................................9
2.3 Node borders........................................................................................................... 9
2.4 Equipment............................................................................................................... 9
3 Basic Documents............................................................................................................ 10
4 Checklist........................................................................................................................ 11
5 Action points.................................................................................................................. 12
6 Attachments................................................................................................................... 12
FOR INTERNAL USE ONLY
DSM Nutritional Products
PU Assessment Risk Assessment (PU) Version: 0 Valid from: 2/11/21
Page 5 of 12
Title: P.U. – Waste Water Treatment – Industrial Treatment Page 5 of 12
1 Participants / Responsibilities
Sessions date
Roles and responsibilities (mark applicable choice X)
attended
Executed (%)
Instrumental
Maintenance
Planned (%)
Production
& control
15/10/21
Engineer
Engineer
Engineer
7/09/21
Process
Safety
Scribe
Position / Function Chair
Name Comments
Department
2 Basic Information
d) The selected area is far from the ATEX zone, in a open area.
FOR INTERNAL USE ONLY
DSM Nutritional Products
PU Assessment Risk Assessment (PU) Version: 0 Valid from: 2/11/21
Page 6 of 12
Title: P.U. – Waste Water Treatment – Industrial Treatment Page 6 of 12
Área seleccionada
a. Equipment and instrument List with material, line, function, type, weight,
potency and model included in the vendor document: “abcdfg.pdf”.
f) MSDS: “abcdfg.pdf”
Operation/maintenance of PU by supplier
b. A list of the safety provisions and measures linked to the risks (to verify their
applicability and functionality).
Comments:
FOR INTERNAL USE ONLY
DSM Nutritional Products
PU Assessment Risk Assessment (PU) Version: 0 Valid from: 2/11/21
Page 7 of 12
Title: P.U. – Waste Water Treatment – Industrial Treatment Page 7 of 12
See 4.1
c. Design cases of reliefs and other emission points (needed for safe location
design and processing emissions).
Comments:
Physicochemical and biological sludge are not dangerous. The whole system
comes in a container and there will be anti-spill equipment nearby.
d. Information on safety provisions (make, type) and safety measures (to verify
their quality).
Comments:
See 4.1
g. Proof test procedures (initial and periodic to fulfil legal requirements, verify
their applicability and manage/control supplier’s operators during their
presence on site).
Documents:
Abcdfefer er
Operation/maintenance of PU by DSM
b. A list of the safety provisions and measures linked to the risks (to verify
their applicability and functionality).
f. Design cases of reliefs and other emission points (needed for safe location
design and processing emissions).
Comments:
Close System. No emissions will be returned in the environment before
treatment. There will be recirculation system to guarantee that the effluent do
not reach the environment.
2.4 Equipment
Add document
FOR INTERNAL USE ONLY
DSM Nutritional Products
PU Assessment Risk Assessment (PU) Version: 0 Valid from: 2/11/21
Page 10 of 12
Title: P.U. – Waste Water Treatment – Industrial Treatment Page 10 of 12
3 Basic Documents
4 Checklist
1. Risk assessment reports or an enumeration and description of the risks (needed to inform personnel on the risks). (Complete Study: )
Technology & Quality Risk Assessment: Industrial Effluent Treatment Plan Rev.01 Reference Document: Y-062-001 R 4
You have completed 0 Risk Assessments out of a total of 5
Gross Risk Risk after known controls implemented
Nr Catalogue Risk Scenario Likelihood Impact Exposure Likelihood Impact Exposure Response
INDUSTRIAL TREATMENT
Obstruction of the Screw
Daily inspection of the sludge quality. We do not expect
Open
1 Press by non desired Detention of the system Low Low Low Very low Low Low Accept
solids as DSM have pretreatment.
solids as plastics
Open
2 Failure of pump Detention of the system Low Low Low System include 1 pump as spare. Very low Low Low Accept
Open
3 Low pressure of water No cleaning water for the system Low Low Low To use a manual Hidro Jet to clean system Very low Low Low Accept
4 Overflow of the Flocutator Tank Low Low Low If sensor fails floculation tank will overflow and Operator Very low Low Low Accept
Press
must stop feeding and DSM will implement a overflow
contention system
6 Failure in Polymer pump No polymer preparation Low Low Low Very low Low Low Accept
additional pump on Conteiner if necessary to change pumps.
FOR INTERNAL USE ONLY
DSM Nutritional Products
PU Assessment Risk Assessment (PU) Version: 0 Valid from: 24/06/2019 Page 12 of 12
Title: PU – Waste Water Treatment – Industrial Treatment Page 12 of 12
5 Action points
N/A
6 Attachments
MSDS