Professional Documents
Culture Documents
GWT Siram Taman - 02
GWT Siram Taman - 02
JA
LU
R P
IP AG
A S
SUN
GAI
PRY:0+
KAL
IMA
000
LAN
G
PRY:0+0
50
Salur
B
an
Tarum
PRY:0+100
Barat
ABT
PRY:0+150
PRY:0+200
1
CCTV PRY:0+214
ctv
ctv
Saluran
Tarum
Barat
P1
POS
P2
SC
05
P3
P4
CCTV
P5
P6
P7
P8
B
B
P9
P10
P11
tngg
P12
ABT
2
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
POST&DORMITORY
jln
LOKASI
CCTV
CCTV
0+000
0+050
0+100
0+150
EXTEND
SICPA
0+200
0+250
EXPANSI
PERURI
0+300
0+000
+27.5ex
+32
+31
0+350
+25ex +32 +31
0+050
+35ex
+36+37+34 bottom of swale
+42.5ex
3F +41.5 bottom of swale
+44.5
+43.5
0+138
+42.5
CP-04
0+450
+27ex +32 +31 +39 (?)
3K
0+480
+35ex
0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
+32
+31
+31
+40.0
2C
+31 +31 0+050
+27ex +32 +32 +29
0+100
3G
0+137
+28.5
Permanent water body
+27.5ex
+32
+31
+32
SCP-3A
+33 Patrol
+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)
+31
3C
Permanent water body
top level at 28.5
+29.3
+32
+38
+35
2B
+38
+40.0
+32
+31
+27.5ex
3H
3L
+38
0+000
3I
0+050
A
3
3J
0+100
+32
0+150
+31
+27.5 ex
+40
3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0
0+200
+31ex
+49
+41 +48
3B
+43.0
+44 +40
+45.5
+44.0
+40
0+250
+46
+45.5
0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
top level at 33
+46 area of 850 m2
S
0+350
+35
+32
+35
+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex
Notes :
C C
B
PEMBERI TUGAS
Developer/ Owner:
BANK INDONESIA
Address:
KONSULTAN PMCM
Consultant PMCM :
KSO EGIS-YODYA
KONSULTAN PERANCANG
TEAM LEADER PERANCANG IKI KSO TIM AHLI PERANCANG IKI KSO
Design Consultant :
AURECON INDONESIA
Design Consultant :
Design Consultant :
PERANCANGAN TERINTEGRASI
BANK INDONESIA DI KAWASAN
KARAWANG DAN KAWASAN GRESIK
SBI-IKIKSO-K-E01-DN-DR-0001
+46.
JA
LU
R P
IP AG
A S
SUN
GAI
PRY:0+
KAL
IMA
000
LAN
G
PRY:0+0
50
Salur
an
Tarum
PRY:0+100
Barat
ABT
PRY:0+150
PRY:0+200
1
CCTV PRY:0+214
ctv
Saluran
+45.75
ctv
Tarum
Barat
00
P1
POS
P2
SC
05
P3
P4
CCTV
P5
P6
P7
P8
B
B
P9
P10
P11
tngg
P12
ABT
2
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
POST&DORMITORY
CCTV
CCTV
300
3
0+000
0+050
0+100
0+150
EXTEND
SICPA
SUMP PIT
0+200
0+250
EXPANSI
PERURI
600x600-500
0+300
0+000
+27.5ex
+32
+31
0+350
+25ex +32 +31
0+050
+35ex
+36+37+34 bottom of swale
+42.5ex
3F +41.5 bottom of swale
+44.5
+43.5
0+138
+42.5
CP-04
0+450
+27ex +32 +31 +39 (?)
3K
0+480
+35ex
0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
+32
+31
+31
+40.0
2C
+31 +31 0+050
+27ex +32 +32 +29
3300
0+100
3G
0+137
+28.5
Permanent water body
3000
+27.5ex
+32
+31
+32
SCP-3A
+33 Patrol
+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)
+31
3C
Permanent water body
top level at 28.5
+29.3
+32
+38
+35
2B
+38
+40.0
KOLOM
+32
+31
+27.5ex
3H
3L
+38
0+000
3I
0+050
3
3J
400x400
0+100
+32
0+150
+31
+27.5 ex
+40
3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0
0+200
+31ex
+49
+41 +48
3B
+43.0
+44 +40
+45.5
+44.0
+40
0+250
+46
+45.5
0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
top level at 33
+46 area of 850 m2
S
2
0+350
+35
+32
+35
+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex
Notes :
SUMP PIT
600x600-500 MUTU BETON
SUMP PIT
3000
- f'c 30 MPa
3300
1000x1000-1000
- E = 25742.9602 MPa
MUTU TULANGAN
- BJTS-420B
- Fy 420 MPa
300
1 - Fu 525 MPa
A B C D E F
.25
PEMBERI TUGAS
Developer/ Owner:
KONSULTAN PMCM
Consultant PMCM :
KONSULTAN PERANCANG
TEAM LEADER PERANCANG IKI KSO TIM AHLI PERANCANG IKI KSO
3300
3000
2
Jl. Tebet Barat II No.12B T: (+62 21) 83706091
Jakarta 12810 E: adm@anggara.co.id
www.anggara.co.id
SUMP PIT
Design Consultant :
600x600-500
SUMP PIT PT. AIRMAS ASRI
3000
3300
1000x1000-1000
1 PERANCANGAN TERINTEGRASI
BANK INDONESIA DI KAWASAN
300
550 3000 3000 3000 3000 3000 550 KARAWANG DAN KAWASAN GRESIK
0
A B C D E F
5.0
.00
0
0
6.5
0
5.5
7.0
7.5
+5
+5
+5
SUN
GAI
PRY:0+
KAL
IMA
000
LAN
NOTASI BALOK ATAS
G
PRY:0+0
50
Salur
an
Tarum
PRY:0+100
Barat
ABT
PRY:0+150
PRY:0+200
1
CCTV PRY:0+214
ctv
ctv
Saluran
Tarum
Barat
P1
POS
P2
SC
05
P3
P4
CCTV
P5
P6
P7
NOTASI KOLOM
P8
B
B
P9
P10
P11
tngg
P12
ABT
3800 3000 3000 3000 3300
2
Tumpuan Dan Lapangan
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
POST&DORMITORY
OPENING
LOKASI
200
jln
CCTV
1800x400
75 CCTV
3 40
0+000
0+050
0+100
0+150
EXTEND
SICPA
0+200
0+250
EXPANSI
PERURI
0+300
0+000
+27.5ex
+32
+31
0+350
+25ex +32 +31
0+050
+35ex
+36+37+34 bottom of swale
+42.5ex
3F +41.5 bottom of swale
+44.5
+43.5
0+138
3100
3300
+42.5
CP-04
0+450
+27ex +32 +31 +39 (?)
S2 S2 S2 S2 S2
3K
0+480
+35ex
0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
+32
+31
+31
+40.0
2C
+31 +31 0+050
+27ex +32 +32 +29
0+100
3G
0+137
+28.5
Permanent water body
H
+27.5ex
+32
+31
+32
SCP-3A
+33 Patrol
H
+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)
MANHOLE
+31
3C
OPENING
Permanent water body
top level at 28.5
POTONGAN
+29.3
+32
+38
POTONGAN
+34.5 Internal Lvl
+33.5 Patrol
+34.5 TOW
+31.5 bottom of swale
1000x1000
+29.3
+32.5ex
Permanent water body
top level at 29.5
+31
300x600
+27.5ex +32 +31
+35
2B
+38
+40.0
+32
+31
+27.5ex
3H
3L
+38
0+000
3I
0+050
3
3J
0+100
+32
0+150
+31
+27.5 ex
+40
3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0
0+200
+31ex
+49
+41 +48
3B
+43.0
+44 +40
+45.5
+44.0
+40
0+250
2
+46
+45.5
3E +33
top level at 32
+37 Internal Lvl area of 730 m2
+38.5 Patrol +34
+39.5 TOW Permanent water body
+36.5 swale
+37.5ex
+44
+33
0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
BALOK 200x400
top level at 33
+46 area of 850 m2
S
0+350
+35
+32
+35
+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex
B Notes :
OPENING
300x600 B
MUTU BETON
3100
3300
- f'c 30 MPa
S2 S2 S2 S2 S2 BxH 400 x 400 - E = 25742.9602 MPa
OPENING
400x1400 BxH 200 x 400
TUL. LONGITUDINAL 12D16 MUTU TULANGAN
TUL. ATAS 3D16 - BJTS-420B
TUL. SENGKANG 4D13-100 - Fy 420 MPa
1 TUL. BAWAH 3D16 - Fu 525 MPa
TUL. CONFINEMENT D13
200
A B C D E F KETERANGAN -
PEMBERI TUGAS
Developer/ Owner:
BANK INDONESIA
DENAH BALOK ATAP Address:
KONSULTAN PMCM
Consultant PMCM :
KSO EGIS-YODYA
3800 3000 3000 3000 3300
Wisma PMI, Lantai 4 T: (+62 21) 7252577
300
Jl. Wijaya 1 No.63 E: egis-indonesia@egis.fr
Kebayoran Baru, Jakarta
Selatan, 12170
DINDING, BW1 DINDING, BW1 DINDING, BW1 DINDING, BW1 DINDING, BW1
3 DETAIL TULANGAN SLAB TEAM LEADER ENGINEERING PMCM
DETAIL TULANGAN SLAB S1, T= 800mm DETAIL TULANGAN SLAB S2, T= 250mm (Nanang Zain, S.T, M.T.)
SUMP PIT
DINDING, BW1
DINDING, BW1
DINDING, BW1
600x600-500 KONSULTAN PERANCANG
TEAM LEADER PERANCANG IKI KSO TIM AHLI PERANCANG IKI KSO
3300
3000
S1 (Sri Winarti, S.T.) (Devlin Tedy S.T, M.T.)
D19-125
D19-125
KOLOM Lead Design Consultant :
D10-150
D10-150
400x400
Balok arah y
DINDING, BW1 DINDING, BW1 DINDING, BW1 DINDING, BW1
2
300
Balok arah y
D19-125 Jl. Sultan Hasanudin
No.45, Jakarta 12160
T: (+62 21) 7237620
E: info@indokoei.co.id
www.indokoei.co.id
S1 D10-150
DINDING, BW1
A A Design Consultant :
DINDING, BW1
DINDING, BW1
3000
1000x1000-1000
S1 Revenue Tower, 25th Floor T: (+62 21) 29654000
Distrcit 8 Jenderal Sudirman E: jakarta@aurecongroup.com
SCBD Lot 13, Jakarta 12190 www.aurecongroup.com
Design Consultant :
Balok arah X
Design Consultant :
40
Jl. Cikini IV No.6 T: (+62 21) 31906688
Jakarta 10330 E: info@airmasasri.com
D10-150 www.airmasasri.com
800
250
DENAH KOLOM PERANCANGAN TERINTEGRASI
250.000
BANK INDONESIA DI KAWASAN
D10-150 KARAWANG DAN KAWASAN GRESIK
BALOK BALOK
POTONGAN B-B
SBI-IKIKSO-K-E01-DN-DR-0003
B
300
JA
LU
R P
IP AG
A S
SUN
3
GAI
PRY:0+
KAL
IMA
000
LAN
G
PRY:0+0
50
Salur
an
Tarum
PRY:0+100
Barat
ABT
PRY:0+150
PRY:0+200
1
CCTV PRY:0+214
ctv
ctv
Saluran
Tarum
Barat
P1
POS
P2
SC
05
P3
P4
CCTV
P5
300
P6
P7
P8
B
B
P9
P10
75
P11
tngg
P12
ABT
2
SHARED BUILDING OF
BRIMOB POST&DORMITORY
AND
BI INTERNAL SECURITY
3300
POST&DORMITORY
3000
LOKASI
jln
CCTV
A A CCTV
700
800
KOLOM
75
400x400
0+000
0+050
TIES
0+100
0+150
EXTEND
SICPA
0+200
0+250
EXPANSI
D10-200
PERURI
75
0+300
0+000
+27.5ex
+32
+31
0+350
+25ex +32 +31
0+050
+35ex
+36+37+34 bottom of swale
+42.5ex
3F +41.5 bottom of swale
+44.5
+43.5
0+138
+42.5
CP-04
0+450
+27ex +32 +31 +39 (?)
3K
0+480
+35ex
0+000
+34 bottom of swale
+39 (?) +37 TOW
+36 Patrol
+37 Internal Lvl
+27ex +39.0
PANJANG DINDING
+32
+31
+31
+40.0
2C
+31 +31 0+050
+27ex +32 +32 +29
0+100
3G
0+137
+28.5
Permanent water body
+27.5ex
+32
+31
+32
125
+33 Internal Lvl +31 bottom of swale
3300
+34 TOW
SCP-3A
+33 Patrol
+31 +27.5ex
+32 +32 +32
+27.5ex +32 +29.3 +31 +32 (new entrance level)
Alfresco (alt)
+31
3C
TUL. HORIZONTAL
Permanent water body
top level at 28.5
+29.3
+32
+38
D16-125
+35
2B
+38
+40.0
+32
+31
+27.5ex
3H
3L
+38
0+000
3I
0+050
3
3J
0+100
SPIRAL D10-75 +32
0+150
+31
+27.5 ex
+40
3D
+39 +37.5ex
+39.5 TOW
+38.5 Patrol
+32 Internal Lvl +39 +39 Internal Lvl
+32 Patrol
+33 TOW
+30 swale 3B+32.0
0+200
+31ex
+49
+41 +48
3B
+43.0
+44 +40
+45.5
+44.0
+40
0+250
+46
+45.5
0+300
Permanent water body
top level at 32.5
area of 550 m2
+35 Internal Lvl +34 Patrol
+35 TOW
+35 +35 +31ex
+35 Permanent water body
top level at 33
+46 area of 850 m2
S
0+350
+35
+32
+35
+36
+35 Internal Lvl
+35 TOW
0+450
0+454 +34 Patrol
+32.5ex
+50ex
+31 Patrol
+52 TOW
+49 swale
300
Notes :
550 3000 3000 3000 3000 3000 550
12000
18D19 MUTU BETON
- f'c 30 MPa
A B C D E F - E = 25742.9602 MPa
- Fy 420 MPa
- Fu 525 MPa
DENAH BORED PILE SLAB S1
SEMUA POSISI & ELEVASI MANHOLE DAN PIPA ME
TIDAK DI GAMBARKAN DISINI. LIHAT DIGAMBAR ME
500
TANAH TANAH
SEMUA MATERIAL BETON KEDAP AIR, KECUALI
250
800
PEMBERI TUGAS
Developer/ Owner:
KOLOM Ø 18D19
400x400
80
0
BANK INDONESIA
4000
Address:
Ø800.000
Jl. M.H. Thamrin No.2 Jakarta 10350
DETAIL TULANGAN BW1, T=300mm KONSULTAN PMCM
D19-125
TUL. PINGGANG
75 Consultant PMCM :
DETAIL TULANGAN BORED PILE Wisma PMI, Lantai 4 T: (+62 21) 7252577
Jl. Wijaya 1 No.63 E: egis-indonesia@egis.fr
Kebayoran Baru, Jakarta
Selatan, 12170
D19-125
BORED PILE Ø800 TEAM LEADER ENGINEERING PMCM
DEPTH = 12000
SUMP PIT
(Nanang Zain, S.T, M.T.)
600X600X-500
KONSULTAN PERANCANG
TEAM LEADER PERANCANG IKI KSO TIM AHLI PERANCANG IKI KSO
AURECON INDONESIA
600
VIEW A
Jl. Tebet Barat II No.12B T: (+62 21) 83706091
Jakarta 12810 E: adm@anggara.co.id
800 2D16
www.anggara.co.id
Design Consultant :
D19-125
125
TUL. PINGGANG
4D19 PERANCANGAN TERINTEGRASI
BANK INDONESIA DI KAWASAN
800