TRAINING PLAN

Course : Electrical Installation and Maintenance NC III

Unit of Perform installation of data measurement and control system on


Competency : electrical and auxiliary equipment
Performing installation of data measurement and control system on
Module Title :
electrical and auxiliary equipment
Modality: Check which modality will be applied. Multi-modal is allowed.

( ) Full online ( ) Blended online ( ) Distance Learning ( ) Combination


S
Learning
Contents Learning Resources
Outcomes
LO1: Plan and 1. Types and specification of
prepare wiring devices for data  CBLM, EIM NC III UC 2
works measurement and control Information Sheet 2.1-1
system Information Sheet 2.1-2
2. Function and the used of power Information Sheet 2.1-3
supply of data measurement Information Sheet 2.1-4
system and auxiliary equipment Information Sheet 2.1-5
3. Identification of tools and Information Sheet 2.1-6
materials for installation of Information Sheet 2.1-7
data measurement and control Pages 1-32
system on electrical and
auxiliary equipment  E-media presentation
4. Interpreting plan and details
drawing
5. Proper handling of materials, Applying active and non-
tools and equipment active test to ensure
6. Applying active and non-active functionality
test to ensure functionality.
7. Checking and quantifying item CONSUMABLES
as needed in the job
 30 AMP TERMINAL
requirement BLOCKS/WITH COVER
 4X4 PVC SQUARE BOX with
cover
 3/16’’ x ¾ wood screw

 2.0 mm2 THHN stranded

 75 mm2 TF wire
 #14AWGflatcord duplex wire
Prepared by:
GILBERT JON S. COMETA
SVTESDS LOREMOTIONMENDOZA@GMAIL.COM
 #14AWG royal cord
 1/1/4 inch CABLE
TRAY/DUCT
 30A DIN RAIL TYPE
CIRCUIT BREAKER (MCB)

 2 20A DIN RAIL TYPE


CIRCUIT BREAKER(MCB)
 15A DIN RAIL TYPE
CIRCUIT BREAKER(MCB)
 100 amperes Bolt-on Circuit
breaker 1NC/1NO PUSH
BUTTON SWITCH
 NO PUSH BUTTON SWITCH
 NC PUSH BUTTON SWITCH
 220VOLTS/AC RED
PILOT/INDICATOR
LAMP(PANEL MOUNT
TYPE)
 220VOLTS/AC YELLOW
PILOT/INDICATOR
LAMP(PANEL MOUNT
TYPE)
 220VOLTS/AC GREEN
PILOT/INDICATOR
LAMP(PANEL MOUNT
TYPE)
 4mm banana plug
 4mm banana binding post
 2NC 2NO Auxiliary magnetic
contactor(SC-N2 240VAC)
 AUXILIARY CONTACT
BLOCK – SZA31
 26amp-30amp overload relay
 MALE PLUG (HEAVY DUTY)
 Elastomeric paint (blue)
 4’x 8’ x ¾” plyboard

LO2: Install 1. Procedures on installation of


electrical electrical system and auxiliary  CBLM, EIM NCIII UC 2
system and equipment. Information Sheet 2.2-1
auxiliary 2. Proper usage of power tools Information Sheet 2.2-2
equipment and equipment in an Information Sheet 2.2-3
installation. Information Sheet 2.2-4
3. Types and usage of auxiliary Information Sheet 2.2-5
equipment Information Sheet 2.2-6
4. Practice proper usage of safety Information Sheet 2.2-7
harness. Information Sheet 2.2-8
5. Splicing, dressing and Pages 33-77
harnessing of wires.
Prepared by:
GILBERT JON S. COMETA
SVTESDS LOREMOTIONMENDOZA@GMAIL.COM
6. Proper termination and
mounting of devices.
7. Installing AVR and UPS
8. Types and uses of:
 UPS
 Dry type Transformer E-media presentation
 Capacitor bank Proper termination
 AVR and mounting of
 Rectifier devices
CONSUMABLES

 30 AMP TERMINAL
BLOCKS/WITH COVER
 4X4 PVC SQUARE BOX with
cover
 3/16’’ x ¾ wood screw
 2.0 mm2 THHN stranded
 75 mm2 TF wire
 #14AWGflatcord duplex wire
 #14AWG royal cord
 1/1/4 inch CABLE
TRAY/DUCT
 30A DIN RAIL TYPE
CIRCUIT BREAKER (MCB)
 2 20A DIN RAIL TYPE
CIRCUIT BREAKER(MCB)
 15A DIN RAIL TYPE
CIRCUIT BREAKER(MCB)
 100 amperes Bolt-on Circuit
breaker 1NC/1NO PUSH
BUTTON SWITCH
 NO PUSH BUTTON SWITCH
 NC PUSH BUTTON SWITCH
 220VOLTS/AC RED
PILOT/INDICATOR
LAMP(PANEL MOUNT
TYPE)
 220VOLTS/AC YELLOW
PILOT/INDICATOR
LAMP(PANEL MOUNT
TYPE)
 220VOLTS/AC GREEN
PILOT/INDICATOR
LAMP(PANEL MOUNT
TYPE)
 4mm banana plug
 4mm banana binding post
 2NC 2NO Auxiliary magnetic
contactor(SC-N2 240VAC)
 AUXILIARY CONTACT
Prepared by:
GILBERT JON S. COMETA
SVTESDS LOREMOTIONMENDOZA@GMAIL.COM
BLOCK – SZA31
 26amp-30amp overload relay
 MALE PLUG (HEAVY DUTY)
 Elastomeric paint (blue)
 4’x 8’ x ¾” plyboard

LO3: Notify 1. Processes, Operations Systems


completion of work Maintenance of tools &  CBLM, EIM NCIII UC 2
materials
Storage of tools Information Sheet 2.3-1
Information Sheet 2.3-2
2. Procedures in checking and Information Sheet 2.3-3
conforming the installation Information Sheet 2.3-4
based on job requirement Pages 78-95
3. Performing commissioning
activities  E-media presentation
4. Proper disposal of waste Principles of good
materials and hazardous housekeeping
substances

Face to Face Name of Application


( ) application that provides communication  Face to Face
between the trainer and the learners - Print-based learning
materials such as : CBLM,
training manual, Acitivity
sheets, textbooks, study
guide, workbooks, course
syllabi, correspondence
feedback and other print
formats
( ) application that allows administration of  Face to Face
assessment of learning outcomes - Print learning materials
such as : CBLM, training
manual, instruction
sheets, textbooks, study
guide, workbooks, course
syllabi, correspondence
feedback and other

Prepared by:
GILBERT JON S. COMETA
SVTESDS LOREMOTIONMENDOZA@GMAIL.COM