MBI
Company: : LEHUI Disiapkan Oleh Direview Oleh Diverifikasi Oleh Disetujui Oleh
Project : Work Leader Superintendent Konstruksi HSE officer HSE Client
Name Person In Charge : NAMA
Position :
TANDA TANGAN
:
:
Working activity
PPE Required : Safety glasses Mask dust/ Weld Coverall Safety helmet Safety shoes
Goggles/Faceshield Mask Filter-Catridge Hand gloves SCBA/SABA Earplug/Earmuff
Sequence of Basic Hazard/Aspect Risk/Impact Consequence / severity Risk Last Minute Risk
Recommendation action Result Risk*) Assessment (LMRA)
NO JobSteps Bahaya/Aspek Resiko/Dampak Akibat Assessment*
Tindakan Pengendalian PR SV RR
Tahapan pekerjaan PR SV RR STATUS TTD
1. 1. • Control of the covid
Preparation • • Health Check • • Exposure to • Suspected
Preparation of rapid test protocol,
MP(Manpower) •
Exposure to tools covid • History of covid, death /
PCR, quarantine,
Unskill and • Expiry date, new other diseases • fatality • consultation with site
Negligence • employee, Injuries and Contagion to doctors • Attendance
Employee identity
admin • Materials
lost/damaged ID, damaged other workers • is present during TBM,
and work equipment. and emergency equipment • Illness and Loss Induction and training
• Health Check • date • Materials • Safety and work Progress • Can status checks. • ID
Exposure to tools • check during TBM,
Expiry date, new
Working tool progress • not work • Sick • periodic monitoring •
employee, Pinched, Injuries to body Communicate with
lost/damaged ID, scratched. parts colleagues all
and emergency date activities carried out •
Stumble
1|Page
PT. MBI
2|Page
PT. MBI
Communicate with
colleagues all
activities carried out
• Wear proper gloves
• Use appropriate
PPE.
2
• Use the Stoel
Lifting Material Plate on the out
TANK PARTS rigger base. •
Using Ensure that the soil
(KOBELCO 50 T conditions are able
to withstand the
Crane) 1. •Tipping/ • Crane not level • Overturned crane • load of the crane. •
Positioning collapsed crane
• Pinched hands Property Ensure that the
crane • Narrow Side
damage • method of
Fatality • Lifting fastening the
at Stop • Body
2. Installing / webbing sling on
injury • Property
Take off Lifting the Material and
damage •
Equipment is
Gear Fatality
correct according
to the lifting
plan/drawing. •
Avoid pinch points.
• Crane does not
boom when setting
webbing. • The
binding is carried
out by a certified
3|Page
PT. MBI
4|Page
PT. MBI
Operators are
prohibited from
making
sudden/surprised
lifts • Define COG
(Ceter of Graffiti).
Before the load is
lifted • Use 2
taglines to direct
the load. • Make
sure the weather
conditions are
good and lifting
activities can be
carried out •
Perform a Weather
check with a
predefined tool for
measuring
weather/lightning
that has been
calibrated and can
be used
3 4. Activity TANK 3 4. Activity TANK Body injury • • Make sure the
PARTS material PARTS material Fatality • material is well
lifting material • Property
material lifting The material is damage •
laid out and not
5|Page
PT. MBI
6|Page
PT. MBI
7|Page
PT. MBI
from the
surface. •
Ensure that the
method of
binding and
lifting is in
accordance
with the
approved lifting
plan. • Use tag
lines in both
directions to
control the
load. • The
lifting gear
used has been
certified by the
3rd Party and is
still valid. •
Check the
actual goods
being lifted, and
do not exceed
8|Page
PT. MBI
the design
lifting plan. •
The lifting
radius is in
accordance
with the lifting
plan. • Use
champions to
protect the
webbing from
being
damaged. •
Install
barricades and
sign boards in
the lifting area.
• Identify the
fall zone area
(the size of the
boom length
area). • Clear
communication
by signalman
9|Page
PT. MBI
including
signaling by
hand when
work is in
progress on
operator, if
view is
obstructed use
radio for
communication
.
• Loads lifted • Material fell/slipped Asset damage
and hit workers. • • Body injury
Items that are
• Fatality
lifted swing hit
workers or the
surrounding
column/equipmen
t material. • Lifting
gear breaks or
fails and hits
workers
Swing boom •Swing boom crane • Asset damage • The lifting
hit Worker / Body injury •
Equipment/ Crane
radius is in
Fatality
accordance
10 | P a g e
PT. MBI
11 | P a g e
PT. MBI
signaling by
hand when
work is in
progress on
operator, if
view is
obstructed use
radio for
communication
.
• Traffic • Traffic • Asset damage • •
disturbance/access/ Body injury •
conditions mobilization of other
Communicatio
Fatality
work teams. n with the area
owner or
Incharge
person
regarding the
activity. •
Coordination of
work locations
that use the
main access,
which has the
12 | P a g e
PT. MBI
potential to
disrupt access
and
mobilization of
other parties. •
Installing a
Flagman to
help with traffic
control.
4. Utility Activities Lack off coordination • Overrides other • Complete the
workers • Harm to interface form
other workers 2
and coordinate
with workers at
the work site •
Locating the
work area and
equipped with a
sign board. •
Coordinate
between
supervisors and
HSE before
carrying out
13 | P a g e
PT. MBI
activities.
5 Work Activities • Contact with • Electrocution • • Monitor workers who
other activities • Exposed to have received training
that intersect Monitor SWP Perform
Danger of steam/hot water
with the Filtering/Brewing hot surface •
active coordination and
Filtering/Brewing communication both
AREA • Biological Hearing disorders internally and with utility
Area hazards • Exposed to area workers related to
(venomous materials/equipme changing conditions in
snakes/insects) nt • Inhalation of field conditions •
toxic gases • Fire • Monitor related work
Explosion steps and related
controls in the Utility
Area, both Manpower,
Work Tools, Materials
and Work Environment
• Conducting
Socialization to
Workers • Conducting
intense supervision and
daily coordination in
collaboration with HSE
regarding the HSE
Supervision Checklist •
Socializing, preparing
and reporting
emergency response
preparedness, in
accordance with
emergency mitigation •
Guide the evacuation of
workers if instructed to
14 | P a g e
PT. MBI
15 | P a g e
PT. MBI
are no materials
that have the
potential to
drop of objects
• Use
appropriate PPE
in accordance
with the hazard
control
16 | P a g e
PT. MBI