JSA Lifting Crane KOBELCO 50T Lehui English Sub

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 17

PT.

MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of
Catatan:
Setiap ada perubahan pekerja, kondisi area kerja, metode
kerja, peralatan kerja, dan / atau material, JSA harus
:
diperbarui. Registrasi terhadap perubahan JSA harus
dilakukan sekurang-kurangnya setiap minggu

Company: : LEHUI Disiapkan Oleh Direview Oleh Diverifikasi Oleh Disetujui Oleh
Project : Work Leader Superintendent Konstruksi HSE officer HSE Client
Name Person In Charge : NAMA
Position :
TANDA TANGAN
:
:
Working activity
PPE Required : Safety glasses Mask dust/ Weld Coverall Safety helmet Safety shoes
Goggles/Faceshield Mask Filter-Catridge Hand gloves SCBA/SABA Earplug/Earmuff

Sequence of Basic Hazard/Aspect Risk/Impact Consequence / severity Risk Last Minute Risk
Recommendation action Result Risk*) Assessment (LMRA)
NO JobSteps Bahaya/Aspek Resiko/Dampak Akibat Assessment*
Tindakan Pengendalian PR SV RR
Tahapan pekerjaan PR SV RR STATUS TTD
1.  1. • Control of the covid
Preparation • • Health Check •  • Exposure to • Suspected
Preparation of rapid test protocol,
MP(Manpower) •
Exposure to tools covid • History of covid, death /
PCR, quarantine,
Unskill and • Expiry date, new other diseases • fatality • consultation with site
Negligence • employee, Injuries and Contagion to doctors • Attendance
Employee identity
admin • Materials
lost/damaged ID, damaged other workers • is present during TBM,
and work equipment. and emergency equipment • Illness and Loss Induction and training
• Health Check • date • Materials • Safety and work Progress • Can status checks. • ID
Exposure to tools • check during TBM,
Expiry date, new
Working tool progress • not work • Sick • periodic monitoring •
employee, Pinched, Injuries to body Communicate with
lost/damaged ID, scratched. parts colleagues all
and emergency date activities carried out •
Stumble

1|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

• Materials • Working Wear proper gloves •


tool • Pandemic Use appropriate PPE.
covid • Exposure to
covid • History of
other diseases •
Injuries and
damaged equipment
• Safety and work
progress • Pinched,
scratched. •
Stumbled •
Suspected covid,
death/ fatality •
Contagion to other
workers • Illness and
Loss Progress • Can
not work • Sick •
Injuries to body parts
4 4 H • Control of the
covid rapid test
protocol, PCR,
quarantine,
consultation with the
site doctor •
Attendance is
present during TBM,
Induction and
training status
checks. • ID check
during TBM, periodic
monitoring •

2|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

Communicate with
colleagues all
activities carried out
• Wear proper gloves
• Use appropriate
PPE.

2
 • Use the Stoel
Lifting Material Plate on the out
TANK PARTS rigger base. •
Using Ensure that the soil
(KOBELCO 50 T conditions are able
to withstand the
Crane) 1. •Tipping/  • Crane not level • Overturned crane • load of the crane. •
Positioning collapsed crane
 • Pinched hands Property Ensure that the
crane • Narrow Side
damage • method of
Fatality • Lifting fastening the
at Stop • Body
2. Installing / webbing sling on
injury • Property
Take off Lifting  the Material and
damage •
Equipment is
Gear Fatality
correct according
to the lifting
plan/drawing. •
Avoid pinch points.
• Crane does not
boom when setting
webbing. • The
binding is carried
out by a certified

3|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

and valid rigger,


only the rigger
gives the signal to
the operator
(attached rigger
certificate). •
Coordinate well
between operator
and signal man. •
Use radio for
communication
with crane
operators in out of
 Biological hazard sight areas. • Use
weather Leather
factor(Wind or
lightning)
 Property damage glove/heavy duty
 Fatality Gloves when doing
.3. Activity Lifting work • Make sure
of TANKS • The material the sling setting
PARTS material being lifted swings, has a readable
material hitting the labile that indicates
surrounding the maximum
workers/Equipmen lifting capacity. •
t Install Softerner
when transporting
sharp-edged
materials •

4|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

Operators are
prohibited from
making
sudden/surprised
lifts • Define COG
(Ceter of Graffiti).
Before the load is
lifted • Use 2
taglines to direct
the load. • Make
sure the weather
conditions are
good and lifting
activities can be
carried out •
Perform a Weather
check with a
predefined tool for
measuring
weather/lightning
that has been
calibrated and can
be used
3 4. Activity TANK  3 4. Activity TANK   Body injury •  • Make sure the
PARTS material PARTS material Fatality • material is well
lifting material • Property
material lifting The material is damage •
laid out and not

5|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

lifted at an angle. • Material loss skewed. •


Lack of Perform a 5-10
coordination
between crane
cm lift from the
operators and surface, to
riggers • Materials check the level
fall/slipped and hit of inclination of
workers. • Body the material
injury • Fatality •
Property damage •
being lifted. •
Loss of material 4 Not near
5 E • Make sure the material when
material is boom up sling.
arranged properly • Communicate
and not tilted. •
Perform a 5-10 cm
clearly between
lift from the the signalman
surface, to check and the
the level of operator. • Only
inclination of the one signalman
material being
lifted. • Not near
can signal the
material when operator. • Stop
boom up sling. • work if
Communicate conditions are
clearly between the not safe, hold a
signalman and the
operator. • Only
short meeting

6|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

one signalman can with the work


signal the operator. team. •
• Stop work if
conditions are not
Workleaders
safe, hold a short are always in
meeting with the the work area
work team. • and supervise
Workleaders are the work in
always in the work
area and supervise
progress. •
the work in Ensure that the
progress. Hook Block
crane is
perpendicular
to the point of
gravity. lifted
item • Ensure
the stability of
the lifting point
of the
equipment
load. • Perform
a load
test/slope by
lifting 5-10 cm

7|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

from the
surface. •
Ensure that the
method of
binding and
lifting is in
accordance
with the
approved lifting
plan. • Use tag
lines in both
directions to
control the
load. • The
lifting gear
used has been
certified by the
3rd Party and is
still valid. •
Check the
actual goods
being lifted, and
do not exceed

8|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

the design
lifting plan. •
The lifting
radius is in
accordance
with the lifting
plan. • Use
champions to
protect the
webbing from
being
damaged. •
Install
barricades and
sign boards in
the lifting area.
• Identify the
fall zone area
(the size of the
boom length
area). • Clear
communication
by signalman

9|Page
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

including
signaling by
hand when
work is in
progress on
operator, if
view is
obstructed use
radio for
communication
.
• Loads lifted • Material fell/slipped  Asset damage 
and hit workers. • • Body injury
Items that are
 • Fatality
lifted swing hit
workers or the
surrounding
column/equipmen
t material. • Lifting
gear breaks or
fails and hits
workers
  Swing boom  •Swing boom crane • Asset damage •  The lifting
hit Worker / Body injury •
Equipment/ Crane
radius is in
Fatality
accordance

10 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

with the lifting


plan. • Identify
the fall zone
area (the size
of the boom
length area). •
Ensure that
lifting activities
have been
coordinated
with the area
owner and the
work team
around the
lifting area. •
Ensure the
installation of
barricades and
warning signs. •
Clear
communication
by signalman
including

11 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

signaling by
hand when
work is in
progress on
operator, if
view is
obstructed use
radio for
communication
.
  • Traffic  • Traffic  • Asset damage •  •
disturbance/access/ Body injury •
conditions mobilization of other
Communicatio
Fatality
work teams. n with the area
owner or
Incharge
person
regarding the
activity. •
Coordination of
work locations
that use the
main access,
which has the

12 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

potential to
disrupt access
and
mobilization of
other parties. •
Installing a
Flagman to
help with traffic
control.
4. Utility Activities  Lack off coordination • Overrides other  • Complete the
workers • Harm to interface form
other workers 2
and coordinate
with workers at
the work site •
Locating the
work area and
equipped with a
sign board. •
Coordinate
between
supervisors and
HSE before
carrying out

13 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

activities.
5 Work Activities  • Contact with • Electrocution •   • Monitor workers who
other activities • Exposed to have received training
that intersect Monitor SWP Perform
Danger of steam/hot water
with the Filtering/Brewing hot surface •
active coordination and
Filtering/Brewing communication both
AREA • Biological Hearing disorders internally and with utility
Area hazards • Exposed to area workers related to
(venomous materials/equipme changing conditions in
snakes/insects) nt • Inhalation of field conditions •
toxic gases • Fire • Monitor related work
Explosion steps and related
controls in the Utility
Area, both Manpower,
Work Tools, Materials
and Work Environment
• Conducting
Socialization to
Workers • Conducting
intense supervision and
daily coordination in
collaboration with HSE
regarding the HSE
Supervision Checklist •
Socializing, preparing
and reporting
emergency response
preparedness, in
accordance with
emergency mitigation •
Guide the evacuation of
workers if instructed to

14 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

the muster point •


Prepare, distribute,
supervise the use of
PPE that has been
determined according
to hazard control
6 Housekeeping/clean the  • Work area The presence of sharp • • Minor Injury • • Burns  • Perform
area working before or  • Remaining residual material • Deaf • • Bruises and •
after working fractures • • Poisoning • general
materials
 •B3 waste
• Fatality • • Activity is housekeeping
stopped • Scratches, optimally
stab wounds
according to
company
regulations •
Socialize
regarding
Housekeeping •
Ensure that the
General
housekeeping
Agenda is
always
maximized
from all
manpower •
Make sure there

15 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

are no materials
that have the
potential to
drop of objects
• Use
appropriate PPE
in accordance
with the hazard
control

16 | P a g e
PT. MBI

JOB SAFETY ANALYSIS (JSA) AND RISK ASSESSMENT (RA) FORM


Health Safety Security Environment
Document No. Rev No. Contract No : Page
Page Of

17 | P a g e