RA 01 Risk Assessment Form
RA 01 Risk Assessment Form
New
Severity Likeliho
Who / what is Rating (A) Likelihoo
affected by of d Rating od Decision
hazard conseque (B) Risk Agreed Rating(B Residu to
Sub Hazards (People / Consequences nces (Refer Level Control measures to reduce likelihood of Person time 1) al Risk ( proceed
Task/Activity Identified Environment / (Refer Table in (A X B) hazard occurring Responsible frame (after A x B1) with
Property) Table in Sect.2) control work Y/N
Sect.2) measur
es)
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REV. 01 Page 1 of 5
BSM Risk Assessment Form RA - 01
Reviewer’s Comments:
(Severity of)Consequence-A
Hospital:
Injury Perm Disability:
Fatality: Injury
FAC: First Aid LTI: Lost Time Incident requiring Injury resulting resulting in
TABLE 1 : SHIPBOARD - PEOPLE Case Hospitalizatio in permanent
n or LTI disability death
Rating 1 2 >24hours
3 4 5
Certain (Several times per annum on board) 5 5 10 15 20 25
Probable ( Happened once per annum on board) 4 4 8 12 16 20
Likelihood Possible ( Happened several times in our Company) 3 3 6 9 12 15
Unlikely ( Happened in our Company) 2 2 4 6 8 10
Highly Unlikely ( Never heard within the Company) 1 1 2 3 4 5
(Severity of)Consequence-A
Nil to Sea: Sheen on Sea: Evidence of loss
Contained to sea Les than 1m3 1 to 5 m3 to Sea More than 5 m3
TABLE 2 : SHIPBOARD - ENVIRONMENT to Sea to Sea
onboard
Rating 1 2 3 4 5
Certain (Several times per annum on board) 5 5 10 15 20 25
Probable ( Happened once per annum on board) 4 4 8 12 16 20
Possible ( Happened several times in our Company) 3 3 6 9 12 15
Likelihood
Unlikely ( Happened in our Company)
2 2 4 6 8 10
Highly Unlikely ( Never heard within the Company)
1 1 2 3 4 5
REV. 01 Page 3 of 5
BSM Risk Assessment Form RA - 01
(Severity of)Consequence-A
Negligible Minor Moderate Major Catastrophic
TABLE 4 : RA - MATRIX FOR MOC
Rating 1 2 3 4 5
Certain 5 5 10 15 20 25
Probable 4 4 8 12 16 20
Likelihood Possible 3 3 6 9 12 15
Unlikely 2 2 4 6 8 10
Highly Unlikely 1 1 2 3 4 5
Efforts are to be made to reduce the risk to green/yellow rating by placing additional controls and taking appropriate action as defined
above. However, If the final risk level is in the red zone then no job shall be undertaken. The Technical Superintendent or Fleet Manager
REV. 01 12-25 Substantial must be advised of this situation immediately. Until the final risk level is reduced so that it is no longer in the red zone the job shall not Page 4 of 5
be undertaken.”
BSM Risk Assessment Form RA - 01
Effortsthis
Use form
are to onlytowhen
be made reduceRAthe PAL
risk tomodule is not
green/yellow available
rating by placing additional controls and taking appropriate action as defined
above. However, If the final risk level is in the red zone then no job shall be undertaken. The Technical Superintendent or Fleet Manager
12-25 Substantial must be advised of this situation immediately. Until the final risk level is reduced so that it is no longer in the red zone the job shall not
be undertaken.”
REV. 01 Page 5 of 5