JUMLAH 22,728,000.00
F PEKERJAAN PENUTUP ATAPATAP
Pas Penutup Atap Genteng
1 m2 142.00 62,000.00 8,804,000.00
Palentomg Jatiwangi Super
Pas Bubungan Genteng Palentong
2 m1 58.00 38,000.00 2,204,000.00
Jatiwangi Super
3 Pas Plafond anyaman Kayu m2 142.00 35,000.00 4,970,000.00
JUMLAH 15,978,000.00
G PEKERJAAN LANTAI
Pek. Pas. Kramik Lantai 40x40
1 m2 110.00 90,000.00 9,900,000.00
Corak kayu
JUMLAH 9,900,000.00
H PEKERJAAN ELEKTRIKAL
1 Pek. Instalasi Titik Lampu Titik 3.00 275,000.00 825,000.00
2 Pek Instalasi Stop kontak Titik 3.00 275,000.00 825,000.00
Pek. Pas. MCB + Box pengaman
3 Titik 1.00 250,000.00 250,000.00
presto
4 BP Listrik PLN 1300 Watt unit 1.00 5,000,000.00 5,000,000.00
JUMLAH 6,900,000.00
JUMLAH ANGGARAN BIAYA 107,169,153.42
DIBULATKAN 107,000,000.00