Professional Documents
Culture Documents
Instruction Manual - NB124 - Order No 262919,262920 - 4H100-1250HS+VS
Instruction Manual - NB124 - Order No 262919,262920 - 4H100-1250HS+VS
Instruction Manual - NB124 - Order No 262919,262920 - 4H100-1250HS+VS
Page no.1
INDEX
1. Arrangement Drawing-----------------------------------------------------------------04
4. Maintenance------------------------------------------------------------------------------- 15
4.1 Propeller hub & pull rod------------------------------------------------------------ 16
4.1.1 Pitch test-------------------------------------------------------------------------- 16
4.1.2 Vibration test--------------------------------------------------------------------- 16
4.1.3 Propeller hub & pull rod lubrication------------------------------------------ 17
4.2 O.D Box & Servo piston------------------------------------------------------------ 17
4.2.1 Temperature test----------------------------------------------------------------- 17
4.2.2 Leak test-------------------------------------------------------------------------- 17
4.3 Hydraulic system-------------------------------------------------------------------- 18
4.3.1 Change of oil--------------------------------------------------------------------- 18
4.3.2 Strainers-------------------------------------------------------------------------- 18
4.3.3 Filter elements------------------------------------------------------------------- 18
4.3.4 Lubrication of stern tube------------------------------------------------------- 18
4.3.5 Lubrication of rudder tube----------------------------------------------------- 19
4.3.6 Lubrication of shaft bracket & support bracket----------------------------- 19
Page no.2
5. Installation--------------------------------------------------------------------------------- 20
a. Assembly procedure of blades in propeller hub-------------------------------------- 21
b. Alignment of propeller system--------------------------------------------------------- 22
c. Fitting of shaft coupling----------------------------------------------------------------- 23
d. Adjustment of end stop for gearbox servo-------------------------------------------- 24
6. Component Detail----------------------------------------------------------------------- 25
a. Rudder assembly & part list------------------------------------------------------------ 26
b. Propeller system assembly & part list------------------------------------------------- 29
c. Shaft bracket, v type assembly & part list-------------------------------------------- 32
d. Support bracket, I type assembly & part list----------------------------------------- 35
e. Water lubricated stern tube assembly & part list------------------------------------- 38
f. Shaft coupling piston assembly & part list--------------------------------------------41
g. O.D box assembly & part list----------------------------------------------------------- 45
h. Hydraulic power pack(HPU) assembly & part list-----------------------------------49
i. KEMEL seal instruction manual------------------------------------------------------- 53
j. Lubrication datasheet-------------------------------------------------------------------- 54
k. Electric diagram-------------------------------------------------------------------------- 66
Page no.3
1.
Arrangement Drawing
Page no. 4
Gearbox
Face of Refrence I O.D box service length
705
se dwg. 2022086
100
100
1128 1260
D = 1250
140
230
15 Propeller shaft angle = 4,6
650 460.5
0,53 m2
Max. turning 43
angle = 35 (adapter)
dwg. no 2022095 430
55.10
210 395 2000 210 (Attachment of oil distribution box)
3273
Gearbox
Face of Refrence I
262919-20
Cust. 1:17 PHONE : +47 71 20 29 00
FAX : +47 71 20 29 01
Grovfjord Mek. Verk
sted. Replacement for : Replaced by :
PROPELLER ARRANGEMENT
4H100-1250HS-ZF3355 Drawing no. /File name
Page no. 6
DATA SHEET
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
COSTUMER : Grovfjord mek. Verksted AS
CLASSIFICATION : DNV
_______________________________________________________________________________
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Page no. 7
CLASSIFICATION – PROPELLER PLANT
Sign. : ...............................................................
Helseth as – Baklivn. 11-13, N-6450 Hjelset – Molde, Norway – Phone: +47 71 20 29 00 – Fax: +47 71 20 29 01
E-mail : helseth@helseth.no – Internet : www.helseth.no
Bank: Romsdals Fellesbank – Banking giro: 9650.05.77751 – Postal giro: 0805 54789938 - Org.no.: NO 959 730 784 MVA
CLASSIFICATION – PROPELLER PLANT
Sign. : ...............................................................
Helseth as – Baklivn. 11-13, N-6450 Hjelset – Molde, Norway – Phone: +47 71 20 29 00 – Fax: +47 71 20 29 01
E-mail : helseth@helseth.no – Internet : www.helseth.no
Bank: Romsdals Fellesbank – Banking giro: 9650.05.77751 – Postal giro: 0805 54789938 - Org.no.: NO 959 730 784 MVA
3.
System Description & Operation
Page no. 10
3.1 Introduction
This manual provides instructions and information on operation and maintenance of the Helseth
CPP and corresponding equipment produced by Helseth as. Information on operation and
maintenance of equipment delivered, but not produced by Helseth as, is found in separate manual
The propeller is a controllable pitch propeller with water lubricated stern tube and bearings. The
pitch of the propeller blades is controlled by a pull–rod connected to the pitch mechanism in the
grease lubricated propeller hub. The pull–rod is connected to a servo cylinder positioned between
the propeller shaft coupling and the reduction gear outgoing flange. The servo cylinder is operated
by an oil distribution box (OD–box) positioned on the front side of the outgoing shaft of the
reduction gear. The outgoing shaft of the reduction gear is hollow bored and oil is distributed from
the OD–box to the servo cylinder through pipes going through the hole in the reduction gear shaft.
Oil is distributed into the two chambers of the OD–box from a separate power pack with integrated
proportional valve. Feedback of the pitch position is given by an inductive position sensor
positioned on the OD–box. The system is operated electronically from a remote control on the
The Helseth CPP type 4H is grease lubricated propeller hub. Grease is pressed into the hub
through a plug hole on the forward half of the propeller hub. The pull–rod is lubricated by
grease through a plug hole in front of the propeller shaft. For maintenance instructions see
Page no. 11
The propeller blades are connected to a CPP mechanism inside the propeller hub. The CPP
cylinder positioned between the shaft coupling on the forward end of the propeller shaft and the
outgoing gear shaft flange. When the pull–rod is pushed backwards by the servo piston the
pitch on the propeller blades is increased, and vice versa. See the propeller system assembly
The propeller system has three water lubricated cut less bearings. One positioned in the shaft
bracket just in front of the propeller hub, second positioned in the support bracket and third is
positioned in the aft part of the stern tube. The aft bearing is lubricated by seawater passing
through the gap between the bearing and the propeller shaft. No forced water circulation is
needed. See the stern tube assembly drawing, shaft bracket assembly drawing & support
The propeller shaft coupling is mounted on the forward end of the propeller shaft and is
connecting the propeller shaft to the servo cylinder. The shaft coupling is of SKF shrink-fit
type. For detailed instructions on how to mount and de–mount the shaft coupling see the
A servo cylinder is connected between the shaft coupling and the outgoing reduction gear shaft.
The servo cylinder is controlled by oil through the OD box positioned in front of the reduction
gear, and ensures correct pitching of the propeller blades. The servo piston is positioned inside
Page no. 12
the servo cylinder and is connected to the pull-rod from the propeller via a connection piece
inside the shaft coupling. The pull rod and the connection piece are visible through the oblong
holes on the mid part of the shaft coupling. The theoretical zero pitch position is described in
the shaft coupling assembly drawing. The described position can be measured through the
oblong holes.
Distribution of oil to the servo cylinder is done through the oil distribution box (OD box)
connected to the front side of the reduction gear outgoing shaft. Oil is flushed through the plugs
on top of the main hub of the OD box for distribution to the servo cylinder. The distribution of
oil into the two plugs is operated by a proportional valve positioned on the separate power
pack. Leakage oil from the OD box is returned to the power pack via an oil cooler positioned
on the power pack. The main oil pump for the system is driven by the PTO on the reduction
gear, but taking oil from the oil tank of the power pack. A backup electrical motor is also
positioned on the power pack, driving a backup pump. The backup pump is serving the shaft
brake and working as a booster pump for the PTO driven pump when there is need for extra
servo force (low pitch and high propeller rpm). See the hydraulic diagram in appendix for
details.
Page no. 13
3.6 Rudder system
The rudder system consists of a rudder tube, two grease lubricated rudder bearings, a top
mounted rudder bearing plate and a spade rudder. The spade rudder is operated by a steering
If the electrical system fails, it is possible to operate the propeller pitch by the handle on the
proportional valve positioned on the power pack. Ensure that the valve is done potential free
before it is operated manually. The servo system, and mainly the OD box, is leaking.
Consequently the pitch will slowly move out of position if the valve is not operated
continuously.
Page no. 14
4.
Maintenance
Page no. 15
Cleanliness is of prime importance for correct and trouble–free operation of the system. When
inspecting, servicing or repairing any component or line in the system, make certain that the parts
The propeller hub is connected to the conical part of the propeller shaft by the SKF oil injection
method. For mounting and demounting of the propeller hub, please see the installation section.
Check pitch of blades against corresponding pull rod position every time the vessel is in dry-
dock to be sure they correspond. On the propeller hub there are four marks, one at the base
of each blade foot. When the corresponding mark on each propeller blade is situated on line
with the mark on the propeller hub the propeller is in the theoretical zero pitch position. The
pull rod shall then be in position as described in the shaft coupling assembly drawing found
in the appendix.
Operate the system while in dry dock and test blades and hub for vibrations that would
Page no. 16
4.1.3 Propeller hub & pull rod lubrication
The propeller shall be refilled with grease once a year, plus every time the vessel is in dry
dock. This is done by pressing grease through the plug hole on the propeller hub situated
right in front of one of the propeller blades. The pull rod shall be lubricated two times per
week through the grease nipple on the forward end of the propeller shaft inside the shaft
Do not open the OD box or servo piston for inspection more often than once a year unless
excessive bearing temperatures or noise indicate that adjustments or repairs are required. Every
second year all seals are to be changed by new ones, both in the OD box and the servo piston.
See assembly drawing of OD box and shaft coupling with servo piston in appendix for part
numbers of seals.
Periodically during operation check the temperature of the OD box. Temperature must not
Periodically during operation visually inspect the OD box and servo cylinder for oil leaks.
Page no. 17
4.3 Hydraulic system
The recommended viscosity for oil in the hydraulic system is 20 to 50 CST at working
condition. The oil pumps are the restricting components. The absolute outer limits of viscosity
of the oil in working condition is a minimum of 10 CST and a maximum of 100 CST.
The oil in the hydraulic system has to be changed after the first 200 working hours.
4.3.2 Strainers
Clean the strainers every day for the first week of operation after installation or overhaul of
the system. Thereafter clean the strainers once a week for a month. Thereafter clean the
Clean the filter elements one week after initial installation or overhaul of the system.
The stern tube is water lubricated, in an open system. Water is circulated by forced
circulation inserted through one of the plug holes in front of the stern tube. The stern tube is
open in the aft and water can flow freely into the sea. Sea water can be used for lubrication.
Page no. 18
Water amount is min. 30 L/min. cooling water should not be supply from engine. It should
The rudder tube is grease lubricated. After mounting of the rudder into the rudder tube the
rudder tube is lubricated by pressing grease into the plug hole at the top of the rudder tube.
The rudder tube shall be lubricated two times per week. See the rudder assembly drawing
for details.
Shaft bracket and support bracket are water lubricated. Sea water can be use. Minimum
distance between shaft bracket and propeller hub (forward face) should be 15 mm which
allow enough water flow to bracket bearing. Water amount for shaft and support bracket
Page no. 19
5.
Installation
Page no. 20
(a) Assembly procedure of blades on propeller hub
Type 4H100
ASSEMBLY OF BLADES IN
MONTERING AV VINGER I PROPELLER HUB.
PROPELLHODE. Replacement of propeller blades, e.t.c.
Bytte av propellvinger, e.t.c.
• The forward hub half is fitted onto the propeller shaft.
• Fremre hodehalvdel er montert på propellakselen. • The aft hub half have the guide shaft for the guide
• Bakre hodehalvdel har styring for skyvestykke fitted.
montert. • All parts that are to be fitted are cleaned of dirt e.t.c.
• Alle deler som skal monteres er rene for smuss e.t.c.
1. Fill both hub halfs with grease.
1. Fyll begge hodehalvdelene med grease. 2. The guide with fitted pull rod is fitted into the shaft.
2. Skyvestykket med trekkstang monteres i akselen. See to that the crankstuds of the guide is behind the
Se til at tappene for vingeklossene kommer bakenfor forward hub half.
fremre hodehalvdel. 3. Fit the crank blocks onto the crankstuds of the guide.
3. Monter vingeklossene på tappene på skyvestykket. 4. Fit the o-rings to the propeller blades.
4. Monter o-ringene på propellvingene.
• The propeller blades are stamped with a number form 1
• Propellvingene er merket med et nummer fra 1 til 4. to 4. The boss for the propeller blades are stamped
Bossene for propellvingene i propellhodet er merket correspondingly. Propeller blade stamped 1 is placed in
tilsvarende. Propellvinge merket 1 monteres i boss boss stamped 1 and so on.
merket 1 o.s.v.
5. The propeller blades are fitted into the propeller hub
5. Propellvingene monteres i propellhodet ved å plassere by placing the track in the blade root onto the crank
sporet i bladroten på vingeklossen og så vri vingen på block and then turning it into the boss.
plass i vingebosset.
• Both the forward and aft hub half are stamped with 0.
• Både fremre og bakre hodehalvdel er merket med 0.
6. After fitting of the propeller blades the aft hub half is
6. Etter at propellvingene er kommet på plass monteres fitted to the forward hub half with the stamping 0
bakre hodehalvdel til fremre hodehalvdel med facing each other.
merkene 0 mot hverandre. 7. When the pitch is finished adjusted, tighten the bolts
7. Boltene trekkes til med et moment på 260Nm for 4H100 with a torque of 260Nm for 4H100.
.
Page no. 21
Page no. 22
(C) Fitting of shaft coupling
Page no. 23
(D) Adjustment of end stop for gearbox servo
A = 40,1mm. B = 28 mm.
Page no. 24
6.
Component Detail
Page no. 25
6.
(a) Rudder assembly & Part list
Page no. 26
11
10
9
Keyway, 22X14X60
70
155
RUDDER PIN IS YARD SUPPLY A 160
2
150
935
5
4
160
10
This clearance is
very important
0,53 m2
950
DETAIL A
SCALE 1 : 1
1
3 562 220
2022095
Refer to : Weight :
Rudder 2010386 N/A
Page no. 27
Drawing no. : 2022095 | RUDDER ARRANGEMENT, ASSEMBLY
Propeller type : 4H100-1250HS+VS
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
3 1 2041785 Bearing
4 1 2041786 Bearing
7 1 2010386 Rudder
8 1 2041688 Key
10 1 2041822 Nut
11 2 2060973 Screw
_________________________________________________________________________________
UPDATES:
Page no. 28
6.
(b) Propeller system assembly
&
part list
Page no. 29
14
15
12
1 22
10 8 7 6 5 13
18 7 Nm/Thread locking
19
A
17
2
9
3/4 23 5 21 11 20
60 Nm 260 Nm
Use Locktite 243
DETAIL A
Order No : Cust.
261739-41,43 Grovfjord mek. verksted As
1:3 PHONE : +47 71 20 29 00
FAX : +47 71 20 29 01
2010387
Refer to : Weight :
N/A
Drawing no. : 2010387 | PROPELLER SYSTEM, ASSEMBLY
Propeller type : 4H100-1250-HS+VS
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
17 1 2070408 O-ring
19 1 2060034 Plug
Page no. 31
6.
(c) Shaft bracket, V type assembly
&
Part list
Page no. 32
Page no. 33
Drawing no. : 2032091 | SHAFT BRACKET, V TYPE, ASSEMBLY
Propeller type : 4H100-1250HS+VS
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
UPDATES :
Page no. 34
6.
(d) Support bracket, I type assembly
&
Part list
Page no. 35
1
2032092
Page no. 36 Refer to : Weight :
support bracket 2022086 N/A
Drawing no. : 2032092 | SUPPORT BRACKET, ASSEMBLY
Propeller type : 4H100-1250HS+VS
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
UPDATES :
Page no. 37
6.
(e) Water lubricated stern tube
assembly & Part list
Page no. 38
KEMEL Stern tube seal, 100
" Water lubricated "
1 2 3
2022097
Page no. 39 Refer to : Weight :
stern tube 2022098 N/A
Drawing no. : 2022097 | WATER LUBRICATED STERN TUBE, ASSEMBLY
Propeller type : 4H100-1250HS+VS
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
UPDATES:
Page no. 40
6.
(f) Shaft coupling piston assembly
&
Part list
Page no. 41
475 Nm, Use Locktite 243
21 25 26 23 24 10 27 20 17 18 19 28 11 1 8 7 5 2 4 3
99
(Neutral position
End of Push-Pull rod)
Pull up distance : 11.2
27 22 15 14 12 16 9 10 6
29/30
Max. pressure : 375 bar Distance between
flanges 0.5-1 mm.
Pull rods fitted
end to end. 83.5 44 32
183 220
End of propeller shaft
13 79 Nm
2022093
Refer to : Weight :
coupling 2022094 N/A
Page no. 42
Drawing nr. : 2022093 | SHAFT COUPLING WITH PISTON, ASSEMBLY
Propeller type : 4H100-1250HS+VS
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
01 1 2032083 Cylinder
03 12 2061020 Nut
04 1 2070423 O-ring
06 1 2070408 O-ring
07 1 2061010 Nut
08 1 2032086 Piston
10 1 2070141 O-ring
16 1 2070461 O-ring
23 1 2031456 Piston
24 1 2070359 O-ring
Page no. 43
===============================================================================
Ref. Qty. Part no. Text Note
===============================================================================
27 2 2060281 Plug
29 1 2060255 Plug
30 1 2070441 Packing
_________________________________________________________________________________
UPDATES :
Page no. 44
6.
(g) O.D box assembly & Part list
Page no. 45
Use Locktite 243
79 Nm
1 3 2 4 3 7 5 22 15 20 15 20 14 15 12 9 10 11 29 30 27
16/17 A
28
Locktite 577
B 34 8 31 23 6 19 18 6 25 26 24 26
102 Nm 40 Nm
136 Nm 40 Nm
Use Locktite 243 79 Nm
80 460.5
SECTION A-A
SCALE 1 / 2
3 2 2070159 O-ring
14 1 2021633 Bearing
15 3 2070421 O-ring
22 1 2070387 O-ring,
25 1 2070132 O-ring
Page no. 47
===============================================================================
Ref. Ant. Delenr. Tekst Merknad
===============================================================================
29 1 2060931 Nut
30 1 2070418 O-ring
34 1 2070067 O-ring
_________________________________________________________________________________
ENDRINGER :
Page no. 48
6.
(h) Hydraulic power pack (HPU)
&
Part list
Page no. 49
a b
Partslist
Customer
Drawing no 24172-C
Project ID HYD-85002
Date 21.04.2016
Rev C 21.04.2016
Pos 17 changed from 2 to 3 pcs
Pos 26a added
Page no. 52
6.
(i) KEMEL seal instruciton manual
Page no. 53
Page no. 54
Page no. 55
Page no. 56
Page no. 57
Page no. 58
Page no. 59
Page no. 60
Page no. 61
Page no. 62
Page no. 63
6.
(j) Lubrication datasheet
Page no. 64
SMØRESKJEMA LUBRICATION SHEET
• Propellhodet er fylt med fett. • The propeller hub is filled with grease.
• Propellhodet fylles opp med fett 1 gang per • The propeller hub is refilled with grease
år og hver gang fartøyet er i dokk. once a year and every time the vessel is
in dry dock.
• Trekkstangen smøres ukentlig gjennom
smørenippelen på enden av propellakselen. • The pull rod is lubricated weekly thru the
grease nipple on the end of the propeller
shaft.
BP Energrease A1 BP Energrease A1
Page no. 65
6.
(k) Electric diagram
Page no. 66
2051613
Pressure switch
Page no. 67
2051613
(Pressure switch)
Page no. 68