DATE ACTIVITY
- Check & Inspection Engine Room
- Check & Inspection Monitoring Crane
- Check & Inspection Dozer. 1,2 & 3
- Check Battery AG.3
- Check Dinamo Starter At AG.3
1-Aug-2022 - Cleaned Drum Oil At Main Deck
- Remove Monitor Camera At Cabin Crane
- Check Temperature Motor Hoist 1 & 2
- Welding Grabe
- Check Switch Magnetic At AG.3
- Check Battery Charger DeepSea At AG.3
- Check & Inspection Monitoring Crane
- Check & Inpectin Dozer. 1,2 & 3
- Check & Inspection Engine Room
- Check Temperature Motor Hoist 1 & 2
- Check Temperature Motor Blower Of Hoist 1 & 2
- Installed DynamoStarter At Dozer.2
2-Aug-2022 - Cleaned Air Filter Of Turbocharger At AG.3 & 2
- Cleaned Body AG.3
- Welding Bolt Track At Dozer.2
- Renewed Fuel Filter ( Donaldson P550687 ) 3Pcs & Element Filter ( Separ 04030 ) 1Pcs At MG.1
- Replace Filter Hoist Brake At Crane
- Drain Air Of Brake At Hoist 1 & 2
4-Aug-2022
- Check Temperature Motor Hoist 1 & 2
4-Aug-2022 - Cleaned Floor At Crane & Cleaned Electric Room Crane
- Welding Pipe Hydraulic Winch After At Pump Room
- Replace Railing At Main deck
- Changed Air Filter Of Alternator At MG.2
- Cleaned Air Filter Of Turbocharger At Dozer.1
- Check & Inspection Monitoring Crane
- Check Temperature Motor Hoist.1 (49.8 Celcius) & Hoist.2 (60.7 Celcius)
- Check & Inspection Dozer. 1,2 & 3
- Check & Inspection Engine Room
- Changed Lamp Philips Tornado At Crew Cabin & Mess Room ( 2pcs )
- Cleaned AG Room
5-Aug-2022
- Changed Air Filter Of Alternator At AG.1, 2 & 3
- Renewed Magnetic Switch At AG.3 ( 3050692 ) 1 pcs
- Renewed Battery At Dozer.1 ( 3T-5760 ) 1 pcs
- Install Track Dozer.1
- Cleaned Pump Room
PREPARED
MAULANA SOFYAN R. R
2nd ENGINE
DAILY WORK
FC. STRAITS PHOENIX
ACTIVITY
nspection Engine Room
nspection Monitoring Crane
nspection Dozer. 1,2 & 3
Pump Room
LANA SOFYAN R. R
2nd ENGINE
PICTURE
BEFORE AFTER
ACKNOWNLEDGE
ODIK ROSIDI
CHIEF ENGINER