Professional Documents
Culture Documents
Kelompok 3 - Tugas4TBK
Kelompok 3 - Tugas4TBK
Kelompok 3 - Tugas4TBK
KELOMPOK 1
Muhamad Riza Alifviar 21090120140136
Catur Wahyu Cahyono 21090121140090
Davis Rian Kusuma 21090121140117
Bintang Aji Prakoso
Rahmat Faizal
Lilik Achmad Prasetyo 21090121120022
Jawaban :
3.
Answer
Sol’n
KG ship = 3.75m KM = 5.5m
KG compartment = 0.75m KG = 3.75m
Distance = 3.0m GM = 1.75m
KM =6 m KG = 5.5 m
GM = 6 – 5.5 = 0.5 m
ρ DockWater = 1024 kg / m3
ρ oil = 960 kg / m3
Shifted distance = 15 m
7.
A. Km at draft 1.5
KM = KB + BM
= 0.75 + 5.5
= 6.25 m
km at 4.5
KM = KB + BM
= 2.25 + 1.851
= 4.101 m
B. MINIMUM KM = 4.08 m
8. DIK : LOA : 60 M
B : 13.73 M
T:8M
8.
Jawaban
B. AT 3.65 DRAFT
Draft KB = 1/2 draft BM = B^2/12d KM = KB + BM
3.65 1.825 4.3 6.125
Gm = km - kg
= 6.125 - 4.35 = 1.775 m
C. At 5.6 m draft
Gm = km - kg
= 5.6 - 5.6
=0m