TENDER DOCUMENTS
LOCATION: TITLE:
Western Coast VOLUME IX PART PG-B211
PACKAGE: TECHNICAL SPECIFICATIONS
CIVIL WORKS - BUILDINGS
SCALE: REV:
None Q A 1 0 - H - 0 4 1 1 C
SUBCONTRACTOR:
Sheet 1 of 22
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
Disclaimer
The content of this document is intended for the exclusive use of Fichtner’s client and
other contractually agreed recipients. It may only be made available in whole or in part to
third parties with the client’s consent and on a non-reliance basis. Fichtner is not liable to
third parties for the completeness and accuracy of the information provided therein.
4871A95/S133Doc-801060045-7065 2
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
Table of Contents
List of Tables 4
1. General 5
2. Layout 6
2.1 General 6
4871A95/S133Doc-801060045-7065 3
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
List of Tables
Table 4-1: Electrical (switchgear) and Control and building- Description of the building. 17
4871A95/S133Doc-801060045-7065 4
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
1. General
This specification covers all construction work required for the erection of
the Project and the necessary auxiliary plants complete in every respect and
suitable for satisfactory operation. The work comprises the manufacture or
supply of fully functional buildings and structures as they result from the
requirements connected with their purpose.
The various buildings and parts of the plant must form an architectural,
structural and functional unit with the other parts of the plant. Special
attention must be paid, in addition of basic design and construction, to the
aspects which are specific to country and climate.
The works shall be designed with due regard to the need for inspection,
cleaning and maintenance, and shall be capable of operating for prolonged
periods with the minimum of inspection, adjustment and maintenance.
All equipment performing similar duties shall be of a single type and make
in order to limit the stock of spare parts required.
All material shall be new and of the best quality suitable for working under
the conditions, variations in temperature and load encountered in service
without undue distortion or deterioration or the occurrence of undue stresses
in any part, such as to affect the efficiency and reliability of the plant.
The Contractor is not allowed to use the works, the material or furniture or
parts thereof for temporary purposes without the written consent of the
Employer and the Engineer.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
2. Layout
2.1 General
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
The extent of the civil works for the above sectors consists basically of, but
is not limited to the following services:
· topographic and bathymetric surveying works, subsoil investigations,
transient analysis
· site preparation and earthworks including all soil improvements required
· foundation works based on the result of Contractors soil investigation
report
· concrete and masonry works
· structural steelwork
· finishing works
· piping inside the buildings (drinking, sewage, rainwater, etc.)
· sanitary installations
· roads, hard standings and surfacing
· fences and gates
· walls
· civil works for pipelines and ducts, trenches and/or tunnels including
water transmission pipe line
· storm water drainage system
· detailed design of all above mentioned civil works including structural
analysis, workshop drawings, tests, etc. in accordance with the “General
Design Criteria” laid down in the “Civil Part” of Part PG-B0.11
“General Technical Requirements”, Volume VII.
· supply of all labor, materials, plant, equipment, temporary work, tools for
constructing the above-mentioned civil works.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
While the civil works are in progress the Contractor shall employ suitably
qualified competent English-speaking civil engineers to be full time on the
site to verify the work, quality and progress of the civil subcontractor. These
Engineers shall have at least ten years’ experience of working in operational
desalination plants and be responsible for liaison with the Engineer’s
Representative at site.
The Contractor’s Engineers shall inspect, check and test the work and assure
himself that it is wholly satisfactory before submitting any item to the
Engineer for his approval.
To ensure proper quality assurance the Contractor shall submit for approval
a Civil Works Quality Plan as stated in Volume VI, Part P-A5 of this
specification.
All work shall be constructed to the lines and levels shown on the drawings
prepared by the Contractor and approved by the Engineer unless varied by
written instruction of the Engineer.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
All designs shall be prepared in accordance with the very best current
engineering practice and with the requirements of this Specification and the
appropriate National Codes of Practice and Standards approved by the
Engineer in so far as they are applicable and up-to- date. Any departure
from the appropriate Codes and Standards must be fully explained in writing
for the Engineer’s approval.
The buildings, structures and roads within the site and their design and
detailing shall comply with and satisfy the fundamental technical and
operational requirements of the mechanical and electrical plant to be
accommodated therein and with the requirements of this specification.
All basements and ducts, trenches and/or tunnels inside buildings shall be
provided with suitable permanent pumps and sump pits to enable water
spillage and firefighting water to be easily removed. Design and execution
of all ducts, trenches, tunnels, etc. must avoid any stagnating liquids inside
the structures.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
All civil designs and drawings, inclusive all steel designs and drawings must
be approved by the requirements of the relevant authorities of the Kingdom
of Saudi Arabian and as per local order before start of construction. If the
Contractor and/or his Subcontractor(s) starts with the production of any
constructive elements, etc. off site and/or on site, before that approval was
given, all changes in Contractor’s work caused by disapproval and/or
remarks will be fully on Contractor’s risk.
All main routings (pipe racks /culverts /tunnels /trenches /ducts /duct banks)
for all lots (piping, electrical/cabling, etc.) shall be submitted by the
Contractor for approval by the Engineer.
The Bidder has to show that his offer is complete and fulfilling all
requirements described in Part A of the Tender Documents.
If dimensions /measure are given in the Tender, they indicate the minimum
size only. The Bidder has to show, if those are sufficient to fulfill all
functions of the plant as described in Tender Documents.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
Requirements
The requirements listed here regard the function of the building and/or
construction sections will take precedence over the two following parts
(scope and special design requirements).
Scope
In this part the service to be rendered for each building will be described,
and for the qualitative minimum requirements reference will in each case be
made to the Volume VII, Part PG-B0 “General Technical Requirements”.
The Contractor may still effect alterations within the framework of these
minimum requirements as regards function and quality in the course of the
detail planning with the Engineer’s approval.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
The Contractor is responsible for carrying out all investigations which are
considered necessary for the verification of the above reports and for the
proper design, construction and performance of the plant.
Details of the required surveys and studies are specified in Part PG-B0.11
of Volume VII.
The entire site shall be filled up to -0.3 m (relative levels to final site
datum).
The finished ground floor slab levels of buildings shall be around 0.2 m
above site datum.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
All roads shall have sidewalks (interlocking pavement) on both sides of the
road with a minimum width of 150 cm each.
The above-mentioned roads and the width of the roads are to be considered
as minimum requirements. They have to be verified by the Contractor in his
detailed design and have to be corrected as necessary.
The area around the buildings which are used infrequently, the laydown
areas for small loads, the footpaths, the parking areas, etc. shall be paved
with interlocking concrete blocks.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
The area of the site which is not covered by buildings, structures, roads and
pavings, plants, etc. shall be treated to prevent erosion.
Road signs, traffic signs, road surface marking and guard rails shall be
provided as per the local police requirements for traffic industrial areas.
The roads and pavings shall be laid to falls leading the storm water to
gullies or catch pits.
For dimensioning the roads and pavings, the actual traffic will have to be
considered, however a minimum standard truck SLW 60 (according to DIN
1072) shall be considered for dimensioning the roads.
For the entire plant, a complete stormwater drainage system is required. The
stormwater drainage system shall be based on the drainage of all areas (built
up, paved or unpaved areas) within the plant limits with final plant area
gradings.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
The storm water drainage shall include all necessary gutters, down pipes,
gullies, traps, catch pits, manholes, etc. and shall be incorporated in the
plant drainage system.
Scope
The basis for the design of the stormwater drainage system is formed by the
general layout drawings and includes, but is not necessarily limited to, all
main and collection lines with manholes, pumping stations, house
connections and all associated works.
To ensure a proper and safe operation of pumps, they shall work alternately.
The pumps shall be of submersible type and shall be fitted with
automatically operating level switches.
Design criteria
The disposition of the stormwater pipes or culverts is given by the levels of
the area to be drained as well as by the road levels. The pipes or culverts
slopes shall be minimum 0.5%.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
· The Electrical & control building shall house all necessary electrical
equipment such as switchgear, VFD, battery, etc.
· The building shall accommodate the following main rooms:
· main control room and related electronic rooms (See Part PG-B210
of Volume IX);
· MV switchgear rooms (14.5 kV and 6.6 kV in separate rooms)
· VFD room
· LV room
· UPS room
· Battery room
· Emergency generator room.
· cable basement with a clear headroom of min. 2.5m and concrete
stairs with hard wearing covering and anti-slip nosing
· outside and adjacent to the building: transformer foundations/bays for
respective type of transformers in case of external transformers.
· for detailed requirements of electrical room see Part PG-B209.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
· The control room shall be fitted with windows including sunshade and
shall be made with suspended ceilings. For the raised platform floor in
the control room and the electronic rooms account must be taken of
electrostatic problems and the ceiling shall be of sound-absorbing design.
· These rooms must be equipped with due consideration for the sound
emissions, the electronic antistatic requirements, lighting and the climate
requirements.
· The building shall be sufficient for GRS.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
The chain link fence shall be min. 2.5 m about ground level. It shall consist
of plastic-coated hot dip galvanized steel wires and posts.
The posts shall have cranked tops set at 45° to the posts to which shall be
attached three strands of hot dip galvanized barbed wires.
The gate shall be fitted with a vertical drop bolt on each leaf, a sliding bar
lock with padlock eyes and a padlock to prevent movement of the sliding
bar lock. All these fittings shall be hot dip galvanized and plastic coated.
The vertical drop bolts shall drop into hot-dip galvanized steel tubes cast
into the road to secure the gates when in both closed and open positions.
Gate posts shall be made of plastic coated hot-dip galvanized steel section
and set in concrete in the ground. Gate hinges (pivots) shall be hot dip
galvanized and plastic coated.
Transformer compounds:
Transformers shall be supported on reinforced concrete foundations.
Each transformer shall be enclosed by reinforced blast resistant concrete
walls on three sides, designed to prevent the spread of fire and limit the
effects of explosion. Fire ratings after international standards shall be
followed. The remaining side (access side) shall be provided with a
removable un-climbable bird proof stainless steel palisade fence fitted
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
with a lockable personnel access gate also for bigger compounds. The
bays shall be of sufficient size to permit safe working and provide
adequate room for installation, maintenance, removal and cooling of the
transformers. Removable structural steel and galvanized steel metal
cladding ventilated (saw tooth type) sun canopies shall be provided over
transformer compounds.
Provision shall be made for the catchment of oil spillage and fire deluge
water from the transformers resulting from mechanical or electrical
failure.
Each oil pit shall drain into a central oil collecting pit with integrated oil
separator conforming to VDE-Standard.
The oil collecting pit shall be sized to hold the oil capacity of the largest
transformer and the maximum quantity of fire deluge water.
The oil separator shall be sized to hold the oil capacity of the largest
transformer.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
4.2.8 Cable and pipe ducts, trenches and/or tunnels outside buildings
· The necessity of providing cable and pipe ducts, trenches and/or tunnels
as well as the approximate routes of these ducts, trenches and/or tunnels
are specified in the relevant clauses of specification e.g. Part PG-B209
and PG-B210 of volume IX for electrical and I&C works, etc.
· With regard to the cable and pipe ducts/trenches and/or tunnels the
following items are included in the scope of supply:
· all cable ducts, trenches and/or tunnels required for interconnection of
the equipment with the infrastructures outside the boundaries of the
plot.
· If a culvert(s), and/or tunnel(s), trench(es) or any other underground
services are crossing streets, the street shall be constructed as a bridge
for truck loading without effecting the underground structures.
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
4871A95/S133Doc-801060045-7065
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
3. General requirements
· In addition to the civil works described in the previous paragraphs, the
following works are deemed to be included in this clause:
· all civil works (earthworks, manholes, etc.) necessary for buried
cables and pipes. It shall be noted that all buried pipes and cables
shall be protected under the roads by protection pipes and
protection slabs of reinforced concrete.
· all demolition and relocation works of the existing underground
services due to the new cable and pipe ducts/trenches and buried
pipes and cables.
4871A95/S133Doc-801060045-7065