Professional Documents
Culture Documents
Vol IX - PG B215 - Compressed Air
Vol IX - PG B215 - Compressed Air
TENDER DOCUMENTS
LOCATION: TITLE:
Western Coast VOLUME IX PART PG-B215
PACKAGE: TECHNICAL SPECIFICATION
INSTRUMENT AND SERVICE AIR SYSTEM
SCALE: REV:
None Q A 1 0 - H - 0 4 1 5 C
SUBCONTRACTOR:
Sheet 1 of 12
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
Disclaimer
The content of this document is intended for the exclusive use of Fichtner’s client and
other contractually agreed recipients. It may only be made available in whole or in part to
third parties with the client’s consent and on a non-reliance basis. Fichtner is not liable to
third parties for the completeness and accuracy of the information provided therein.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU PLANT
PHASE-3 PROJECT
Table of Contents
1. General 4
2. Scope of Works 5
2.1 Definition 5
2.2 Scope of Equipment / Items 5
3. Layout 7
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
1. General
This specification covers the complete separated service air and instrument
air systems for satisfactory operation.
The system and its components supplied to meet this Technical
Specification shall also conform to the applicable requirements of these and
other general articles or specifications of the Tender Documents.
However, if any equipment/device is not covered by the specification but
deemed to be necessary at the discretion of the Employer/Engineer for safe
and reliable operation of the system, it shall also be provided.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
2. Scope of Works
2.1 Definition
The service and instrument air system shall deliver all compressed air
required for all associated equipment of the plant for the following two
systems:
· Service air for operation of mechanical air tools, wrenches, fire-fighting
system pressure tank (if required) etc., during all modes of unit operation
and for maintenance purposes.
· Instrument air of high purity, oil-free and moisture-free compressed air to
all pneumatically operated plant instrumentation and control devices.
The service and instrument air system shall be connected to the similar
systems of the main Yanbu plant.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
· Skids requiring instrument air which shall have piping/ tubing fully
routed and connected to each user on the skid with a single connection on
the edge of the skid labelled: “Instrument Air Supply”
· Each instrument requiring air supply shall have a dedicated individual air
supply block valve on the air supply header.
· Contractor shall verify that the maximum and minimum air pressure
required for the users is adequate for valve actuation performance.
Maximum operating pressure supplied shall be within actuator maximum
operating pressure limit.
· All electrical connections up to the low voltage terminal boards of
panels, cubicles, motors, valves and pneumatically operated valves, etc.
· All interconnection piping for air distribution to all users of the GRS.
· All minor pipes necessary for installation and operation
· Lifting and hoisting devices for easy compressor maintenance
· All necessary base frames, base plates, anchor bolts, supports, etc.
· All steel parts embedded in foundation.
· All standard equipment and accessories that are normally included in the
delivery.
· Required platforms, stairs and ladders for operation and maintenance, as
specified in Volume IX- Part PG-B211 & Volume VII- Part P-B0.11.
· Contractor shall provide an overall instrument air consumption table for
all packages associated with the GRS equipment and project.
· Metallurgy for instrument air header shall meet the project piping class
specification as defined by the Contractor or Company/ Engineer.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
3. Layout
The air compressors and the air dryers are located at the main Yanbu plant
in a building with adequate air ventilation system.
Major pipes and ducting are to be grouped logically and shall be laid on
sleepers or pipe racks.
The operating pressure of the system is about 8.0 bar gauge on the user
terminal during normal operation. The pressure variations must not exceed
1.0 bar. This requires a minimum discharge pressure for the compressor of
9.0 bar gauge plus all pressure losses in the system. There shall be a
pressure difference between the instrument and service air system of at least
0.5 bar.
The terminal valves must restrict the maximum possible air flow to the
actually required one in order to avoid excessive pressure losses in case of
failure.
The leak rate of the complete system must be less than the value specified in
Part P-A5 “Inspection and testing”.
The instrument air and service air systems shall have different pipe color,
which shall be as per Employer’s standard.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
4.1 General
The pipes and material shall conform to high standards of engineering,
design, workmanship and construction and shall be capable of operating
efficiently and satisfactorily without excessive wear or maintenance under
the service conditions.
In any case the noise shall be less than 85 dBA at 1 m distance from the
noise source.
The continuous large users shall be equipped with a trip valve. It shall stop
the airflow if the air pressure drops below a certain value. Should this not be
acceptable, other measures such as separate piping shall be provided.
Certain reliable measures against pressure drops are required for single large
users.
However, upon failures, e.g. hose rupture, pressure drops shall be avoided.
This shall be achieved by flow restriction devices on each user terminal.
All temporary and hose connections shall be limited to the pipes with a
quick shut-off coupling.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
The vessels shall be of galvanized carbon steel and located outside the
building under a sunshade.
Between vessel bottom head and drain valve a sight glass shall be provided
to detect condensate. Draining must be possible when the vessel is
pressurized.
For continuous service air user, fixed connections are required. The air
system shall be piped to the equipment nozzle. Isolating and non-return
valves shall be provided close to the equipment, either directly on the
provided equipment nozzle or 1 m apart from the equipment.
The pipe sizing shall ensure low noise, moderate velocities, small pressure
drop, virtually no pressure pulsation and a large storage volume.
The total pressure drop to any consumer shall not exceed 0.3 bar measured
between air receiver and the consumer during its peak consumption and also
during normal consumption of all other users.
In the distribution piping the velocities shall not exceed 6.0 m/s for normal
operating conditions and 10.0 m/s for peak consumption.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
The design of the piping system with all accessories like vents, drains,
fittings and instrument connections shall be as specified in Part P-B0.1
“Mechanical Equipment and Piping”.
The branch pipes shall be distributed in such a way that all individual lines
terminate near the users and shall be provided with isolating valves at the
beginning and at the end.
Except for throttling services, all valves shall be ball valves. Their free cross
section shall be identical with the connected pipes. Valve casing materials
shall be made from spherical graphite cast iron or welded carbon steel
construction. Internals shall be resistant against the media handled. The
offered materials and valve design shall be subjected to the approval of the
Engineer.
Pipe materials shall be hot dip galvanized carbon steel. Only the short (less
than 2 m) connecting piping between the sub-headers for instrument air and
the instruments shall be made of seamless copper pipes 6 x 1 mm, according
to DIN 1754 or equivalent. Fittings shall be made of copper or brass
compression type according to DIN 2353 or equivalent.
The pipe connections shall be carried out as screwed ones up to DN 50. For
pipe sizes DN 80 and upwards on control and isolating valves, equipment,
etc. and where technically advisable, flange connections shall be used. Site
welding of hot dip galvanized pipes shall not be permitted.
The number of connections from ring main and headers shall be at least 15
% larger than necessary at design stage. They shall serve for future air
consumers. Each of these connections shall be equipped with a ball valve.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
The dampers are small, welded air storage vessels installed next to the
consumer, sized for the needs of that consumer.
The number and distribution of the air stations shall allow to reach any point
inside the buildings as well as all equipment in other plant areas, with a 15
m long hose connected to a local air station.
4871A95/S133Doc-801060045-7069
CONSTRUCTION OF SALES GAS SUPPLY PIPELINE TO YANBU
PLANT PHASE-3 PROJECT
The piping system shall be made of galvanized pipes. The valves shall be of
corrosion resistant material.
The inner equipment surfaces possibly in contact with humid air, shall be
galvanized or made from corrosion resistant or corrosion free material.
4871A95/S133Doc-801060045-7069