COMPANY :JONT OPERATIONS. PROJECT : JO-SC459-MM19 - Maintenance of Tanks, Vessels & Welding Services
CONTRACTOR: GULF SPIC.
PROCEDURE NO: LOCATION: MGC/WAFRA DATE: 13/09/2022
REPORT NO: O1.
Description Of Work :FINAL INSPECTION FOR FIBER GLASS LINING OF BOTTOM PLATE AND SHELL UPTO 1.5 MTR.AFTER GEL COAT. At TK 103A
Instruments Used
DATE TIME DRY DEW POINT RH% ST
Instruments Instrument Calibration
Used No. Status
Dew Point
E 420236 12/27/2022
Meter
High Voltage
Holiday E 26330 1/7/2023
detector
Bacth No
Paint Used Manufacturer Color WFT Avg. DFT Thinner No % Of Thinner
Base Curing Agent
Interline 925 International 2621121067 2621107060 Cream 300 2500 - -