Save trees use e-Question Paper Go green
DOWNLOAD THIS FREE AT www.viuresource.com
ua LI 10C) )
Seventh Semester B.E. Degree Examination, Dec.2016/Jan.2|
Pavement Materials and Construction
Time: 3 hrs, Max. Mad
Note: Answer any FIVE full questions, selects @
‘atleast TWO questions from each part.
Bring out the major differences between bitumen ar be the laboratory procedure
‘or determination of hardness property of bitumen, (0 Marks)
'b. Describe the chemical constitution of bitumgg and I desirable requirements of
bitumen, (0 Mares)
PART.
1a Givea briet write up on importance of derivable properties offfoad agafegates. Describe the
Iaboratory procedure for determination of toughness pro ‘agpfegates. (10 Marks)
Explain the Rothfusch method of desired gradation t ‘10 Marks)
0, willbe reetedas mle,
3 a, Compare the salient characteristics of sions and describe under what
circumstance each one is used.
1 What is stripping of bitumen? What are Peitects? How is the extent of bitumen
stripping estimated in the lab? (10 Marks)
Explain the steps in bituminous ml co stark)
ABC mix is prepare with \d C inthe proportion A: B: C= 40 : 50: 10.
‘The respective specific BARE C and bitumen are 2.7, 2.8, 3.0 and 1.02. The
bitumen content by weigh is 5%. Determine the maximum theoretical density,
percentage air voids, ‘en aggregates, voids filled with bitumen given that the
specimen weighs 1254 § ¢ i 720.6 g in water. (1a Marks)
PART-B
What is a clamshell sketch explain its operation and applications. 10 Marks)
Write an expligrory non Rollers in road construction. (10 Marks)
Deseri ‘method and quality control tests in subgrade. comtaris)
inees in which construction of embankment becomes necessary.
Ga ntartsy
suitability of following in bituminous pavement construction:
ing ii) Penetration macadam
fii) Bituminous premixed carpet iv) Builtup spray grout cro mars)
olayhe materi pein and construction steps in Bik-op yy grout 0 Mara)
Lay reveling of efit, gppeal alu ab ores weno 248
fly deseribe the quality control tess used in construction of conerete pavements
(Ho Marks)
“Write @ note on various types of joints in concrete pavement indicating their purpose of
roving (0 Marks)
Inporan Not: 1, On camping youranses, comply daw goal ros ines om he eating Bk ages.
BRANCHES | ALL SEMESTERS | NOTES | QUESTON PAPERS | LAB MANUALS
A Viuresource Go Green initiative