Professional Documents
Culture Documents
Gypsum False Ceiling Work
Gypsum False Ceiling Work
Check list
3 Are materials used for False ceiling are as per the specifications?
4 Are the required service work s above the false ceiling complete? ( )
Are Provision made for Electrical and HVAC services given as per
4
drawings? ( )
1/2
Stage (Post Execution) Witness: ✔ Drawing: ✔
Are the levels and alignment check ed for gypsum ceiling after
1
completion of work ?
Notes:
1. EQC (Element of Quality Control)
2. P indicates pass
3. F indicates fail
4. is mandatory photograph for point
5. is mandatory remark for point
6. ✔ required
7. ✘ not required
2/2